Home / Browse projects / Mumbai City, Maharashtra / PARINEE EMINENCE PHASE 1
PARINEE EMINENCE PHASE 1
By Om Omega Shelters Private Limited
RG-MH-40384 · RERA P51900015555 · Last updated on MahaRERA portal: 25 Mar 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- 29 complaints at MahaRERA
- Completion date moved by 30 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PARINEE EMINENCE PHASE 1 is a Commercial project by Om Omega Shelters Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900015555 on 8 Mar 2018. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 30 months from the original filing. 29 complaints are on record with the regulator.
At a glance
Project
- NamePARINEE EMINENCE PHASE 1
- TypeCommercial
- Location
- DAINIK SHIVNER MARG
- WORLI
- Ward GSouth
- Mumbai City
- 400018
- Pincode400018
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900015555
- ReraGenie IDRG-MH-40384
Builder
- NameOm Omega Shelters Private Limited
- Entity typeCompany
- DirectorsVipul Dilip Shah, Dhaval Dilip Shah
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 Mar 2018
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Sep 2023)
- Buildings1 building record
- Documents filed112 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PARINEE EMINENCE PHASE 1 | NA | 40 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.
PARINEE EMINENCE PHASE 1: 25% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 90% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 25 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed901
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Consultant Combined |
| Engineer | JW CONSULTANTS LLP |
| Partner | Role in project |
|---|---|
| Om Omega Shelters Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project has undergone changes due to revision in plans and increase in FSI as per New DCPR 2034. Necessary consents for the revision of plans and extension of Project Completion as per Format B (Circular No. 28 dated 8th March 2021) is obtained and attached herewith. Due to the time elapsed in getting revised approvals and time required to construct the building, we are seeking extended date of 31st March 2026.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 1108/2011 | Bombay High Court | Pending |
| 1163/2011 | Bombay High Court | Pending |
Complaints filed with MahaRERA29
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400606 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 28/10/2024 |
| CC12400608 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 29/10/2024 |
| CC12400610 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 29/10/2024 |
| CC12400653 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 05/11/2024 |
| CC12400654 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 05/11/2024 |
| CC12400655 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 05/11/2024 |
| CC12400657 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 05/11/2024 |
| CC12400658 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 05/11/2024 |
| CC12400659 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 05/11/2024 |
| CC12400660 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 05/11/2024 |
| CC12400678 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 06/11/2024 |
| CC12400679 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 06/11/2024 |
| CC12400680 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 06/11/2024 |
| CC12400686 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 06/11/2024 |
| CC12400687 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 06/11/2024 |
| CC12400690 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 07/11/2024 |
| CC12400691 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 07/11/2024 |
| CC12400699 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 07/11/2024 |
| CC12400700 | Sammaan Capital Limited | Om Omega Shelters Private Limited | 07/11/2024 |
| CC12500068 | Behrulal Jain | Om Omega Shelters Private Limited | 08/01/2025 |
| CC12500076 | Ms Geeta Behrulal Jain | Om Omega Shelters Private Limited | 08/01/2025 |
| CC12500125 | B One Business House Private Limited | Om Omega Shelters Private Limited | 13/01/2025 |
| CC12500296 | Ravindra Kumar Verma | Om Omega Shelters Private Limited | 27/01/2025 |
| CC12500873 | Roadwings Western Pvt Ltd | Om Omega Shelters Private Limited | 13/03/2025 |
| CC12600855 | PRATHMESH UDAY KHHARE | Mahadev Realtors Worli LLp | 16/02/2026 |
| CC12600857 | Tarunkumar Panday Panday | Om Omega Shelters Private Limited | 16/02/2026 |
| CC12600861 | Adv. Sagar Ramesh Naik | Om Omega Shelters Private Limited | 16/02/2026 |
| CC12600862 | Yogesh Rasiklal Shah | Om Omega Shelters Private Limited | 16/02/2026 |
| CC12604295 | RAMESHKUMAR BHATT | Om Omega Shelters Private Limited | 09/07/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jun 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed112
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence June 2024.pdf | 25 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence Sept 2024.pdf | 25 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence Dec 2024.pdf | 25 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence March 2024.pdf | 25 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence December 2024.pdf | 25 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence September 2024.pdf | 25 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence June 2024_2.pdf | 25 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence June 2024_1.pdf | 25 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence March 2024_2.pdf | 25 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Eminence March 2024_1.pdf | 25 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 Worli Mar 2023_1.pdf | 25 Mar 2025 |
