PARVATI MAYA BUILDING NO.1
RG-MH-17951 · RERA P99000066538 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PARVATI MAYA BUILDING NO.1 is a Others project by HARSH DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000066538 on 11 Jun 2024. Possession is promised by 31 Dec 2027. 20 of the 82 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NamePARVATI MAYA BUILDING NO.1
- TypeOthers
- Location
- KOPARI VILLAGE
- VIRAR EAST
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401305
- Pincode401305
- RERA no.P99000066538
- ReraGenie IDRG-MH-17951
Builder
- NameHARSH DEVELOPERS
- Entity typePartnership
- PartnersJEETMAL GANESHLAL JAIN, VINOD MADALAL JAIN, PREMSHANKAR UDAYLALJI PUROHIT
- Other registrations2 more →
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Jun 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed65 files
Current status
Figures as on 20 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PARVATI MAYA BUILDING NO 1 | NA | 8 | 7 | 77 | 5 | 82 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.
PARVATI MAYA BUILDING NO 1: 37% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| JAYENDRA KAMLAKAR PATIL | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PARVATI MAYA BUILDING NO 1 | NA | Rs 8.01 cr | Rs 6.01 cr |
| - | NA | Rs 1.00 cr | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KULDEEP B PATIL |
| Engineer | GR CONSULTANTS |
| Chartered Accountant | DOLLY MILAN ASHAR |
| Partner | Role in project |
|---|---|
| HARSH DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1 safal (1).pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: 8-FORM 2(31_12_2025).pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Harsh Developers.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 8-FORM 1(30_12_2025).pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: 8-FORM 2(31_12_2025).pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Harsh Developer Form 3 signed.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: 7-FORM 1(30_09_2025).pdf | 5 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2-30 JUNE 24.pdf | 5 Oct 2025 |
| Withdrawal Update Form 3File: From 3 chartered accountants certificate .pdf | 5 Oct 2025 |
| Form 1File: FORM 1-(31032015).pdf | 9 Jul 2025 |
| Form 2File: FORM 2(31 03 2025).pdf | 9 Jul 2025 |
| Form 3File: FORMJ 3.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD LIST.pdf | 9 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-(31032015).pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Harsh Devlopers Form-3.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2(31 03 2025).pdf | 14 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Harsh Devlopers Discloser of sold.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1(31_12_2024).pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 harsh developers.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2(31_12_2024).pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1(30 09 2024).pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2(30 09 2024).pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 -07 JULY 24.pdf | 16 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 -30 JUNE 24.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-30 JUNE 24.pdf | 18 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM- 2A 31 MARCH 24.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold.pdf | 18 Jul 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format a seperate bank account rera (1).pdf | 18 Jul 2024 |
| Building plan approvalFile: architect declaration.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: architect declaration.pdf | 30 May 2024 |
| Declaration about Commencement CertificateFile: Declaration abt Commencement Certificate latest.pdf | 30 May 2024 |
| Other - TechnicalFile: declaration cum undertaking new.pdf | 30 May 2024 |
| Other - TechnicalFile: email send to rera cc new.pdf | 23 May 2024 |
| Other - TechnicalFile: Declaration Regarding plot area merged LATEST_11zon.pdf | 23 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: appendix -F new merged.pdf | 16 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Order 5959 new (1).pdf | 16 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW ORGANISED.pdf | 16 May 2024 |
| Other - TechnicalFile: Declaration Regarding plot area merged LATEST_11zon.pdf | 16 May 2024 |
| Copy of the legal title reportFile: TITLE AND SEARCH(RERA)_11zon new.pdf | 23 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 new.pdf | 23 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 new1.pdf | 23 Apr 2024 |
| Building plan approvalFile: Blueprint.pdf | 20 Mar 2024 |
| Layout approvalFile: Layout.pdf | 20 Mar 2024 |
| PAN CardFile: PAN CARD (2).pdf | 20 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Enb Concerned to Finance.pdf | 20 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Enb Concerned to Legal.pdf | 20 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Enb Concerned to Finance.pdf | 20 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Enb Concerned to Legal.pdf | 20 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 20 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Blueprint.pdf | 20 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 20 Mar 2024 |
| Declaration in FORM BFile: form b harsh dev.pdf | 20 Mar 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200300290814_For_Asset_Based_Search_14_03_2024_13_16_04_354.pdf | 20 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Jeetmal Ganeshlal Jain.pdf | 20 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Premshankar Udaylalji Purohit.pdf | 20 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Vinod Madanlal Jain.pdf | 20 Mar 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE(RERA)_11zon.pdf | 20 Mar 2024 |
| Proforma of Allotment letterFile: allotment letter merged.pdf | 20 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Harsh Developers.pdf | 20 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Rep for Allotment Letter.pdf | 20 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Rep for Agreement Sale.pdf | 20 Mar 2024 |
| Other - LegalFile: PARTNERSHIP DEED.pdf | 20 Mar 2024 |
| Other - LegalFile: DEV AGREEMENT.pdf | 20 Mar 2024 |
| Other - TechnicalFile: email send to maharera.pdf | 20 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PARVATI MAYA BUILDING NO.1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near VIRAR EAST3,200+ in Palghar
AV PEARL BLDG NO.4 WING BCD
AVM BUILDCON LLP
HARI RESIDENCY PHASE I
LOTUS LAKSHMINARAYAN HOMES
Mrida Innovista Homes
NINE MEGACORP DEVELOPERS LLP
AV PEARL BUILDING NO. 3, C WING
AVM BUILDCON LLP
MJV CORPORATION
VYANKATI CHINNAVISHRWAPAPA SAMAKOTI
AV PEARL BUILDING NO. 3, WING B
SHREE SAI JIVDANI DEVELOPERS LLP
See every Palghar project, with the district possession charts
Builder: HARSH DEVELOPERS
HARSH DEVELOPERS has 3 registrations on MahaRERA, including JANARDAN SWAPNA and Svayam. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if PARVATI MAYA BUILDING NO.1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PARVATI MAYA BUILDING NO.1?
The registered promoter entity is HARSH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PARVATI MAYA BUILDING NO.1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PARVATI MAYA BUILDING NO.1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PARVATI MAYA BUILDING NO.1?
The professionals named in the filing: Architect: KULDEEP B PATIL; Engineer: GR CONSULTANTS; Chartered Accountant: DOLLY MILAN ASHAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PARVATI MAYA BUILDING NO.1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.