Home / Browse projects / Pune, Maharashtra / PARK LIFE WING D

Registered No litigation declared Residential / Group Housing project

PARK LIFE WING D

By AKRUR BABANRAO KUDALE

RG-MH-87190 · RERA P52100056077 · Last updated on MahaRERA portal: 20 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 50%
39 of 94Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

PARK LIFE WING D is a Residential / Group Housing project by AKRUR BABANRAO KUDALE in Pune, Maharashtra, registered with MahaRERA as P52100056077 on 10 May 2024. Possession is promised by 30 Mar 2030. 55 of the 94 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NamePARK LIFE WING D
  • TypeResidential / Group Housing
  • Location
    • BENKARWASTI ROAD
    • DHAYARI
    • Dhayari (Part)
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • RERA no.P52100056077
  • ReraGenie IDRG-MH-87190

Builder

  • NameAKRUR BABANRAO KUDALE
  • Entity typeIndividual

Key dates

this monthRegisteredMay 2024PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2024
  • Promised completion30 Mar 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Current status

59%55 of 94 units booked

Figures as on 20 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING DNA131294094

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 50%.

WING D: 18% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed57

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots57
Closed/Covered57

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,564 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
Dattatray Tulshiram BenkarPune (CB)Pune
Kundan Dattatray BenkarPune (CB)Pune
Kirshor Dattatray BenkarPune (CB)Pune
Raghu Krushnaji BenkarDhayari (Part)Pune
Muktabai Krushnaji BenkarDhayari (Part)Pune
Shankar Mahadu BenkarDhayari (Part)Pune
Arjun Mahadu BenkarDhayari (Part)Pune
Bhimrao Mahadu BenkarDhayari (Part)Pune
Rama Yesu BenkarDhayari (Part)Pune
Chintan Builders Prop. Mr. Akrur Babanrao KudaleDhayari (Part)Pune
Mr. Krushna yesu BenkarDhayari (Part)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI10898.43
Proposed, not sanctioned6,898 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHAYARI PUNE

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShankar D. Gejage
ArchitectPARAG POKALE
EngineerVaishav Ashok Shinde
EngineerROHIT NARUTE
Chartered AccountantVINIT D ACHHA AND ASSOCIATES
Chartered AccountantSHUBHAM BORA
Chartered AccountantMohmedyasir A Bagwan

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Sep 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Mar 2030

