Home / Browse projects / Pune, Maharashtra / PARK59

Registered No litigation declared Residential / Group Housing project

PARK59

By SHIV DEVELOPERS

RG-MH-15308 · RERA P52100024649 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 15 months from the original
38 of 45Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 95%
83 of 230Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 286 documents Report an error

PARK59 is a Residential / Group Housing project by SHIV DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100024649 on 26 Feb 2020. Possession is promised by 29 Dec 2027. The completion date has moved by 15 months from the original filing. 147 of the 230 units on this registration are recorded sold or booked, and 38 of 45 construction stages are filed complete.

At a glance

Project

  • NamePARK59
  • TypeResidential / Group Housing
  • Location
    • SURVEY NO 259/4 (P) WAKAD KASPATE ROAD NEAR AISHVARYAM GREEN SOCIETY
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024649
  • ReraGenie IDRG-MH-15308

Builder

  • NameSHIV DEVELOPERS
  • Entity typePartnership
  • GSTIN27ABQFS2269A1Z1
  • PartnersVIKRANT VILAS DEOKALE, YOGESH SUDAMRAO YADAV, PRITI NILESH TUNGAR, SACHIN DAGADU KANSE
  • Other registrations13 more →
  • Completed6 of 14
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredFeb 2020First promiseSep 2026Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Feb 2020
  • Promised completion29 Dec 2027
  • Revised completionRevised to 29 Dec 2027 (originally 30 Sep 2026)
  • Buildings5 building records
  • Documents filed286 files

Current status

64%147 of 230 units booked
89.8%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D BUILDINGNA131243043
C BUILDINGNA131267067
A BUILDINGNA121248048
B BUILDINGNA121248048
E BuildingNA8624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

38 of 45 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 95%.

D BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)100%
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E Building53%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)95%
Plinth95%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYesNot applicable
Open ParkingYesNot applicable

Parking filed652

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots652
Closed/Covered652
BuildingClosed/CoveredTotal
D BUILDING130130
C BUILDING131131
A BUILDING131131
B BUILDING129129
E Building131131

Land and ownership19

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,800 sq m
Land owned byThe promoter, with other names on the file
Named landowners19
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Feb 2026
LandownerVillageDistrict
Sudam Baburao YadavSangaviPune
Sharda Sudam YadavSangaviPune
Yogesh Sudam YadavSangaviPune
Sonal Mahesh BhosaleSangaviPune
Neela Shantaram ManeLoni-kalbhorPune
Meena Dattatray GaikwadKhadakwasalaPune
Bebi Dnyneshwar MateKhadakwasalaPune
Satyawan Shankar JagtapSangaviPune
Jawahar Mohan KaleAundhPune
Santosh Dnynoba WakadkarWakadPune
Suman Satish KaradeShivajinagar BhamburdaPune
Nandkishor Shankar KumbharPimple NilakhPune
Maruti Anandrao SasteChinchwadPune
Urmila Shankar AdkarSangaviPune
Anil Laxman GaikwadPashanPune
Rajkumar Uddhav KulkarniKothrudPune
Nitin Dnyneshwar Mate through Bebi Dnyneshwar MateKhadakwasalaPune
Nilesh Dnyneshwar Mate through Bebi Dnyneshwar MateKhadakwasalaPune
Gauri Dipak Ranawade alias Gauri Dnyeshwar Mate through Bebi Dnyneshwar MateKhadakwasalaPune

Approvals and building plan

Sanctioning authorityPimpari Chinchwad Municipal Corporation
Permissible FSI23235.35
Proposed, not sanctioned23,235 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS B ROAD PUNE
Estimated costRs 80.17 cr
Cost incurredRs 71.96 cr
Work done89.75%
BuildingWingEstimatedIncurred
E BuildingNARs 17.20 crRs 9.17 cr
A BUILDINGNARs 15.99 crRs 15.99 cr
B BUILDINGNARs 15.01 crRs 15.01 cr
C BUILDINGNARs 14.33 crRs 14.33 cr
D BUILDINGNARs 12.14 crRs 12.14 cr
-NARs 5.51 crRs 5.32 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShankar Nimbalkar
EngineerK P BADGUJAR CONSULTANT PVT LTD
EngineerRohinee Badgujar
EngineerGanesh Katke
Chartered AccountantANITA LAXMAN LIMAYE
Chartered AccountantRohit Jadhav
Chartered AccountantMahesh Malhotra
PartnerRole in project
SHIV DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13052620952Sep 2026 → Dec 2027

Reason as filed by the promoterThe project has been delayed due to the pending submission of revised sanction documents from our side. Revisions in the project layout and design required updates to the original plans, which are currently being finalized. We acknowledge the delay is on our part and are working to complete the necessary documentation and submit it to PMC at the earliest for revised approval. As a result, we are seeking an extension from RERA to account for this unavoidable delay and ensure that we can complete the project in compliance with all necessary regulations and requirements. The delay in issuance of

