Registered Litigation declared Residential / Group Housing project

PARK TITAN PHASE IV

By PRIDE PURPLE INFRASTRUCTURE

RG-MH-43797 · RERA P52100055911 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 8%
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

PARK TITAN PHASE IV is a Residential / Group Housing project by PRIDE PURPLE INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100055911 on 29 Apr 2024. Possession is promised by 31 Mar 2028.

At a glance

Project

  • NamePARK TITAN PHASE IV
  • TypeResidential / Group Housing
  • Location
    • Marunji
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100055911
  • ReraGenie IDRG-MH-43797

Builder

  • NamePRIDE PURPLE INFRASTRUCTURE
  • Entity typePartnership
  • GSTIN27AAMFP1587H1ZT
  • PartnerSHRAVAN DEVAKINANDAN AGARWAL
  • Other registrations9 more →
  • Completed3 of 10
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2024PromisedMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2024
  • Promised completion31 Mar 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 8NA2523000
TOWER 9NA2523000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 8%.

TOWER 838%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 938%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure8%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks8%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed276

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots276
Closed/Covered276
BuildingClosed/CoveredTotal
TOWER 8138138
TOWER 9138138

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,609 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jul 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority (PMRDA)
Permissible FSI34995.39
Proposed, not sanctioned20,102 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFinal Plot No-226/3, Bakre Avenue, Bhandarkar road, Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCRYSTAL ARCHITECT
ArchitectCRYSTAL ARCH
Chartered AccountantSAC Co LLP
PartnerRole in project
PRIDE PURPLE INFRASTRUCTURE-

Litigation declared3

CaseCourtStatus
2187/2019Civil Court Senior Division PuneArgument Unready
161/2024Civil Court Senior Division PuneApperance
2187 /2019Civil Court Senior Division, PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2028