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form-5 FY 25-26 Q4 D wing.pdf20 May 2026
Form 1File: form 1 D wing Q4.pdf20 Apr 2026
Form 2File: FORM 2 D wing.pdf20 Apr 2026
Form 3File: FORM-3 D WING Q4.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold- D wing.pdf20 Apr 2026
Form 1File: Form 1 with sign.pdf19 Jan 2026
Form 2File: Form 2 - Q3 D wing .pdf19 Jan 2026
Form 3File: FORM-3 D wing.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sold Unsold- D wing.pdf19 Jan 2026
Form 1File: form-1 D wing.pdf17 Oct 2025
Form 2File: form2 ABK Sign.pdf17 Oct 2025
Form 3File: form 3 ABK_compressed.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: FORM-5 D wing ABK FY-24-25.pdf29 Sep 2025
Form 1File: FORM-1 Q1 D WING.pdf20 Jul 2025
Form 2File: FORM 2 D WING ABK_Q1 FY 2025-26.pdf20 Jul 2025
Form 3File: FORM-3_Q1_FY-2025-26.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 D BUILDING.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1- D building.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 D BUILDING PARK LIFE_compressed.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 D BUILDING_compressed.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 D BUILDING.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 KBP Q2.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - FORM 2 .pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT FORM - 1 D WING.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE FORM - 2 D WING.pdf30 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 Park Life D 1.pdf30 Jul 2024
Copy of the legal title reportFile: Final 06-05-2024.pdf6 May 2024
Other - LegalFile: Final 06-05-2024.pdf6 May 2024
Copy of the legal title reportFile: organized_compressed.pdf29 Apr 2024
Copy of the legal title reportFile: flow of title.pdf29 Apr 2024
Other - LegalFile: Plot Area Declaration.pdf29 Apr 2024
Other - FinanceFile: Declaration.pdf6 Apr 2024
Other - LegalFile: Order 50.pdf3 Apr 2024
Other - TechnicalFile: Order 50.pdf3 Apr 2024
Layout approvalFile: scan sheet 7-10_11zon.pdf6 Mar 2024
Copy of Layout Approval (in case of layout)File: scan sheet 7-10_11zon.pdf6 Mar 2024
Other - LegalFile: DECLARATION LETTER-1.pdf30 Jan 2024
Other - TechnicalFile: DECLARATION LETTER-2.pdf30 Jan 2024
Other - TechnicalFile: DECLARATION LETTER-1.pdf30 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Wing A Layout With Marking Old.pdf8 Jan 2024
Other - TechnicalFile: FSI AREA CERTIFICATE OF PARK LIFE C and D BUILDING.pdf8 Jan 2024
Other - LegalFile: Sale Deed 8078 1-31.pdf16 Nov 2023
Other - LegalFile: Sale Deed 8078 22-45.pdf16 Nov 2023
Other - LegalFile: Sale Deed 8078 46-66.pdf16 Nov 2023
Proforma of Agreement for saleFile: Agreement For Sale - (Revised) (Wing No D 09-10-2023).pdf31 Oct 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Certificate ton Park Life D Scan 22 -10-2023_page-0001.pdf31 Oct 2023
Other - LegalFile: 24R_8077 Kashinath Benkar and Other To ABKudale.pdf31 Oct 2023
Other - LegalFile: Kharedikhat-1106 (खरेदीखत (कुदळे अँड चाकणकर).pdf31 Oct 2023
Other - LegalFile: KHAREDIKHAT-6075-DATTRATRAY BENKAR AND OTHERS TO A-B-KUDALE.pdf31 Oct 2023
Other - LegalFile: KHAREDIKHAT-6076-DATTRATRAY BENKAR AND OTHERS TO A-B-KUDALE.pdf31 Oct 2023
Other - LegalFile: Kulmukhtyar Patra-3319-Omkar Benkar and Other To ABKudale.pdf31 Oct 2023
Other - LegalFile: Sale Deed-Omkar 3318-Benkar and other to ABKudalepdf.pdf31 Oct 2023
Layout approvalFile: Wing A Layout With Marking Old.pdf10 Oct 2023
Layout approvalFile: Wing A Layout With Marking.pdf10 Oct 2023
Layout approvalFile: Land Area Declarartion.pdf10 Oct 2023
Copy of Layout Approval (in case of layout)File: Wing A Layout With Marking Old.pdf10 Oct 2023
Copy of Layout Approval (in case of layout)File: Wing A Layout With Marking.pdf10 Oct 2023
Copy of Layout Approval (in case of layout)File: Land Area Declarartion.pdf10 Oct 2023
Details of encumbrances concerned to FinanceFile: No Encu Finance.pdf26 Sep 2023
Details of encumbrances concerned to FinanceFile: No Encu Legal.pdf26 Sep 2023
Details of encumbrances concerned to LegalFile: No Encu Finance.pdf26 Sep 2023
Details of encumbrances concerned to LegalFile: No Encu Legal.pdf26 Sep 2023
CERSAI detailsFile: CRESAI REPORT.pdf26 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Park Life Wing D.pdf23 Sep 2023
Building plan approvalFile: Wing C And D (1)_11zon.pdf18 Sep 2023
Building plan approvalFile: Wing C And D Floor Plan_11zon.pdf18 Sep 2023
Building plan approvalFile: Wing C And D Parking_11zon.pdf18 Sep 2023
Building plan approvalFile: Wing C And Parking Basement_11zon.pdf18 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Wing C And D (1)_11zon.pdf18 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Wing C And D Floor Plan_11zon.pdf18 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Wing C And D Parking_11zon.pdf18 Sep 2023
Building Plan Approval / NA Order for plotted developmentFile: Wing C And Parking Basement_11zon.pdf18 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMECEMENT CERTIFICATE NEW.pdf18 Sep 2023
Declaration about Commencement CertificateFile: DECLARATION CONMMENCEMENT CERTIFICATE.pdf18 Sep 2023
Declaration in FORM BFile: AFFIDIVATE - FORM B.pdf18 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - WITH A B KUDALE SIGNATURE.pdf18 Sep 2023

How this compares with Pune

59%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARK LIFE WING D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHAYARI13,700+ in Pune

Builder: AKRUR BABANRAO KUDALE

AKRUR BABANRAO KUDALE has 1 registration on MahaRERA, including PARK LIFE WING D. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PARK LIFE WING D is delayed beyond 30 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARK LIFE WING D?

The registered promoter entity is AKRUR BABANRAO KUDALE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARK LIFE WING D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARK LIFE WING D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARK LIFE WING D?

The professionals named in the filing: Architect: Shankar D. Gejage; Architect: PARAG POKALE; Engineer: Vaishav Ashok Shinde; Engineer: ROHIT NARUTE; Chartered Accountant: VINIT D ACHHA AND ASSOCIATES; Chartered Accountant: SHUBHAM BORA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK LIFE WING D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK LIFE WING D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK LIFE WING D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.