Red flags

  • Rs 6.25 crore secured on the land, in favour of AMBARNATH JAI HIND CO OP BANK LT, AMBARNATH JAI HIND CO OP BANK LTD

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
73 of 77Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Panvelkar Evoke Co-op Housing Society Ltd is a Residential / Group Housing project by Panvelkar Group Infrastructure in Thane, Maharashtra, registered with MahaRERA as P51700077394 on 13 Aug 2024. Possession is promised by 31 Dec 2028. 4 of the 77 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NamePanvelkar Evoke Co-op Housing Society Ltd
  • TypeResidential / Group Housing
  • Location
    • -
    • Katrap
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077394
  • ReraGenie IDRG-MH-17742

Builder

  • NamePanvelkar Group Infrastructure
  • Entity typePartnership
  • PartnersSudesh Yashwant Sontakke, Subodh Ramesh Alshi, Sukumar Pradeep Dhule, Amit Sudhakar Bidvi, Yogesh Vinayak Panvelkar, Pramod Vishnu Patil, Shodhan Shekhar Ambavane

Key dates

this monthRegisteredAug 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Aug 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

5%4 of 77 units booked
50.7%Work done, per cost certificate

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Panvelkar Evoke Co-op Housing Society LtdNA88195877

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

Panvelkar Evoke Co-op Housing Society Ltd: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area627 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAMBARNATH JAI HIND CO OP BANK LT, AMBARNATH JAI HIND CO OP BANK LTD
Secured amountRs 6.25 crore
CERSAI search filedYes
Declared on11 Jun 2026
LandownerVillageDistrict
Panvelkar Evoke Co-operative Housing Society LtdBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKulgaon-Badlapur Municipal Council
Permissible FSI2257.41
Proposed, not sanctioned2,257 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPanvelkar Plaza, Station road, Ambernath East
Estimated costRs 8.13 cr
Cost incurredRs 4.12 cr
Work done50.73%
BuildingWingEstimatedIncurred
Panvelkar Evoke Co-op Housing Society LtdNARs 7.49 crRs 4.12 cr
-NARs 63.11 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPramod V Patil & Associates
EngineerAtul Kudtarkar & Associates Pvt Ltd
Chartered AccountantASKA & Co
PartnerRole in project
Panvelkar Group Infrastructure-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 01 FORM-1 (09-04-26).pdf15 Jun 2026
Withdrawal Update Form 2File: 02 FORM-2 (01-01-26 TO 31-3-2026).pdf15 Jun 2026
Withdrawal Update Form 3File: 03 FORM-3_31-03-26_.pdf15 Jun 2026
Form 1File: Form-1 march 2025 signed.pdf30 Apr 2026
Form 2File: Engineers Certificates.pdf30 Apr 2026
Form 3File: Form 31 3 25.pdf30 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure 31 3 25.pdf30 Apr 2026
Form 1File: Form 1 Architects Certificate 7oct24.pdf28 Apr 2026
Form 2File: Form 2 Engineers Certificate 17 oct 24.pdf28 Apr 2026
Form 3File: Form 3 Sep 24 Signed.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Sep 24.pdf28 Apr 2026
Form 1File: Form - 1.pdf28 Apr 2026
Form 2File: Form - 2.pdf28 Apr 2026
Form 3File: Form 3 31 12 24 Final.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Dec 24.pdf28 Apr 2026
Form 1File: Form 1 june month.pdf28 Apr 2026
Form 2File: Form 2 june month.pdf28 Apr 2026
Form 3File: Form 3 30 6 25.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure 30 6 25.pdf28 Apr 2026
Form 1File: form 1 Sep month signed.pdf28 Apr 2026
Form 2File: Form 2 sep month (1) signed.pdf28 Apr 2026
Form 3File: Form 3 31 09 25.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure 30 09 25.pdf28 Apr 2026
Form 1File: form 1 Dec month signed.pdf28 Apr 2026
Form 2File: Form 2 Dec month (1) signed.pdf28 Apr 2026
Form 3File: Form 3 31 12 2025.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure 31 12 25.pdf28 Apr 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1-Final.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate 7oct24.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate 17 oct 24.pdf15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 230724.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 010824.pdf3 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Annexure F.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate.pdf14 Jun 2024