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Titan phase -4 Form 1.pdf28 Apr 2026
Form 2File: PARK TITAN PH IV__Form 2_compressed.pdf28 Apr 2026
Form 3File: Form 3-Titan IV_compressed.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold_Unsold _Titan IV.pdf28 Apr 2026
Form 1File: Form 1 Titan Ph IV _compressed.pdf10 Apr 2026
Form 2File: Form 2 _pHASE iV_compressed.pdf10 Apr 2026
Form 3File: Form 3-Titan Phase IV.pdf10 Apr 2026
Disclosure of Sold and Booked InventoryFile: Park Titan IV_sOLD uNSOLD.pdf10 Apr 2026
Form 1File: Form 1 Titan Ph IV _compressed.pdf15 Nov 2025
Form 2File: ENGG CERTIFICATE_pHASE iV_compressed (1).pdf15 Nov 2025
Form 3File: Form 3-Titan Phase IV.pdf15 Nov 2025
Disclosure of Sold and Booked InventoryFile: Park Titan IV_sOLD uNSOLD.pdf15 Nov 2025
Form 1File: Form 1 Phase IV.pdf19 Jul 2025
Form 2File: Form 2 Park Titan Phase IV.pdf19 Jul 2025
Form 3File: FORM 3 Phase IV.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2025 PH 4.pdf19 Jul 2025
Building plan approvalFile: Tower 9 floor plan.pdf24 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: CC-Revised_28-03-2025.pdf24 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Tower 9 floor plan.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Park Titan PH- 4.pdf16 Apr 2025
Building plan approvalFile: Tower 9 - Sec Elevation.pdf14 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Tower 9 floor plan.pdf14 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Tower 9 - Sec Elevation.pdf14 Apr 2025
Declaration about Commencement CertificateFile: Decl of CC_Ph IV.pdf14 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Titan Ph IV Arch certificate.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate _Titan Ph IV.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _Titan Ph IV.pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE_Titan Ph IV.pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -Titan Ph 4 Sign Copy_compressed.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Titan Ph 4 certificate_compressed.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park titan phase IV Sign Copy_compressed.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate Park Titan-8,9 phase-4.pdf16 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 titan IV_June 2024.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Titan phase 4.pdf18 Jul 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE_RERA 20-05-2024_Upload.PDF30 May 2024
Proforma of Agreement for saleFile: PArk Titan Ph IV RERA DRAFT_ May 2024.PDF20 May 2024
Proforma of Allotment letterFile: Allotment letter_Park Titan Phase IV_20-05-2024.PDF20 May 2024
Proforma of Allotment letterFile: AGREEMENT FOR SALE_RERA 20-05-2024_Upload.PDF20 May 2024
Deviation Report with respect to Allotment letterFile: Dev Report Allotment letter_20-05-2024.pdf20 May 2024
Deviation Report with respect to model copy of AgreementFile: Dev report Agreement 20-05-2024.pdf20 May 2024
Details of encumbrances concerned to FinanceFile: Encum Finance.pdf23 Apr 2024
Details of encumbrances concerned to LegalFile: Encum Finance.pdf23 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A-SDA.pdf20 Apr 2024
Proforma of Agreement for saleFile: AFS PDF.pdf17 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Gmail - PMRDA.pdf10 Apr 2024
Building plan approvalFile: T9 17th floor.pdf8 Apr 2024
Building plan approvalFile: T8 - top terrace , section ,elevation.pdf8 Apr 2024
Building plan approvalFile: T9 section elevations.pdf8 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: T9 17th floor.pdf8 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: T8 - top terrace , section ,elevation.pdf8 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: T9 section elevations.pdf8 Apr 2024
CERSAI detailsFile: UNDERTAKING CERSIA.pdf8 Apr 2024
Copy of the legal title reportFile: RERA TSR.pdf26 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Discl of int.pdf26 Mar 2024
Other - LegalFile: PPI Conveyance Deed 808-2015-1-75_compressed.pdf26 Mar 2024
Other - LegalFile: PPI Conveyance Deed 808-2015-76-158_compressed.pdf26 Mar 2024
Other - LegalFile: PPP Conveyance Deed 3816-2016-1-75_compressed.pdf26 Mar 2024
Other - LegalFile: PPP Conveyance Deed 3816-2016-76-150_compressed.pdf26 Mar 2024
Other - LegalFile: PPP Conveyance Deed 3816-2016-151-239_compressed.pdf26 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ 14-03-2024.pdf14 Mar 2024
Other - TechnicalFile: Dec Cum Understanding.pdf13 Mar 2024
Other - TechnicalFile: Dec for plot area.pdf13 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: T8,T9 area highlighted.pdf12 Mar 2024
Details of encumbrances concerned to FinanceFile: Encm- Legal_merged.pdf7 Mar 2024
Details of encumbrances concerned to LegalFile: Encm- Legal_merged.pdf7 Mar 2024
Declaration about Commencement CertificateFile: Dec For CC.pdf7 Mar 2024
Declaration in FORM BFile: FORM B.pdf7 Mar 2024
Proforma of Allotment letterFile: Allotment letter_Park Titan Phase IV.pdf7 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Decl- Sep Ac.pdf7 Mar 2024
Deviation Report with respect to Allotment letterFile: Devi Report Allotment.pdf7 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Devi of ATS.pdf7 Mar 2024
Layout approvalFile: PH IV marking on sanctioned layout_.pdf1 Mar 2024
Building plan approvalFile: T8 1st floor.pdf1 Mar 2024
Building plan approvalFile: T8 Typical Refuge floor.pdf1 Mar 2024
Building plan approvalFile: T9 1st floor.pdf1 Mar 2024
Building plan approvalFile: T9 Typical Refuge floor.pdf1 Mar 2024
PAN CardFile: Pride Purple Infrastructure - PAN CARD.pdf1 Mar 2024
Copy of Layout Approval (in case of layout)File: PH IV marking on sanctioned layout_.pdf1 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: T8 1st floor.pdf1 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: T8 Typical Refuge floor.pdf1 Mar 2024

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARK TITAN PHASE IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Marunji13,700+ in Pune

Builder: PRIDE PURPLE INFRASTRUCTURE

PRIDE PURPLE INFRASTRUCTURE has 10 registrations on MahaRERA, including PARK CONNECT and PARK ASTRA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PARK TITAN PHASE IV is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARK TITAN PHASE IV?

The registered promoter entity is PRIDE PURPLE INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27AAMFP1587H1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARK TITAN PHASE IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARK TITAN PHASE IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARK TITAN PHASE IV?

The professionals named in the filing: Architect: CRYSTAL ARCHITECT; Architect: CRYSTAL ARCH; Chartered Accountant: SAC Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK TITAN PHASE IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK TITAN PHASE IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK TITAN PHASE IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.