PARK TITAN PHASE V
By PRIDE PURPLE INFRASTRUCTURE
RG-MH-32932 · RERA P52100080502 · Last updated on MahaRERA portal: 29 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PARK TITAN PHASE V is a Residential / Group Housing project by PRIDE PURPLE INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100080502 on 11 Jun 2025. Possession is promised by 31 Aug 2029. 0 of the 9 units on this registration are recorded sold or booked, and 0 of 55 construction stages are filed complete.
At a glance
Project
- NamePARK TITAN PHASE V
- TypeResidential / Group Housing
- Location
- Marunji
- Mulshi
- Pune
- 411057
- Pincode411057
- RERA no.P52100080502
- ReraGenie IDRG-MH-32932
Builder
- NamePRIDE PURPLE INFRASTRUCTURE
- Entity typePartnership
- GSTIN27AAMFP1587H1ZT
- PartnerSHRAVAN DEVAKINANDAN AGARWAL
- Other registrations9 more →
- Completed3 of 10
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Jun 2025
- Promised completion31 Aug 2029
- Revised completionNone
- Buildings5 building records
- Documents filed65 files
Current status
Figures as on 29 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER 10 | NA | 25 | 23 | 0 | 0 | 0 |
| TOWER 15 | NA | 25 | 23 | 9 | 0 | 9 |
| TOWER 16 | NA | 25 | 23 | 0 | 0 | 0 |
| TOWER 17 | NA | 25 | 23 | 0 | 0 | 0 |
| TOWER 18 | NA | 25 | 23 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.
TOWER 100%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 150%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 160%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 170%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER 180%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed686
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| TOWER 10 | 138 | 138 |
| TOWER 15 | 137 | 137 |
| TOWER 16 | 137 | 137 |
| TOWER 17 | 137 | 137 |
| TOWER 18 | 137 | 137 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CRYSTAL ARCH |
| Architect | CRYSTAL ARCHITECT |
| Engineer | Bhalchandra Ajansondkar |
| Chartered Accountant | Parth v Jain & Associates |
| Chartered Accountant | SAC Co LLP |
| Chartered Accountant | SAC & CoLLP |
| Partner | Role in project |
|---|---|
| PRIDE PURPLE INFRASTRUCTURE | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 2187/2019 | CIVIL JUDGE SENIOR DIVISION PUNE | Argument Unready |
| 161/2024 | CIVIL JUDGE SENIOR DIVISION PUNE | Awaiting Summons |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Aug 2029
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: ARCH FORM_1_PARK TITAN PH V_Q4_compressed.pdf | 29 May 2026 |
| Form 2File: ENGG FORM 2_PARK TITAN PH V_Q4_compressed.pdf | 29 May 2026 |
| Form 3File: Form 3-Titan PH 5_compressed.pdf | 29 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold List_compressed.pdf | 29 May 2026 |
| Form 1File: Form 1 Phase V.pdf | 4 Sep 2025 |
| Form 2File: Form 2 Park Titan Phase V.pdf | 4 Sep 2025 |
| Form 3File: Form 3 Park Titan Ph V_.pdf | 4 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2025 PH V.pdf | 4 Sep 2025 |
| Declaration about Commencement CertificateFile: 2_Declartion For CC.pdf | 9 May 2025 |
| Other - TechnicalFile: 4_Declaration _50.pdf | 9 May 2025 |
| Other - TechnicalFile: Arch Declaration_Plot Area.pdf | 9 May 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 5_Disclourse_ Secured.pdf | 9 May 2025 |
| Proforma of Agreement for saleFile: ATS _RERA_5-2025.pdf | 5 May 2025 |
| Copy of the legal title reportFile: TSR _28-04-2025_compressed.pdf | 29 Apr 2025 |
| Proforma of Allotment letterFile: Allotment letter_ Phase V-28-04-2025.pdf | 29 Apr 2025 |
| Other - LegalFile: PPI Conveyance Deed 808-2015-1-75_compressed.pdf | 29 Apr 2025 |
| Other - LegalFile: PPI Conveyance Deed 808-2015-76-158_compressed.pdf | 29 Apr 2025 |
| Other - LegalFile: PPP Conveyance Deed 3816-2016-1-75_compressed.pdf | 29 Apr 2025 |
| Other - LegalFile: PPP Conveyance Deed 3816-2016-76-150_compressed.pdf | 29 Apr 2025 |
| Other - LegalFile: PPP Conveyance Deed 3816-2016-151-239_compressed.pdf | 29 Apr 2025 |
| Declaration in FORM BFile: Form B_Ph V.pdf | 18 Apr 2025 |
| Declaration about Commencement CertificateFile: Gmail-PMRDA.pdf | 18 Apr 2025 |
| Deviation Report with respect to Allotment letterFile: Dev Report _Allotment Letter.pdf | 18 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: Dev Report _ATS_.pdf | 18 Apr 2025 |
| Layout approvalFile: Layout highlighted with phase v.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 10 sections.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 10 elevations.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 10 floor plans.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 15 sections.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 15 elevations.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 15 floor plans.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 16 sections.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 16 elevations.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 16 floor plans.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 17 sections.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 17 floor plans.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 18 sections.pdf | 14 Apr 2025 |
| Building plan approvalFile: Tower 18 elevations.pdf | 14 Apr 2025 |
| Building plan approvalFile: Towe 18 floor plans.pdf | 14 Apr 2025 |
| PAN CardFile: Pride Purple Infrastructure - PAN CARD.pdf | 14 Apr 2025 |
| Details of encumbrances concerned to FinanceFile: Encum_Legal_Finance_merged.pdf | 14 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: Layout highlighted with phase v.pdf | 14 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert -Form 1_Ph V.pdf | 14 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Park Titan Ph 5.pdf | 14 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Cost_Eng_.pdf | 14 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Towe 18 floor plans.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 18 elevations.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 18 sections.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 17 floor plans.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 17 sections.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 16 floor plans.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 16 elevations.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 15 floor plans.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 15 elevations.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 15 sections.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 10 floor plans.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 10 elevations.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 10 sections.pdf | 14 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Tower 16 sections.pdf | 14 Apr 2025 |
| CERSAI detailsFile: Cersia _Ph V.pdf | 14 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - All RERA Designated Bank Accounts Titan PH-V.pdf | 14 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Encum_Legal_Finance_merged.pdf | 14 Apr 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Dis of int_Ph V.pdf | 14 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B -Declaration from the bank Titan PH-V.pdf | 14 Apr 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PARK TITAN PHASE V on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Marunji13,700+ in Pune
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: PRIDE PURPLE INFRASTRUCTURE
PRIDE PURPLE INFRASTRUCTURE has 10 registrations on MahaRERA, including PARK CONNECT and PARK ASTRA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PARK TITAN PHASE V is delayed beyond 31 Aug 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PARK TITAN PHASE V?
The registered promoter entity is PRIDE PURPLE INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27AAMFP1587H1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PARK TITAN PHASE V?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PARK TITAN PHASE V?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PARK TITAN PHASE V?
The professionals named in the filing: Architect: CRYSTAL ARCH; Architect: CRYSTAL ARCHITECT; Engineer: Bhalchandra Ajansondkar; Chartered Accountant: Parth v Jain & Associates; Chartered Accountant: SAC Co LLP; Chartered Accountant: SAC & CoLLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PARK TITAN PHASE V?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback