Home / Browse projects / Pune, Maharashtra / PARK TITAN

Registration lapsed No litigation declared Residential / Group Housing project

PARK TITAN

By PRIDE PURPLE INFRASTRUCTURE

RG-MH-22650 · RERA P52100031768 · Last updated on MahaRERA portal: 19 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
14 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 70%
1Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

PARK TITAN is a Residential / Group Housing project by PRIDE PURPLE INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100031768 on 9 Nov 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePARK TITAN
  • TypeResidential / Group Housing
  • Location
    • MARUNJI ROAD
    • MARUNJI
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100031768
  • ReraGenie IDRG-MH-22650

Builder

  • NamePRIDE PURPLE INFRASTRUCTURE
  • Entity typePartnership
  • GSTIN27AAMFP1587H1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerSHRAVAN DEVAKINANDAN AGARWAL
  • Other registrations9 more →
  • Completed3 of 10
  • No longer live3 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredNov 2021PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Nov 2021
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PARK TITAN TOWER 3NA250000
PARK TITAN TOWER 4NA250000
PARK TITAN TOWER 5NA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 19 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 70%.

PARK TITAN TOWER 370%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
PARK TITAN TOWER 439%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PARK TITAN TOWER 539%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed414

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots414
Closed/Covered414
BuildingClosed/CoveredTotal
PARK TITAN TOWER 3138138
PARK TITAN TOWER 4138138
PARK TITAN TOWER 5138138

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,400 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPMRDA
Permissible FSI55715.39
Proposed, not sanctioned22,002 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMODEL COLONY, PRIME CENTER, NEAR OM SUPER MARKET PUNE 411016

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCRYSTAL ARCHITECT
EngineerBhalchandra Ajansondkar
Chartered AccountantSAC & Co LLP
PartnerRole in project
PRIDE PURPLE INFRASTRUCTURE-

Litigation declared1

CaseCourtStatus
2187/2019CIVIL JUDGE SENIOR DIVISION PUNEPENDING FOR ARGUMENT ON EXH

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600498SANDEEP KUMARPRIDE PURPLE INFRASTRUCTURE28/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Nov 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Phase I.pdf19 Jul 2025
Form 2File: Form 2 Park Titan Phase I.pdf19 Jul 2025
Form 3File: FORM 3 Titan Phase I.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD JUNE 2025 PH 1.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 park Titan 31-03-2025_compressed.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Titan Ph I Arch certificate.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Titan 1-Form 3 _compressed.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Titan phase -1 T-3,4,5 Rera Certificate_compressed.pdf14 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Park Titan.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Park Titan Sign Copy_compressed.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate Park Titan-3,4,5 phase-1.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Park Titan I - Engg - June 2024.pdf26 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Certificate - Park Titan June 2024.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Titan I _June 2024.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TITAN PHASE-1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Titan phase - Engg March 24.pdf24 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Rera_Quality _Titan I March 24.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pride Titan-Form 3_C.pdf6 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Titan Ph I_Form 5_FY 22-23_compressed.pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch_Titan I.pdf7 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Titan phase I - Engg Sep 23.pdf7 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality -Titan I -Sep 23.pdf7 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Titan Ph I_Form 3_ March 23_compressed.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Titan TOWER 3,4,5 Phase I Uploaded.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT PARK TITAN 19012023.pdf24 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT PARK TITAN 31122022.pdf10 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QTY ASSURANCE CERT 5 PARK TITAN 31122022.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 PARK TITAN 21112022.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA PARK TITAN QUALITY SEPT22.pdf14 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Titan I June 22.pdf22 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Park Titan.pdf15 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Park Titan.pdf25 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Certificate Park titan Dec 21.pdf6 Jan 2022
CERSAI detailsFile: UNDERTAKING PARK CONNECT PH II.pdf6 Jan 2022
Disclosure of sold/ booked inventoryFile: Sold unsold unit details compressed.pdf15 Dec 2021
Layout approvalFile: Layout.pdf1 Nov 2021
Building plan approvalFile: Tower 3 floor plan.pdf1 Nov 2021
Building plan approvalFile: Tower 4 floor plan.pdf1 Nov 2021
Building plan approvalFile: Tower 5 floor plan.pdf1 Nov 2021
PAN CardFile: PPI PAN.pdf1 Nov 2021
Copy of the legal title reportFile: TITLE REPORT FORM 28.pdf1 Nov 2021
Copy of the legal title reportFile: SUPPL TITLE S NO 44 51 20012021.pdf1 Nov 2021
Copy of the legal title reportFile: SUPPL TITLE SNO 40 41 DT 17012021.pdf1 Nov 2021
Details of encumbrancesFile: PARK TITAN SELF DECLARATION 01112021.pdf1 Nov 2021
Copy of Layout Approval (in case of layout)File: Layout.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Tower 3 floor plan.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Tower 4 floor plan.pdf1 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: Tower 5 floor plan.pdf1 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: commencement cert.pdf1 Nov 2021
Declaration about Commencement CertificateFile: PARK TITAN DECLARATION CC FORM D 01112021.pdf1 Nov 2021
Declaration in FORM BFile: PARK TITAN AFF CUM DECLARATION 01112021.pdf1 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate PPI Park Titan.pdf1 Nov 2021
Proforma of Allotment letterFile: LOI Park Titan.pdf1 Nov 2021
Proforma of Allotment letterFile: Park Titan Sample Agreement.pdf1 Nov 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARK TITAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MARUNJI13,700+ in Pune

Builder: PRIDE PURPLE INFRASTRUCTURE

PRIDE PURPLE INFRASTRUCTURE has 10 registrations on MahaRERA, including PARK CONNECT and PARK ASTRA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that PARK TITAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PARK TITAN is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARK TITAN?

The registered promoter entity is PRIDE PURPLE INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27AAMFP1587H1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARK TITAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PARK TITAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PARK TITAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARK TITAN?

The professionals named in the filing: Architect: CRYSTAL ARCHITECT; Engineer: Bhalchandra Ajansondkar; Chartered Accountant: SAC & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK TITAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK TITAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK TITAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.