Home / Browse projects / Thane, Maharashtra / PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD

Registered No litigation declared Residential / Group Housing project

PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD

By SHIV INFRA

RG-MH-18803 · RERA P51700077615 · Last updated on MahaRERA portal: 10 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 90%
53 of 55Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD is a Residential / Group Housing project by SHIV INFRA in Thane, Maharashtra, registered with MahaRERA as P51700077615 on 15 Oct 2024. Possession is promised by 2 Jun 2027. 2 of the 55 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NamePARAS APARTMENT CO-OP. HOUSING SOCIETY LTD
  • TypeResidential / Group Housing
  • Location
    • KHOJ KUNTWALI
    • AMBARNATH WEST
    • Khuntavali
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • RERA no.P51700077615
  • ReraGenie IDRG-MH-18803

Builder

  • NameSHIV INFRA
  • Entity typePartnership
  • GSTIN27AESFS0952F1ZP
  • PartnerSANDEEP ANANTA TELANGE
  • PartnersYASH RAJENDRA WALEKAR, UDHAV SANDEEP TELANGE, RAJENDRA SHIVLING WALEKAR, BHUSHAN ARVIND WALEKAR
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredOct 2024PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Oct 2024
  • Promised completion2 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Current status

4%2 of 55 units booked
67.7%Work done, per cost certificate

Figures as on 10 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Paras Apartment Co Op Housing society LtdNA6555055

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 90%.

Paras Apartment Co Op Housing society Ltd: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed84

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots84
Closed/Covered27
Open Space57

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,354 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2025
LandownerVillageDistrict
PARAG APARTMENT CO. OP HSG SOCIETAmbarnath(M Cl)Thane

Approvals and building plan

Sanctioning authorityAmbernath Municipal Council
Permissible FSI3500.0
Proposed, not sanctioned2,380 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, SWANAND SHOPPING CENTRE SHIVAJI CHOWK, NEAR AMBERNATH STATION DIST. THANE, AMBERNATH (EAST) 421501 MAHARASHTRA
Estimated costRs 8.73 cr
Cost incurredRs 5.91 cr
Work done67.68%
BuildingWingEstimatedIncurred
Paras Apartment Co Op Housing society LtdNARs 7.88 crRs 5.91 cr
-NARs 85.17 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURAJ ANDHARE ARCHITECT
EngineerM NANDWANI
Chartered AccountantFATEHCHANDANI & CO
PartnerRole in project
SHIV INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 2 Jun 2027