Proforma of Allotment letterFile: Revised Allotemnet letter_Final.pdf14 Jun 2024
Other - TechnicalFile: Declaration.pdf14 Jun 2024
Proforma of Agreement for saleFile: Rera Draft_Agreement Letter.pdf11 Jun 2024
Details of encumbrances concerned to FinanceFile: 6_Declaration For no Encumbrances.pdf5 Jun 2024
Details of encumbrances concerned to LegalFile: 6_Declaration For no Encumbrances.pdf5 Jun 2024
Declaration about Commencement CertificateFile: 2_Declaration of commencement certificate.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: 1_Disclosure of Sold.pdf5 Jun 2024
CERSAI detailsFile: Cersai_Search report.pdf5 Jun 2024
Deviation Report with respect to Allotment letterFile: 4_Declaration no Deviation in Allotment Letter.pdf5 Jun 2024
Deviation Report with respect to model copy of AgreementFile: 5_Declaration for no Deviation.pdf5 Jun 2024
Layout approvalFile: 0_PGI KBMC Plan 2mb.pdf4 Jun 2024
Copy of the legal title reportFile: 1_legal title report.pdf4 Jun 2024
Copy of the legal title reportFile: 2_PGI title certificate.pdf4 Jun 2024
Copy of Layout Approval (in case of layout)File: 0_PGI KBMC Plan 2mb.pdf4 Jun 2024
CERSAI detailsFile: Undertaking regarding CERSAI.pdf4 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 3_Declarartion about separate bank account.pdf4 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1_Yogesh panvelkar.pdf27 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2_Amit Panvelkar.pdf24 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 3_Pramod Patil.pdf24 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 4_Sudesh Sontakke.pdf24 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 5_Shodhan Ambavne.pdf24 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 6_Amit Bidvi.pdf24 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 7_Subodh Alshi.pdf24 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 8_Sukumar Dhule.pdf24 May 2024
PAN CardFile: PGI PAN Card.pdf28 Feb 2024
Building plan approvalFile: 0_PGI KBMC Plan 2mb.pdf17 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 0_PGI KBMC Plan 2mb.pdf17 Feb 2024
Declaration in FORM BFile: Panvelkar Group Infra Promoters Form B.pdf17 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 02_Panvelkar Evoke Commencement Certificate_compressed.pdf16 Feb 2024

How this compares with Thane

5%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Panvelkar Evoke Co-op Housing Society Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Katrap7,600+ in Thane

2 kmPanvelkar Evoke Co-op HoCompleted 207Lapsed / revoked 78Other 128Dot size: filed unitsN

Filed coordinates, straight-line distance. 413 registered projects within 2 km.

Builder: Panvelkar Group Infrastructure

Panvelkar Group Infrastructure has 1 registration on MahaRERA, including Panvelkar Evoke Co-op Housing Society Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Panvelkar Evoke Co-op Housing Society Ltd is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Panvelkar Evoke Co-op Housing Society Ltd?

The registered promoter entity is Panvelkar Group Infrastructure, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Panvelkar Evoke Co-op Housing Society Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Panvelkar Evoke Co-op Housing Society Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Panvelkar Evoke Co-op Housing Society Ltd?

The professionals named in the filing: Architect: Pramod V Patil & Associates; Engineer: Atul Kudtarkar & Associates Pvt Ltd; Chartered Accountant: ASKA & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Panvelkar Evoke Co-op Housing Society Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Panvelkar Evoke Co-op Housing Society Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Panvelkar Evoke Co-op Housing Society Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.