Home / Browse projects / Pune, Maharashtra / Parkland - I C building

Registration lapsed No litigation declared Residential / Group Housing project

Parkland - I C building

By Yashvastu Developers

RG-MH-04741 · RERA P52100020792 · Last updated on MahaRERA portal: 25 Nov 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Parkland - I C building is a Residential / Group Housing project by Yashvastu Developers in Pune, Maharashtra, registered with MahaRERA as P52100020792 on 10 May 2019. Possession was promised by 30 Mar 2024 and is now 31 months past that date.

At a glance

Project

  • NameParkland - I C building
  • TypeResidential / Group Housing
  • Location
    • GHORPADI GOAN
    • Ghorpadi Gaon Pune
    • Ghorpadi
    • Haveli
    • Pune
    • 411001
  • Pincode411001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020792
  • ReraGenie IDRG-MH-04741

Builder

  • NameYashvastu Developers
  • Entity typePartnership
  • PartnerSanjay Chandrakant Shah
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

31 months past promisethis monthRegisteredMay 2019PromisedMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 May 2019
  • Promised completion30 Mar 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building CNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Building C: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes100%

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered72

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,163 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPoona Municipal Corporation
Permissible FSI5407.25
Proposed, not sanctioned5,407 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchB T Kavade road Ghorpadi 411001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerJagadish Deshpande
EngineerFIDESTO PROJECTS PRIVATE LIMITED
Chartered AccountantPriyanka Chordiya & Associates
Chartered AccountantSAC & CO LLP
PartnerRole in project
Yashvastu Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Dec 2023

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 .pdf25 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 parkland 1 CC 22012024 UPLOADED.pdf25 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 30092023.pdf15 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Formation Certificate.pdf15 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2 A 30092023.pdf15 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 30092023.pdf15 Nov 2024
Certificates of CA (Form 3)File: Form 3 Park Land Building-1-C 30062023 SIGN COPY_compressed.pdf14 Nov 2024
Certificates of CA (Form 3)File: Form 3 Park Land Building 1 C 30092023 SIGN COPY_compressed.pdf14 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 300623.pdf14 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 30092023.pdf14 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate CWingForm 31032023.pdf24 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate Form 2A Dt30052023.pdf24 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold 30032023.pdf23 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 fy 22-23 parkland 1 c both signed.pdf31 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate Rera Building C 12072022.pdf16 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 Engineer's Certificate 30032023.pdf16 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate Form2_opt.pdf15 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PL Engineers Certificate 300922_compress.pdf15 Jun 2023
Certificates of CA (Form 3)File: Form 3 30062022 parkland 1C-signed_Red.pdf15 Jun 2023
Certificates of CA (Form 3)File: Yash Vastu -Parkland-C-Form 3-30092022-Sign_Red.pdf15 Jun 2023
Certificates of CA (Form 3)File: form 3 Parkland I C Building 30032023 both sign_Red.pdf15 Jun 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE WITH NOC.pdf11 Feb 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE WITH NOC.pdf11 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of INTEREST JAYESH JAIN.pdf11 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSUREOF INTEREST SANJAY SHAH.pdf11 Feb 2023
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER_compressed.pdf11 Feb 2023
Proforma of Agreement for saleFile: Draft agreement yashvastu.pdf11 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate proiects.pdf11 Feb 2023
Deviation Report with respect to Allotment letterFile: No deviation.pdf11 Feb 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVIATON WITH RESPECT TO MODEL FOR AGREEMENT.pdf11 Feb 2023
Other - TechnicalFile: C WING PLINTH CHECKING.pdf11 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality assurance Certificate .pdf2 Feb 2023
Certificates of CA (Form 3)File: Form 3 31122022-both sign_compressed.pdf2 Feb 2023
PAN CardFile: YASHVASTU DEVELOPERS PAN CARD.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 12012023.pdf1 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 27012023.pdf1 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 12012023.pdf1 Feb 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE 31122022.pdf1 Feb 2023
CERSAI detailsFile: cersai report.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Yash Vastu Parkland1C FY 202122 Sign.pdf27 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold.pdf28 Feb 2022
Certificates of CA (Form 3)File: Form 3 new 31122021 parkland 1c FINAL signed.pdf22 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_Yashvashtu Developers - C Wing.pdf19 Feb 2022
Declaration about Commencement CertificateFile: declaration c.pdf18 Sep 2021
Disclosure of sold/ booked inventoryFile: inventory.pdf18 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM230032021.pdf14 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 30062021.pdf14 Sep 2021
Certificates of CA (Form 3)File: FORM331032021.pdf14 Sep 2021
Certificates of CA (Form 3)File: FORM330062021.pdf14 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: March 2020.pdf1 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 2021.pdf1 Sep 2021
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE.pdf25 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Yash Vastu C wing.pdf25 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 C Building.pdf25 Aug 2021
Details of encumbrancesFile: Affidavit Cum Declaration 11.pdf4 May 2019
Declaration in FORM BFile: Affidavit Cum Declaration 11.pdf4 May 2019
Certificates of CA (Form 3)File: CA Certificate Form 3.pdf17 Apr 2019
Building plan approvalFile: Layout Plan.pdf30 Mar 2019
Layout approvalFile: Layout Plan.pdf30 Mar 2019
Copy of the legal title reportFile: Search Title Report.pdf30 Mar 2019
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf30 Mar 2019
Building Plan Approval (IOD)File: Layout Plan.pdf30 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf30 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE1.pdf30 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf30 Mar 2019
Proforma of Allotment letterFile: Draft Agreement.pdf30 Mar 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Park Land - 1 - iP52100002945ghorpadi, PuneAug 2017Certificate SignedDec 2021Registered original: Dec 2019Dec 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Parkland - I C building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghorpadi Gaon Pune13,700+ in Pune

2 kmParkland - I C buildingCompleted 163Lapsed / revoked 118Other 152Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: Yashvastu Developers

Yashvastu Developers has 3 registrations on MahaRERA, including Park Land - 1 - i and Parkland - I C building. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Parkland - I C building shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Parkland - I C building is delayed beyond 30 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Parkland - I C building?

The registered promoter entity is Yashvastu Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Parkland - I C building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Parkland - I C building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Parkland - I C building?

The professionals named in the filing: Engineer: Jagadish Deshpande; Engineer: FIDESTO PROJECTS PRIVATE LIMITED; Chartered Accountant: Priyanka Chordiya & Associates; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Parkland - I C building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Parkland - I C building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Parkland - I C building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.