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Apr 2025

Documents filed286

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 286 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 dt.pdf20 Jul 2026
Withdrawal Update Form 2File: form 2 (14).pdf20 Jul 2026
Withdrawal Update Form 3File: SIGNED FORM 3 (1).pdf20 Jul 2026
Withdrawal Update Form 1File: Updated formate form1 with sign ss.pdf8 May 2026
Withdrawal Update Form 2File: form 2 with sign.pdf8 May 2026
Withdrawal Update Form 3File: System Generated FORM 3 s_compressed.pdf8 May 2026
Building plan approvalFile: b944d444-ad46-4d04-b052-5f90df7944e11.pdf6 Mar 2026
Layout approvalFile: 2a57e144-7675-4027-b7fa-d857be2b460f 1.pdf6 Mar 2026
Form 1File: Rera Update Certificate-21-06-2024 - Copy.pdf6 Mar 2026
Form 2File: Form 2.pdf6 Mar 2026
Form 3File: FORM 3.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold And Unsold.pdf6 Mar 2026
Form 1File: F1.pdf6 Mar 2026
Form 2File: F2.pdf6 Mar 2026
Form 3File: F3.pdf6 Mar 2026
Disclosure of Sold and Booked InventoryFile: SU.pdf6 Mar 2026
Form 2A (FY 2019-2020)File: park 59 form 2A 19-20.pdf6 Mar 2026
Form 2A (FY 2020-2021)File: park 59 form 2A 20-21.pdf6 Mar 2026
Form 2A (FY 2021-2022)File: park 49 from 2A 21-22.pdf6 Mar 2026
Form 2A (FY 2022-2023)File: Park form 59 form 2A 22-23.pdf6 Mar 2026
Form 2A (FY 2023-2024)File: park 59 from 2A 23-24.pdf6 Mar 2026
Form 2A (FY 2024-2025)File: park 59 form 2A 24-25.pdf6 Mar 2026
Form 2A (FY 2025-2026)File: park 59 form 2A 25-26.pdf6 Mar 2026
Form 5 (FY 2024-2025)File: form 5 2024-25_compressed.pdf6 Mar 2026
Form 5 (FY 2023-2024)File: form 5 2023-24_compressed.pdf6 Mar 2026
Form 5 (FY 2022-2023)File: form 5 2022-23_compressed.pdf6 Mar 2026
Form 5 (FY 2021-2022)File: form 5 2021-22_compressed.pdf6 Mar 2026
Form 5 (FY 2020-2021)File: form 5 2020-21_compressed.pdf6 Mar 2026
Building plan approvalFile: P2.pdf5 Mar 2026
Building plan approvalFile: P3.pdf5 Mar 2026
Building plan approvalFile: P4.pdf5 Mar 2026
Building plan approvalFile: P5.pdf5 Mar 2026
Building plan approvalFile: P6.pdf5 Mar 2026
Building plan approvalFile: P7.pdf5 Mar 2026
Building plan approvalFile: P8.pdf5 Mar 2026
Building plan approvalFile: P17.pdf5 Mar 2026
Building plan approvalFile: P18.pdf5 Mar 2026
Withdrawal Update Form 1File: Form1.pdf2 Mar 2026
Withdrawal Update Form 2File: Form2 (5).pdf2 Mar 2026
Withdrawal Update Form 3File: FORM 3_SHIV DEVELOPER_FINAL (1) (1)_compressed.pdf2 Mar 2026
Form 1File: FORM 1 WITH SIGN.pdf4 Feb 2026
Form 2File: FORM 2 WITH SIGN.pdf4 Feb 2026
Form 3File: FORM 3 WITH SIGN_compressed.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_compressed (6).pdf4 Feb 2026
Form 1File: Form 1.pdf30 Dec 2025
Form 2File: park 59 sep 25.pdf30 Dec 2025
Form 3File: Form 3_compressed (27).pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold unsold_compressed (4).pdf30 Dec 2025
Form 1File: Form 1 s.pdf12 Nov 2025
Form 2File: Form 2.pdf12 Nov 2025
Form 3File: form 3 (s.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf12 Nov 2025
Form 1File: Form 1.pdf12 Nov 2025
Form 2File: FORM 2PARK 59 DEC 20.pdf12 Nov 2025
Form 3File: Form 3.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold And Unsold.pdf12 Nov 2025
Form 1File: Form 1 (1).pdf12 Nov 2025
Form 2File: Form 2.pdf12 Nov 2025
Form 3File: Form 3 (1).pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf12 Nov 2025
Form 1File: Form 1.pdf12 Nov 2025
Form 2File: park 59 june 21 Form 2.pdf12 Nov 2025
Form 3File: Form 3 (1).pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold And Unsold.pdf12 Nov 2025
Form 1File: Form 1 (1).pdf12 Nov 2025
Form 2File: Park 59 sep 21 Form 2.pdf12 Nov 2025
Form 3File: Form 3 (2)_compressed (2).pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf12 Nov 2025
Form 1File: Form 1 (2).pdf12 Nov 2025
Form 2File: Form 2.pdf12 Nov 2025
Form 3File: Form 3.pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DEC 21.pdf12 Nov 2025
Form 1File: Form 1 (3).pdf12 Nov 2025
Form 2File: form 2.pdf12 Nov 2025
Form 3File: Form 3 (42).pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH 22.pdf12 Nov 2025
Form 1File: Form 1 (1).pdf12 Nov 2025
Form 2File: Form 2.pdf12 Nov 2025
Form 3File: Form 3 (2).pdf12 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 22.pdf12 Nov 2025

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 15 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARK59 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

2 kmPARK59Completed 107Lapsed / revoked 49Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 232 registered projects within 2 km.

Builder: SHIV DEVELOPERS

Shiv Developers has 14 registrations on MahaRERA, including SHREYASH SANKUL and SHIV SAMRUDHI - A WING. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PARK59 is delayed beyond 29 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARK59?

The registered promoter entity is SHIV DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABQFS2269A1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARK59?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARK59?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARK59?

The professionals named in the filing: Architect: Shankar Nimbalkar; Engineer: K P BADGUJAR CONSULTANT PVT LTD; Engineer: Rohinee Badgujar; Engineer: Ganesh Katke; Chartered Accountant: ANITA LAXMAN LIMAYE; Chartered Accountant: Rohit Jadhav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK59?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK59. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK59 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.