Patel Colossus Phase 1

By Patel Group & Co

RG-MH-75568 · RERA P51700010242 · Last updated on MahaRERA portal: 14 May 2018

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 46 months past the filed date
  • 24 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2022Possession promised46 months past this date
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 30%
24Complaints at MahaRERAon this registration
Jump to the 13 documents Report an error

Patel Colossus Phase 1 is a Residential / Group Housing project by Patel Group & Co in Thane, Maharashtra, registered with MahaRERA as P51700010242 on 24 Aug 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. 24 complaints are on record with the regulator.

At a glance

Project

  • NamePatel Colossus Phase 1
  • TypeResidential / Group Housing
  • Location
    • Kalyan
    • Kalyan-Dombivali (M Corp.)
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700010242
  • ReraGenie IDRG-MH-75568

Builder

  • NamePatel Group & Co
  • Entity typePartnership
  • PartnerRittu Wasnik
  • Other registrations3 more →
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

46 months past promisethis monthRegisteredAug 2017PromisedDec 2022

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Aug 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed13 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower A1NA320000
Tower A2NA320000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 14 May 2018, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 30%.

Tower A115%
ActivityProgress
Excavation30%
Basement (if any)30%
Podiums (if any)30%
Plinth30%
Stilt Floor30%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower A215%
ActivityProgress
Excavation30%
Basement (if any)30%
Podiums (if any)30%
Plinth30%
Stilt Floor30%
Slabs of Super Structure5%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 May 2018, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed450

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots450
Closed/Covered450
BuildingClosed/CoveredTotal
Tower A1225225
Tower A2225225

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,141 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI81790.03
Proposed, not sanctioned62,506 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAxis Bank, Orbit Commercial Complex, Godrej Hill, Khadak Pada, Kalyan West, Thane 421301

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch A G Jathar
PartnerRole in project
Patel Group & Co-

Litigation declared5

CaseCourtStatus
5070/2015Bombay High CourtDismiss
60/2016Kalyan Session CourtHearing
ARBPL/1171/18/2018Bombay High CourtPending
ARBPL/1171/18/2018Bombay High Courtpending
ARBPL/1171/18/2018Bombay High CourtPending

Complaints filed with MahaRERA24

Case no.ComplainantRespondentFiled
CC006000000001937Pranav MandeliaHasmukh Patel20/11/2017
CC006000000055078Capt Vinod Kumar TrilokinathM/S Patel Group & co.25/06/2018
CC006000000023282Vibha N BaljekarPatel Group & Co08/02/2018
CC006000000044402Dr. Prabhakaran B. Chetty & Mrs. Nandhini P. ChettyPatel Group & Co.04/05/2018
CC006000000055605SAJAN JOHNPATEL GROUP AND CO.01/08/2018
CC006000000055611NITESH BHAMREPATEL GROUP AND CO.02/08/2018
CC006000000055612OOMEN VERGHESEPATEL GROUP AND CO.02/08/2018
CC006000000055617SWAPNIL METLARPATEL GROUP AND CO02/08/2018
CC006000000055661VIMALA A KOTHAWADEPATEL GROUP AND CO04/08/2018
CC006000000055663VIJAY USHIRPATEL GROUP AND CO04/08/2018
CC006000000055775K RAGHUNATHAN NAIRPATEL GROUP AND CO13/08/2018
CC006000000056792SURAJ KUHIKARPATEL GROUP AND CO31/10/2018
CC006000000056796Mrs maDHUS AHUJAPATEL GROUP AND CO01/11/2018
CC006000000057109UTTAM LAXMAN SARAFEPATEL GROUP AND CO30/11/2018
CC006000000055767VILAS PANDURANG MUTKEPATEL GROUP & CO14/08/2018
CC006000000375242prabhakar chettyM/S PATEL GROUP13/04/2023
CC006000000375239jyoti bhaleraoM/S PATEL GROUP12/04/2023
CC006000000375254SANJEEV POOJARYM/S PATEL GROUP AND CO13/04/2023
CC006000000395558srujar kuhikarM/S PATEL GROUPAND CO07/05/2023
CC006000000396120jayesh kothawadem/s patel group and co.07/06/2023
CC006000000408138swapnil metkarPATEL GROUP AND CO11/11/2023
CC12502748HIMANSHOO ALIAS HIMANSHUBHAI J DOSHIPatel Group & Co05/08/2025
CC12502749HIMANSHOO ALIAS HIMANSHUBHAI J DOSHIPatel Group & Co05/08/2025
CC12502969RADHAKRISHNAN EZHUTHACHANPatel Group & Co23/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed13

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PAN CardFile: pgcpancard.pdf14 May 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf14 May 2018
Building plan approvalFile: IOD (1).pdf31 Jul 2017
Layout approvalFile: Layout_Plan_of_MAHADA.pdf31 Jul 2017
Copy of the legal title reportFile: Title_Certificate.pdf31 Jul 2017
Details of encumbrancesFile: Mortgage Deed 2 - Diwan Housing.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout_Plan_of_MAHADA.pdf31 Jul 2017
Building Plan Approval (IOD)File: IOD (1).pdf31 Jul 2017
Declaration in FORM BFile: Form B.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Patel_Colossus_Form_2_Phase_1.pdf31 Jul 2017
Certificates of CA (Form 3)File: Form 3 Phase 1.pdf31 Jul 2017
Proforma of Allotment letterFile: Declaration for AFS.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Patel Colossus Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan7,600+ in Thane

2 kmPatel Colossus Phase 1Completed 77Lapsed / revoked 45Other 119Dot size: filed unitsN

Filed coordinates, straight-line distance. 241 registered projects within 2 km.

Builder: Patel Group & Co

Patel Group & Co has 4 registrations on MahaRERA, including Patel Colossus Phase 1 and Patel Colossus Phase II. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Patel Colossus Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Patel Colossus Phase 1 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Patel Colossus Phase 1?

The registered promoter entity is Patel Group & Co, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Patel Colossus Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Patel Colossus Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Patel Colossus Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Patel Colossus Phase 1?

The professionals named in the filing: Architect: Arch A G Jathar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Patel Colossus Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Patel Colossus Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Patel Colossus Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.