Red flags

  • Possession 2 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
12 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

PARKWAY MANOR is a Residential / Group Housing project by GAUTAM EKANATH THAKUR in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052927 on 5 Oct 2023. Possession was promised by 31 Aug 2026 and is now 2 months past that date. 4 of the 16 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NamePARKWAY MANOR
  • TypeResidential / Group Housing
  • Location
    • K/E WARD
    • PLOT NO 292 CTS NO 292
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052927
  • ReraGenie IDRG-MH-06348

Builder

  • NameGAUTAM EKANATH THAKUR
  • Entity typeIndividual

Key dates

2 months past promisethis monthRegisteredOct 2023PromisedAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Oct 2023
  • Promised completion31 Aug 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

25%4 of 16 units booked
88.1%Work done, per cost certificate

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARKWAY MANORNA9816016

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

PARKWAY MANOR: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNo100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area493 sq m
Land owned byNot the promoter
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Jun 2025
LandownerVillageDistrict
Surekha S. SarangdharMumbai CityMumbai City
Shaila Prabhakar GoreMumbai CityMumbai City
Sudhir Madhukar GorayMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI1331.77
Proposed, not sanctioned1,332 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivaji park
Estimated costRs 12.77 cr
Cost incurredRs 11.24 cr
Work done88.06%
BuildingWingEstimatedIncurred
PARKWAY MANORNARs 10.60 crRs 9.30 cr
-NARs 2.17 crRs 1.94 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmber Vasant Natekar
EngineerKaivant Champaklal Shah
EngineerSanjay Shubash Bari
Chartered AccountantAmit Jayendra Sheth
Chartered AccountantVishnu Krishna Kanhere
PartnerRole in project
GAUTAM EKANATH THAKUR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf1 May 2026
Withdrawal Update Form 2File: Form 2.pdf1 May 2026
Withdrawal Update Form 3File: fORM 3.pdf1 May 2026
Form 2A (FY 2025-2026)File: Site Supervisor Certificate ssb maharera 4.pdf1 May 2026
Withdrawal Update Form 1File: NSB-PM-FORM-1-IX-I-26.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf29 Jan 2026
Form 5 (FY 2024-2025)File: Form 5.pdf8 Dec 2025
Withdrawal Update Form 1File: NSB-PM-FORM-1-VIII-X-25.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 KC Shah.pdf18 Oct 2025
Withdrawal Update Form 3File: Online and Manual.pdf18 Oct 2025
Withdrawal Update Form 1File: ONLINE AND MANUAL FORM 1.pdf31 Jul 2025
Withdrawal Update Form 1File: ONLINE AND MANUAL FORM 1.pdf31 Jul 2025
Withdrawal Update Form 1File: ONLINE AND MANUAL FORM 1.pdf31 Jul 2025
Withdrawal Update Form 2File: ONLINE AND MANUAL FORM 2.pdf31 Jul 2025
Withdrawal Update Form 2File: ONLINE AND MANUAL FORM 2.pdf31 Jul 2025
Withdrawal Update Form 2File: ONLINE AND MANUAL FORM 2.pdf31 Jul 2025
Withdrawal Update Form 3File: ONLINE AND MANUAL FORM 3.pdf31 Jul 2025
Withdrawal Update Form 3File: ONLINE AND MANUAL FORM 3.pdf31 Jul 2025
Withdrawal Update Form 3File: ONLINE AND MANUAL FORM 3.pdf31 Jul 2025
Building plan approvalFile: Building Plan Approval.pdf29 Jul 2025
Building plan approvalFile: Building Plan Approval.pdf29 Jul 2025
Form 1File: FORM 1.pdf30 Jun 2025
Form 2File: Form 2.pdf30 Jun 2025
Form 3File: form 3 online.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold inventory.pdf30 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A Final Form.pdf30 Jun 2025