| Certificates of CA (Form 5)File: Form 5- Parinee Eminence Phase 1 - FY 2023-24.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eminence March 2024.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 1 Eminence June 2024.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 1 Eminence Sept 2024.pdf | 25 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eminence_Form 2_Dec 2024.pdf | 25 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Parinee Eminence _Sold, Unsold and booked Dec 2024.pdf | 25 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Eminence March 2024.pdf | 25 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Eminence March 2024.pdf | 25 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5- Parinee Eminence Phase 1 - FY 2023-24.pdf | 25 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Worli June 2023.pdf | 4 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Worli Sep 2023.pdf | 4 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Worli Dec 2023.pdf | 4 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli June 2023.pdf | 4 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Sep 2023.pdf | 4 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Dec 2023.pdf | 4 Jul 2024 |
| OtherFile: SRA Order_OOSPL.pdf | 1 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eminence June 2023.pdf | 13 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eminence Sep 2023.pdf | 13 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eminence Dec 2023.pdf | 13 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Booked Inventory March 2024_1.pdf | 13 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Booked Inventory March 2024_2.pdf | 13 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence MARCH 2018.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence MARCH 2019.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence MARCH 2020.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence MARCH 2021.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence MARCH 2021.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence MARCH 2022.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence JUNE 2022.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence SEPT 2022.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence DEC 2022.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Eminence MARCH 2023.pdf | 5 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee Eminence March 2019.pdf | 5 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee Eminence March 2020.pdf | 5 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Parinee Eminence March 2021.pdf | 5 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eminence Mar 2022.pdf | 5 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eminence June 2022.pdf | 5 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eminence 30 September 2022.pdf | 5 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 1 Eminence DEC 2022.pdf | 5 Mar 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Eminece 31st March 2023.pdf | 5 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Eminence March 2020.pdf | 5 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Eminence March 2021.pdf | 5 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurnace_Eminence.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli June 2023.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Sep 2023.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Dec 2023.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli June 2022_1.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli June 2022_2.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli June 2022_3.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli September 2022_1.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli September 2022_2.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli September 2022_3.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Dec 2022_1.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Dec 2022_2.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Dec 2022_3.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Mar 2023_1.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Mar 2023_2.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli Mar 2023_3.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli March 2020.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli March 2018_1.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli March 2018_2.pdf | 5 Mar 2024 |
| Certificates of CA (Form 3)File: Form 3 Worli March 2018_3.pdf | 5 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_1.pdf | 21 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_2.pdf | 21 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_3.pdf | 21 Oct 2023 |
| Certificates of CA (Form 5)File: Form 5- Parinee Eminence Phase 1_FY 2022-23.pdf | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Parinee Eminence Phase 1_FY 2022-23.pdf | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 5 Certificates of CA (Form 5) (2).pdf | 10 Jan 2023 |
| Certificates of CA (Form 5)File: RERA Form 5 Parinee Eminence Phase 1 FY 21 22.pdf | 30 Aug 2022 |
| Certificates of CA (Form 3)File: Rera Form 3 Eminence.pdf | 12 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 112 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PARINEE EMINENCE PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WORLI780+ in Mumbai City
Filed coordinates, straight-line distance. 59 registered projects within 2 km.
EMBASSY CITADEL
EQUINOX INDIA INFRAESTATE LIMITED, SPERO P
Hubtown - Celeste
Nayan Real Estate Private Limited
Godrej Trilogy Seafront
EMBELLISH HOUSES PRIVATE LIMITED, AKSHAY S
Kalpataru One - Wing A
Kalpataru Properties Limited
Godrej Trilogy Seaturf
EMBELLISH HOUSES PRIVATE LIMITED, AKSHAY S
WORLI HOUSE
HARBOUR FRONT PROPERTIES PRIVATE LIMITED
See every Mumbai City project, with the district possession charts
Builder: Om Omega Shelters Private Limited
Om Omega Shelters Private Limited has 1 registration on MahaRERA, including PARINEE EMINENCE PHASE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that PARINEE EMINENCE PHASE 1 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PARINEE EMINENCE PHASE 1 is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PARINEE EMINENCE PHASE 1?
The registered promoter entity is Om Omega Shelters Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PARINEE EMINENCE PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PARINEE EMINENCE PHASE 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PARINEE EMINENCE PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PARINEE EMINENCE PHASE 1?
The professionals named in the filing: Architect: Consultant Combined; Engineer: JW CONSULTANTS LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PARINEE EMINENCE PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback