Home / Browse projects / Pune, Maharashtra / PARK TITAN PHASE III

Registered Litigation declared Residential / Group Housing project

PARK TITAN PHASE III

By PRIDE PURPLE INFRASTRUCTURE

RG-MH-41952 · RERA P52100049631 · Last updated on MahaRERA portal: 28 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 86%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

PARK TITAN PHASE III is a Residential / Group Housing project by PRIDE PURPLE INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100049631 on 22 Feb 2023. Possession is promised by 30 Jun 2027.

At a glance

Project

  • NamePARK TITAN PHASE III
  • TypeResidential / Group Housing
  • Location
    • MARUNJI
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100049631
  • ReraGenie IDRG-MH-41952

Builder

  • NamePRIDE PURPLE INFRASTRUCTURE
  • Entity typePartnership
  • GSTIN27AAMFP1587H1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerSHRAVAN DEVAKINANDAN AGARWAL
  • Other registrations9 more →
  • Completed3 of 10
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2023PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2023
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 6NA2523000
TOWER 1NA2523000
TOWER 7NA2523000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 86%.

TOWER 647%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure56%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks56%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TOWER 154%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure86%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks86%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%
TOWER 749%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure65%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed411

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots411
Closed/Covered411
BuildingClosed/CoveredTotal
TOWER 6137137
TOWER 1137137
TOWER 7137137

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,055 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority (PMRDA)
Permissible FSI55651.78
Proposed, not sanctioned44,521 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFINAL PLOT NO 226/3 BAKRE AVENUE BHANDARKAR ROAD PUNE411004

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCRYSTAL ARCH
ArchitectCRYSTAL ARCHITECT
Chartered AccountantSAC Co LLP
PartnerRole in project
PRIDE PURPLE INFRASTRUCTURE-

Litigation declared3

CaseCourtStatus
2187/2019SHIVAJAI NAGAR CIVIL JUDGE SENIOR DIVISIONPENDING FOR EXH FIVE ARGUMENT
187/2020SHIVAJAI NAGAR CIVIL JUDGE SENIOR DIVISIONPENDING FOR EXH FIVE ARGUMENT
2187/2019Civil Court Senior Division, PuneOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Titan phase 3 Form 1.pdf28 Apr 2026
Form 2File: PARK TITAN PH III_Form 2.pdf28 Apr 2026
Form 3File: Form 3-Titan PH III_compressed.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold_Unsold Titan PH III.pdf28 Apr 2026
Form 1File: Form 1 Titan Ph IV _compressed.pdf10 Apr 2026
Form 2File: Form 2 _pHASE iV_compressed.pdf10 Apr 2026
Form 3File: Form 3-Titan Phase IV.pdf10 Apr 2026
Disclosure of Sold and Booked InventoryFile: Park Titan IV_sOLD uNSOLD.pdf10 Apr 2026
Form 1File: FORM 1 Park Titan Ph III.pdf15 Nov 2025
Form 2File: ENGG CERTIFICATE_pHASE iii_compressed.pdf15 Nov 2025
Form 3File: Form 3 -Titan Phase III.pdf15 Nov 2025
Disclosure of Sold and Booked InventoryFile: Park Titan III_Sold Unsold.pdf15 Nov 2025
Form 1File: Form 1 Phase III.pdf19 Jul 2025
Form 2File: Form 2 Park Titan Phase III.pdf19 Jul 2025
Form 3File: FORM 3 Titan Phase III.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2025 PH 3.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3PARK TITAN PH- 3.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Titan Ph III Arch certificate.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Phase III.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase III.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE- Phase III.pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Titan PH-3 Sign Copy_compressed.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Titan phase-3 T-1,6,7 Rera Certificate_compressed.pdf14 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Park Titan Ph III.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park titan phase III Sign copy_compressed.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate Park Titan-1,6,7 phase-3_compressed.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Titan III - Engg- June 2024.pdf26 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Certificate -Park Titan III - June 2024.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PARK Titan III_June 2024.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TITAN PHASE-3.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Titan phase III - Engg March 24.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Titan Phase III-Form 3 Sign copy-compressed_compressed_compressed-1-7.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Titan Phase III-Form 3 Sign copy-compressed_compressed_compressed-8-14.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Titan Phase III-Form 3_C.pdf6 Feb 2024
Other - LegalFile: Final Order RCS- 187-2020.pdf14 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Titan Ph III_Form 5_FY 22-23_compressed.pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch_Titan III.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Titan phase III - Engg Sep 23.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality -Titan III -Sep 23.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pi7_Titan_Ph_III_Form_3_June_23_compressed_compressed.pdf31 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pi7_Titan_Ph_III_Form_3_June_23_compressed_compressed_Done.pdf31 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park Titan Ph III_Form 3_Q-4_compressed.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Titan TOWER 1,6,7 Phase III_ change_compressed.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Titan Phase III.pdf12 Apr 2023
Copy of the legal title reportFile: Supplementary Title S No 44 51.pdf1 Feb 2023
Copy of the legal title reportFile: Supplemtary title S No40 41.pdf1 Feb 2023
Details of encumbrances concerned to FinanceFile: DECLARATION LEGAL ENCUMBRANCES PARK TITAN 01022023.pdf1 Feb 2023
Details of encumbrances concerned to LegalFile: DECLARATION LEGAL ENCUMBRANCES PARK TITAN 01022023.pdf1 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT PARK TITAN PH III 23012023.pdf23 Jan 2023
Layout approvalFile: Titan layout with marking.pdf20 Jan 2023
Building plan approvalFile: T1 typical floor.pdf20 Jan 2023
Building plan approvalFile: T6 typical floor.pdf20 Jan 2023
Building plan approvalFile: T7 typical floor.pdf20 Jan 2023
PAN CardFile: PPI PAN.pdf20 Jan 2023
Copy of the legal title reportFile: TITAL REPORT PARK TITAN PH III 19012023.pdf20 Jan 2023
Details of encumbrances concerned to FinanceFile: SELF DECLARATION PARK TITAN PH III 01022023.pdf20 Jan 2023
Details of encumbrances concerned to FinanceFile: Morgtage deed.pdf20 Jan 2023
Details of encumbrances concerned to LegalFile: SELF DECLARATION PARK TITAN PH III 01022023.pdf20 Jan 2023
Details of encumbrances concerned to LegalFile: Morgtage deed.pdf20 Jan 2023
Copy of Layout Approval (in case of layout)File: Titan layout with marking.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: T1 typical floor.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: T6 typical floor.pdf20 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: T7 typical floor.pdf20 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERT MARUNJI 0612023.pdf20 Jan 2023
Declaration about Commencement CertificateFile: FORM D DECLARATION PARK TITAN PH III 20012023.pdf20 Jan 2023
Declaration in FORM BFile: FORM B DECLARATION PARK TITAN PH III 20012023.pdf20 Jan 2023
CERSAI detailsFile: CERSIA CERT PARK TITAN PH III 01022023.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A PARK TITAN PH III SDA 17012023.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A PARK TITAN PH III APJ 17012023.pdf20 Jan 2023
Proforma of Agreement for saleFile: PERFORMA OF AGREEMENT.pdf20 Jan 2023
Proforma of Allotment letterFile: PERFORMA OF ALLOTMENT LETTER.pdf20 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A DECLARATION PARK TITAN PH III 19012023.pdf20 Jan 2023
Deviation Report with respect to Allotment letterFile: ALLOTMENT DEVIATION PAR TITAN PH III 19012023.pdf20 Jan 2023
Deviation Report with respect to model copy of AgreementFile: AGREE DEVIATION REPORT PAR TITAN PH III 19012023.pdf20 Jan 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARK TITAN PHASE III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MARUNJI13,700+ in Pune

Builder: PRIDE PURPLE INFRASTRUCTURE

PRIDE PURPLE INFRASTRUCTURE has 10 registrations on MahaRERA, including PARK CONNECT and PARK ASTRA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PARK TITAN PHASE III is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARK TITAN PHASE III?

The registered promoter entity is PRIDE PURPLE INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27AAMFP1587H1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARK TITAN PHASE III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARK TITAN PHASE III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARK TITAN PHASE III?

The professionals named in the filing: Architect: CRYSTAL ARCH; Architect: CRYSTAL ARCHITECT; Chartered Accountant: SAC Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK TITAN PHASE III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK TITAN PHASE III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK TITAN PHASE III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.