Form 5 (FY 2023-2024)File: Form-5-FOR AUDIT CA CERTIFICATE.pdf30 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Site Superwiser Certificate -March-24.pdf6 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_RERA.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: FULL CC.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5.pdf8 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate revalidation.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf6 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect's Certificate-Amber Natekar-March-24.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Site Superwiser Certificate -March-24.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 UPLOADED.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf29 Jan 2024
Building plan approvalFile: Am-Plan-II-Plans_compressed.pdf6 Nov 2023
Building plan approvalFile: Amendletter_II_signed.pdf6 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Am-Plan-II-Plans_compressed.pdf6 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Amendletter_II_signed.pdf6 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 9793_FirstCC_Amend_signed.pdf6 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf26 Aug 2023
Declaration about Commencement CertificateFile: Declaration for CC.pdf26 Aug 2023
Declaration in FORM BFile: Form B - PROMOTER.pdf26 Aug 2023
CERSAI detailsFile: Declaration for no cersai report.pdf26 Aug 2023
Proforma of Agreement for saleFile: Agreement for Sale_11zon.pdf26 Aug 2023
Deviation Report with respect to model copy of AgreementFile: DECLARATION FOR DEVIATION IN RESPECT OF AGREEMENT FOR SALE_DATED.pdf26 Aug 2023
CERSAI detailsFile: CERSAI_Search_Report_200274940393_For_Asset_Based_Search_20_07_2023_13_36_56_945.pdf20 Jul 2023
Building plan approvalFile: Building Plan.pdf18 Jul 2023
Layout approvalFile: Building Plan.pdf18 Jul 2023
PAN CardFile: Pancard.pdf18 Jul 2023
Copy of the legal title reportFile: Legal title report_compressed (1).pdf18 Jul 2023
Details of encumbrances concerned to FinanceFile: DECLARATION FOR NO FINANCIAL ENCUMBRANCES.pdf18 Jul 2023
Details of encumbrances concerned to FinanceFile: DECLARATION FOR NO LEGAL ENCUMBRANCES.pdf18 Jul 2023
Details of encumbrances concerned to LegalFile: DECLARATION FOR NO FINANCIAL ENCUMBRANCES.pdf18 Jul 2023
Details of encumbrances concerned to LegalFile: DECLARATION FOR NO LEGAL ENCUMBRANCES.pdf18 Jul 2023
Copy of Layout Approval (in case of layout)File: Building Plan.pdf18 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTERED ACCOUNTS CERTIFICATE (1)_11zon.pdf18 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest in Other Real Estate Organizations.pdf18 Jul 2023
Proforma of Allotment letterFile: 05_07_2023 - Allotment letter - NSB Properties - highlighted.pdf18 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION FOR SEPARATE BANK ACCOUNT.pdf18 Jul 2023
Deviation Report with respect to Allotment letterFile: DECLARATION FOR DEVIATION IN RESPECT OF ALLOTMENT LETTER_New.pdf18 Jul 2023

How this compares with Mumbai Suburban

25%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARKWAY MANOR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PLOT NO 292 CTS NO 2926,700+ in Mumbai Suburban

2 kmPARKWAY MANORCompleted 112Lapsed / revoked 66Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 287 registered projects within 2 km.

Builder: GAUTAM EKANATH THAKUR

GAUTAM EKANATH THAKUR has 1 registration on MahaRERA, including PARKWAY MANOR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if PARKWAY MANOR is delayed beyond 31 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARKWAY MANOR?

The registered promoter entity is GAUTAM EKANATH THAKUR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARKWAY MANOR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARKWAY MANOR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARKWAY MANOR?

The professionals named in the filing: Architect: Amber Vasant Natekar; Engineer: Kaivant Champaklal Shah; Engineer: Sanjay Shubash Bari; Chartered Accountant: Amit Jayendra Sheth; Chartered Accountant: Vishnu Krishna Kanhere. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARKWAY MANOR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARKWAY MANOR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARKWAY MANOR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.