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Paras Form 1_0001.pdf10 Jun 2026
Withdrawal Update Form 1File: Paras Form 1_0001.pdf10 Jun 2026
Withdrawal Update Form 2File: Paras Form-2_0001.pdf10 Jun 2026
Withdrawal Update Form 2File: Paras Form-2_0001.pdf10 Jun 2026
Withdrawal Update Form 3File: paras from 3_0001.pdf10 Jun 2026
Withdrawal Update Form 3File: paras from 3_0001.pdf10 Jun 2026
Withdrawal Update Form 1File: FORM 1_0001_0001.pdf8 Jun 2026
Withdrawal Update Form 1File: Paras Chs Architect Certificate_0001_0001.pdf8 Jun 2026
Withdrawal Update Form 2File: FORM 2_0001.pdf8 Jun 2026
Withdrawal Update Form 2File: Paras Chs Engineer Certificate_0001.pdf8 Jun 2026
Withdrawal Update Form 3File: Form 3_0001.pdf8 Jun 2026
Withdrawal Update Form 3File: CA Certificate_0001.pdf8 Jun 2026
Withdrawal Update Form 1File: paras form 1_0001.pdf6 Jun 2026
Withdrawal Update Form 2File: paras form-2_0001.pdf6 Jun 2026
Withdrawal Update Form 3File: paras form -3_0001.pdf6 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate FORM 1.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate FORM 2.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Paras_0001.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Paras Engineer Certificate_0001.pdf21 Feb 2025
Other - LegalFile: AGREEMENT (1).pdf7 Oct 2024
Other - LegalFile: AGREEMENT (1).pdf7 Oct 2024
Other - LegalFile: AGREEMENT (1).pdf7 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Verification of Commencement Certificate Paras Apartment.pdf13 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Verification of Commencement Certificate Paras Apartment.pdf13 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Verification of Commencement Certificate Paras Apartment.pdf13 Aug 2024
Copy of the legal title reportFile: title.pdf31 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Prop_0001 (1).pdf31 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: bank shiv infra (1).pdf31 Jul 2024
Copy of the legal title reportFile: title.pdf31 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Prop_0001 (1).pdf31 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: bank shiv infra (1).pdf31 Jul 2024
Copy of the legal title reportFile: title.pdf31 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Prop_0001 (1).pdf31 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: bank shiv infra (1).pdf31 Jul 2024
Deviation Report with respect to Allotment letterFile: No Deviation report allotment letter_0001.pdf30 Jul 2024
Other - TechnicalFile: Annexure A_0002.pdf30 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report for agreement for sale_0001.pdf30 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclouser of secured Unsecured Finance_0001.pdf30 Jul 2024
Deviation Report with respect to Allotment letterFile: No Deviation report allotment letter_0001.pdf30 Jul 2024
Other - TechnicalFile: Annexure A_0002.pdf30 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report for agreement for sale_0001.pdf30 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclouser of secured Unsecured Finance_0001.pdf30 Jul 2024
Deviation Report with respect to Allotment letterFile: No Deviation report allotment letter_0001.pdf30 Jul 2024
Other - TechnicalFile: Annexure A_0002.pdf30 Jul 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report for agreement for sale_0001.pdf30 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclouser of secured Unsecured Finance_0001.pdf30 Jul 2024
Building plan approvalFile: cc.pdf24 Jul 2024
Layout approvalFile: plans.pdf24 Jul 2024
Building plan approvalFile: cc.pdf24 Jul 2024
Layout approvalFile: plans.pdf24 Jul 2024
Building plan approvalFile: cc.pdf24 Jul 2024
Layout approvalFile: plans.pdf24 Jul 2024
PAN CardFile: SHIV INFRA PAN .pdf24 Jul 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE_0001_0001 (1).pdf24 Jul 2024
Copy of Layout Approval (in case of layout)File: plans.pdf24 Jul 2024
Proforma of Allotment letterFile: allotment order 60.pdf24 Jul 2024
Declaration in FORM BFile: FORM B_0001 (2).pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHT CERT_0001 (1).pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_0001 (4) (1).pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_0001 (2).pdf24 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf24 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: cc.pdf24 Jul 2024
Declaration about Commencement CertificateFile: CC DECLARATION_0001 (1).pdf24 Jul 2024
CERSAI detailsFile: CERSAI DECLARATION_0001_0001.pdf24 Jul 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE_0001_0001 (1).pdf24 Jul 2024
Proforma of Agreement for saleFile: agreement order 60.pdf24 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A 1_0001.pdf24 Jul 2024
PAN CardFile: SHIV INFRA PAN .pdf24 Jul 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE_0001_0001 (1).pdf24 Jul 2024
Copy of Layout Approval (in case of layout)File: plans.pdf24 Jul 2024
Proforma of Allotment letterFile: allotment order 60.pdf24 Jul 2024
Declaration in FORM BFile: FORM B_0001 (2).pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHT CERT_0001 (1).pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_0001 (4) (1).pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE_0001 (2).pdf24 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf24 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: cc.pdf24 Jul 2024
Declaration about Commencement CertificateFile: CC DECLARATION_0001 (1).pdf24 Jul 2024
CERSAI detailsFile: CERSAI DECLARATION_0001_0001.pdf24 Jul 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE_0001_0001 (1).pdf24 Jul 2024

How this compares with Thane

4%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBARNATH WEST7,600+ in Thane

Builder: SHIV INFRA

Shiv Infra has 3 registrations on MahaRERA, including Shiv Empire and BHAVESHWAR CAASA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD is delayed beyond 2 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD?

The registered promoter entity is SHIV INFRA, a partnership as per the filing. Its GSTIN 27AESFS0952F1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD?

The professionals named in the filing: Architect: SURAJ ANDHARE ARCHITECT; Engineer: M NANDWANI; Chartered Accountant: FATEHCHANDANI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARAS APARTMENT CO-OP. HOUSING SOCIETY LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.