ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / PARK CONNECT PHASE II

Completed Litigation declared Residential / Group Housing project

PARK CONNECT PHASE II

By PRIDE PURPLE INFRASTRUCTURE

RG-MH-22484 · RERA P52100031776 · Last updated on MahaRERA portal: 30 Nov 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
23 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 90%
0Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

PARK CONNECT PHASE II is a Residential / Group Housing project by PRIDE PURPLE INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100031776 on 9 Nov 2021. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NamePARK CONNECT PHASE II
  • TypeResidential / Group Housing
  • Location
    • MARUNJI
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100031776
  • ReraGenie IDRG-MH-22484

Builder

  • NamePRIDE PURPLE INFRASTRUCTURE
  • Entity typePartnership
  • GSTIN27AAMFP1587H1ZT
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerSHRAVAN DEVAKINANDAN AGARWAL
  • Other registrations9 more →
  • Completed3 of 10
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2021PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Nov 2021
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings4 building records
  • Documents filed38 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA190000
BUILDING BNA190000
BUILDING CNA190000
BUILDING DNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 30 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 90%.

BUILDING A83%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.64%
BUILDING B71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
BUILDING C51%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
BUILDING D84%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.64%

Progress on shared amenities15

As on 30 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes60%
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed272

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots272
Closed/Covered272
BuildingClosed/CoveredTotal
BUILDING A6868
BUILDING B6868
BUILDING C6868
BUILDING D6868

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,269 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI28619.98
Proposed, not sanctioned22,413 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPRIME CENTER MODEL COLONY NEAR OM SUPER MARKET SHIVAJI NAGAR PUNE 411016

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCRYSTAL ARCH
EngineerNITIN PATIL
Chartered AccountantANITA MANTRI
PartnerRole in project
PRIDE PURPLE INFRASTRUCTURE-

Litigation declared2

CaseCourtStatus
2187/2019CIVIL JUDGE SENIOR DIVISION PUNEPENDING FOR ARGUMENT ON APPLICATION
2187/2019CIVIL JUDGE SENIOR DIVISION PUNEArgument Unready

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Aug 2023

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrances concerned to FinanceFile: Release Deed _ Kotak_19187-2024- Index.pdf30 Nov 2024
Details of encumbrances concerned to LegalFile: Release Deed _ Kotak_19187-2024- Index.pdf30 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Connect Ph II_Form 5_FY 22-23_compressed.pdf5 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate _Connect II_compressed.pdf4 Aug 2023
Architect’s Certificate on Completion of Project (Form 4)File: RERA Form 4 AND completion.pdf4 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Connect Ph II_Form 3_Q-4_compressed.pdf6 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Park Connect-Phase II.pdf12 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT PARK CONNECT PH II 20012023.pdf24 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT PARK CONNECT PH II 31122022.pdf10 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QTY ASSURANCE CERT PARK CONNECT PH II 31122022.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 PARK CONNECT PH II 21112022.pdf24 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA PARK CONNECT II QUALITY SEPT22.pdf14 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Connect II June 2022.pdf22 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality park connect II.pdf12 Apr 2022
Details of encumbrancesFile: MORTGAGE DEED PARK ASTRA MARUNJI 31122021.pdf28 Feb 2022
CERSAI detailsFile: CERSAI Park Connect.pdf25 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Certificate Park Connect II Dec 21.pdf6 Jan 2022
Disclosure of sold/ booked inventoryFile: INFORMATION SOLD BOOKED FLATS compressed.pdf14 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PARK CONNECT PHASE II Signed Form 3.pdf14 Dec 2021
CERSAI detailsFile: UNDERTAKING PARK CONNECT PH II.pdf13 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Revised land cost PARK CONNECT.PDF13 Dec 2021
Layout approvalFile: park connect sanctioned layout.pdf3 Nov 2021
Copy of Layout Approval (in case of layout)File: park connect sanctioned layout.pdf3 Nov 2021
Copy of the legal title reportFile: LEGAL TITLE REPORT PARK CONNECT 06102021.pdf25 Oct 2021
Copy of the legal title reportFile: SUPPL TITLE S NO 44 51 20012021.pdf25 Oct 2021
Copy of the legal title reportFile: SUPPL TITLE SNO 40 41 DT 17012021.pdf25 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf12 Oct 2021
Building plan approvalFile: AB building sanctioned plan.pdf8 Oct 2021
Building plan approvalFile: CD building sanctioned plan.pdf8 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: AB building sanctioned plan.pdf8 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: CD building sanctioned plan.pdf8 Oct 2021
Proforma of Allotment letterFile: Park Connect Sample Agreement.pdf8 Oct 2021
Proforma of Allotment letterFile: LOI Park Connect.pdf8 Oct 2021
PAN CardFile: PPI PAN.pdf6 Oct 2021
Details of encumbrancesFile: SELF DECLARATION PARK CONNECT 06102021.pdf6 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: C C PARK CONNECT 01102021.pdf6 Oct 2021
Declaration about Commencement CertificateFile: FORM D CC DECLARATION PARK CONNECT 06102021.pdf6 Oct 2021
Declaration in FORM BFile: FORM B DECLARATION PARK CONNECT 06102021.pdf6 Oct 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARK CONNECT PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MARUNJI13,700+ in Pune

Builder: PRIDE PURPLE INFRASTRUCTURE

PRIDE PURPLE INFRASTRUCTURE has 10 registrations on MahaRERA, including PARK CONNECT and PARK ASTRA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PARK CONNECT PHASE II is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARK CONNECT PHASE II?

The registered promoter entity is PRIDE PURPLE INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27AAMFP1587H1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARK CONNECT PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARK CONNECT PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARK CONNECT PHASE II?

The professionals named in the filing: Architect: CRYSTAL ARCH; Engineer: NITIN PATIL; Chartered Accountant: ANITA MANTRI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK CONNECT PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK CONNECT PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK CONNECT PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.