PARSHURAM TOWER

By MORESHWAR CONSTRUCTIONS

RG-MH-04514 · RERA P51700025480 · Last updated on MahaRERA portal: 6 Jun 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
14 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 92%
43 of 73Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

PARSHURAM TOWER is a Others project by MORESHWAR CONSTRUCTIONS in Thane, Maharashtra, registered with MahaRERA as P51700025480 on 6 Jun 2020. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 12 months from the original filing. 30 of the 73 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NamePARSHURAM TOWER
  • TypeOthers
  • Location
    • VILLAGE MHARAL GAON
    • TALUKA KALAYN
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • RERA no.P51700025480
  • ReraGenie IDRG-MH-04514

Builder

  • NameMORESHWAR CONSTRUCTIONS
  • Entity typePartnership
  • GSTIN27ABCFM5008M1Z5
  • PartnerDILIP PARSHURAM KONGERE
  • Declared earlier projects1 →

Key dates

1 months past promisethis monthRegisteredJun 2020First promiseSep 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Jun 2020
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Sep 2025)
  • Buildings2 building records
  • Documents filed83 files

Current status

41%30 of 73 units booked
66.4%Work done, per cost certificate

Figures as on 6 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 3NA9742042
BUILDING NO 4NA9803131

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 6 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 92%.

BUILDING NO 350%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises14%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.7%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes65%
Street LightingYes70%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes70%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered25
Open Space10
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 313518
BUILDING NO 412517

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,825 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Sep 2024

Approvals and building plan

Sanctioning authorityDistrict Collector of Thane
Permissible FSI2390.5
Proposed, not sanctioned2,390 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 15 TO 18 SAI MALA GARDEN 410204
Estimated costRs 10.92 cr
Cost incurredRs 7.25 cr
Work done66.43%
BuildingWingEstimatedIncurred
BUILDING NO 3NARs 6.21 crRs 2.62 cr
BUILDING NO 4NARs 4.36 crRs 4.36 cr
-NARs 35.00 lakhRs 27.86 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGEO ASSOCIATES ARCHITECT & ENGINEERS
EngineerGEO ASSOCIATES ARCHITECT & ENGINEERS
Chartered AccountantVinesh Ahuja
Chartered AccountantGIRISH TARWANI
Chartered AccountantGirish S Tarwani
Chartered AccountantSU RADHAKRISHNANI
PartnerRole in project
MORESHWAR CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019608Sep 2025 → Sep 2026

Reason as filed by the promoter.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Sep 24.pdf6 Jun 2026
Form 2File: Form 2 Sep 24.pdf6 Jun 2026
Form 3File: Form 3 Sep 24.pdf6 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold dec.pdf6 Jun 2026
Form 1File: Form 1 Jan 25.pdf5 Jun 2026
Form 2File: Form 2 Jan 25.pdf5 Jun 2026
Form 3File: Form 3 Jan 25.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold dec.pdf5 Jun 2026
Form 1File: Form 1 Mar 25.pdf5 Jun 2026
Form 2File: Form 2 Mar 25.pdf5 Jun 2026
Form 3File: Form 3 Mar 25.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold dec.pdf5 Jun 2026
Form 1File: Form 1 Sep 24.pdf5 Jun 2026
Form 2File: Form 2 Sep 24.pdf5 Jun 2026
Form 3File: Form 3 Sep 24.pdf5 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold dec.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1 Moreshwar.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1 signed.pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2 signed.pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2 Moreshwar.pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2 signed.pdf5 Jun 2026
Withdrawal Update Form 3File: Form 3 signed.pdf5 Jun 2026
Withdrawal Update Form 3File: Form 3 signed compressed.pdf5 Jun 2026
Withdrawal Update Form 3File: Form 3 signed.pdf5 Jun 2026
Form 2A (FY 2024-2025)File: 2A 24-25 signed final.pdf5 Jun 2026
Form 2A (FY 2023-2024)File: 2A 23-24 signed.pdf5 Jun 2026
Form 2A (FY 2022-2023)File: 2A 22-23 signed final.pdf5 Jun 2026
Form 2A (FY 2021-2022)File: 2A 21-22 signed.pdf5 Jun 2026
Form 2A (FY 2020-2021)File: 2A 20-21 signed.pdf5 Jun 2026
Form 5 (FY 2023-2024)File: Form 5 23-24.pdf5 Jun 2026
Form 5 (FY 2022-2023)File: Form 5 22-23.pdf5 Jun 2026
Form 5 (FY 2021-2022)File: Form 5 21-22.pdf5 Jun 2026
Form 5 (FY 2020-2021)File: Form 520-21.pdf5 Jun 2026
Withdrawal Update Form 1File: Arch.pdf4 Jun 2026
Withdrawal Update Form 2File: Eng.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3 Signed.pdf4 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed_compressed.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (3).pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (5).pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Moreshwar FY 23-24.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect 1.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer 1.pdf8 Oct 2024
Building plan approvalFile: New Plan.pdf2 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: New Plan.pdf2 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: New CC_11zon.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Moreshwar CA.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Moreshwar.pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect.pdf5 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf5 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Moreshwar Const.pdf2 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MORESHWAR CONSTRUCTION PHASE III FORM 1.pdf14 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: MORESHWAR CONSTRUCTION PHASEIII FORM 2.pdf14 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Moreshwar 2021-22.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Moreshwar B4 Audit From.pdf20 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: moreshwar B4.pdf11 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert.pdf1 Jun 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert.pdf1 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf17 Mar 2020
Proforma of Allotment letterFile: RERA AFS Kongere (2).pdf17 Mar 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf17 Mar 2020
Details of encumbrancesFile: Form B.pdf6 Mar 2020
Declaration in FORM BFile: Form B.pdf6 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_compressed.pdf26 Feb 2020
OtherFile: Kamalakar Membership Certificate.PDF25 Feb 2020
Layout approvalFile: PLAN LAYOUT.pdf23 Dec 2019
Building plan approvalFile: LAYOUT BUILDING PLAN.pdf23 Dec 2019
PAN CardFile: Pan Card.pdf23 Dec 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PARSHURAM TOWERAT MHARAL PADA KALYAN28CompletedMar 2020Mar 2020

How this compares with Thane

41%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARSHURAM TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALUKA KALAYN7,600+ in Thane

Builder: MORESHWAR CONSTRUCTIONS

MORESHWAR CONSTRUCTIONS has 1 registration on MahaRERA, including PARSHURAM TOWER. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PARSHURAM TOWER is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARSHURAM TOWER?

The registered promoter entity is MORESHWAR CONSTRUCTIONS, a partnership as per the filing. Its GSTIN 27ABCFM5008M1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARSHURAM TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARSHURAM TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARSHURAM TOWER?

The professionals named in the filing: Architect: GEO ASSOCIATES ARCHITECT & ENGINEERS; Engineer: GEO ASSOCIATES ARCHITECT & ENGINEERS; Chartered Accountant: Vinesh Ahuja; Chartered Accountant: GIRISH TARWANI; Chartered Accountant: Girish S Tarwani; Chartered Accountant: SU RADHAKRISHNANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARSHURAM TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARSHURAM TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARSHURAM TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.