Home / Browse projects / Pune, Maharashtra / PARK CONNECT
PARK CONNECT
By PRIDE PURPLE INFRASTRUCTURE
RG-MH-04880 · RERA P52100020766 · Last updated on MahaRERA portal: 30 Nov 2024
Source: official MahaRERA filing
Red flags
- Litigation declared, 2 cases
- 1 complaint at MahaRERA
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PARK CONNECT is a Residential / Group Housing project by PRIDE PURPLE INFRASTRUCTURE in Pune, Maharashtra, registered with MahaRERA as P52100020766 on 8 May 2019. The registration is recorded completed; possession was promised by 30 Dec 2023. 1 complaint is on record with the regulator.
At a glance
Project
- NamePARK CONNECT
- TypeResidential / Group Housing
- Location
- MARUNJI GAON
- MARUNJI
- Mulshi
- Pune
- 411057
- Pincode411057
- RERA no.P52100020766
- ReraGenie IDRG-MH-04880
Builder
- NamePRIDE PURPLE INFRASTRUCTURE
- Entity typePartnership
- GSTIN27AAMFP1587H1ZT
- PartnerSHRAVAN DEVAKINANDAN AGARWAL
- Other registrations9 more →
- Completed3 of 10
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 May 2019
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings4 building records
- Documents filed56 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| E - F | NA | 21 | 0 | 0 | 0 | 0 |
| G - H | NA | 21 | 0 | 0 | 0 | 0 |
| I - J | NA | 20 | 0 | 0 | 0 | 0 |
| K - L | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 30 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
29 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 95%.
E - F75%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70% |
G - H86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
I - J81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
K - L81%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 30 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 20% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 70% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 90% |
| Solid Waste Management And Disposal | Yes | 80% |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed560
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| E - F | 144 | 144 |
| G - H | 144 | 144 |
| I - J | 136 | 136 |
| K - L | 136 | 136 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CRYSTAL ARCHITECT |
| Partner | Role in project |
|---|---|
| PRIDE PURPLE INFRASTRUCTURE | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 2187 /2019 | Civil Court Senior Division | Ongoing |
| 161/2024 | Civil Court Senior Division, Pune | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000258896 | Radhika Hasmukh Patel | PRIDE PURPLE INFRASTRUCTURE | 24/05/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Aug 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Aug 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Feb 2023
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: Release Deed _ Kotak_19187-2024- Index.pdf | 30 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Release Deed _ Kotak_19187-2024- Index.pdf | 30 Nov 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Park Connect Coop Hsg Society-certificate.pdf | 17 Jun 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Connect Ph I form 4 completion.pdf | 27 Feb 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Park Connect Phase I.pdf | 25 Feb 2023 |
| Other - FinanceFile: Completion Park Connect Phase I.pdf | 25 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: PARK CONNECT Rera Audit Report.pdf | 20 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT PARK CONNECT 31122022.pdf | 10 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QTY ASSURANCE CERT PARK CONNECT PLOT 5 31122022.pdf | 10 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 PARK CONNECT PH 1 21112022.pdf | 24 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: RERA PARK CONNECT QUALITY SEPT22.pdf | 14 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Connect I June 2022.pdf | 22 Jul 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality park Connect.pdf | 12 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 ALONGWITH ANNEXTURE PARK CONNECT.pdf | 6 Apr 2022 |
| Certificates of CA (Form 3)File: Titanium Form 3.pdf | 2 Mar 2022 |
| Certificates of CA (Form 3)File: Signed Form 3 Connect Phase I.pdf | 2 Mar 2022 |
| Details of encumbrancesFile: MORTGAGE DEED PARK ASTRA MARUNJI 31122021.pdf | 28 Feb 2022 |
| CERSAI detailsFile: CERSAI Park Connect.pdf | 25 Feb 2022 |
| Certificates of CA (Form 3)File: Connect Phase I Form 3.pdf | 12 Feb 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Rera Quality Certificate Park Connect Dec 21.pdf | 6 Jan 2022 |
| CERSAI detailsFile: UNDERTAKING PARK CONNECT PH II.pdf | 6 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD UNIT DETAILS PARK CONNECT PH I compressed.pdf | 16 Dec 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Rera Quality Park Connect A Sept 21.pdf | 9 Oct 2021 |
| Certificates of CA (Form 3)File: PARK CONNECT SIGNED FORM 3.pdf | 6 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Rera Quality Park Connect June 21.pdf | 17 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Rera Quality Park Astra March 21.pdf | 8 May 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Rera Quality Park Connect Dec 20.pdf | 14 Jan 2021 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Quality Certificate Park Connect Sept 20.pdf | 10 Oct 2020 |
| Layout approvalFile: LAYOUT.pdf | 7 Aug 2020 |
| Building plan approvalFile: GH BUILDING 3,4,5,6,8,9,10,11,13,14,15,16,18 TH FLOOR.pdf | 7 Aug 2020 |
| Building plan approvalFile: IJ BUILDING - 7,12,17 TH FLOOR.pdf | 7 Aug 2020 |
| Building plan approvalFile: KL BUILDING - 1ST, 2ND FLOOR.pdf | 7 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 7 Aug 2020 |
| Building Plan Approval (IOD)File: GH BUILDING 3,4,5,6,8,9,10,11,13,14,15,16,18 TH FLOOR.pdf | 7 Aug 2020 |
| Building Plan Approval (IOD)File: IJ BUILDING - 7,12,17 TH FLOOR.pdf | 7 Aug 2020 |
| Building Plan Approval (IOD)File: KL BUILDING - 1ST, 2ND FLOOR.pdf | 7 Aug 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: Quality Certificate Park Connect June 20.pdf | 13 Jul 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: QUALITY ASSURANCE CERT PARK CONNECT.pdf | 15 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A)File: QTY ASSURANC CERT PARK CONNECT 30092019.pdf | 17 Oct 2019 |
| Certificates of CA (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 30 Apr 2019 |
| Layout approvalFile: LAYOUT.pdf | 26 Apr 2019 |
| Building plan approvalFile: E F BUILDING.pdf | 26 Apr 2019 |
| Building plan approvalFile: G H BUILDING.pdf | 26 Apr 2019 |
| Building plan approvalFile: I J BUILDING.pdf | 26 Apr 2019 |
| Building plan approvalFile: K L BUILDING.pdf | 26 Apr 2019 |
| Copy of the legal title reportFile: TITLE REPORT S NO 40.pdf | 26 Apr 2019 |
| Copy of the legal title reportFile: TITLE REPORT S NO 41.pdf | 26 Apr 2019 |
| Details of encumbrancesFile: SELF DECLARATION NAVIN AGARWAL .pdf | 26 Apr 2019 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 26 Apr 2019 |
| Building Plan Approval (IOD)File: E F BUILDING.pdf | 26 Apr 2019 |
| Building Plan Approval (IOD)File: G H BUILDING.pdf | 26 Apr 2019 |
| Building Plan Approval (IOD)File: I J BUILDING.pdf | 26 Apr 2019 |
| Building Plan Approval (IOD)File: K L BUILDING.pdf | 26 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: NA ORDER.pdf | 26 Apr 2019 |
| Declaration in FORM BFile: AFFIDAVIT CUM DECLARATION NAVIN AGARWAL .pdf | 26 Apr 2019 |
| Proforma of Allotment letterFile: AGREEMENT DRAFT.pdf | 26 Apr 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
Keep PARK CONNECT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MARUNJI13,700+ in Pune
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: PRIDE PURPLE INFRASTRUCTURE
PRIDE PURPLE INFRASTRUCTURE has 10 registrations on MahaRERA, including PARK CONNECT and PARK ASTRA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 5 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PARK CONNECT is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PARK CONNECT?
The registered promoter entity is PRIDE PURPLE INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27AAMFP1587H1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PARK CONNECT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PARK CONNECT?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PARK CONNECT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PARK CONNECT?
The professionals named in the filing: Architect: CRYSTAL ARCHITECT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PARK CONNECT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback