Home / Browse projects / Thane, Maharashtra / Panvelkar Crown B Wing

Registration lapsed No litigation declared Residential / Group Housing project

Panvelkar Crown B Wing

By Rahul Vijay Panvelkar

RG-MH-55262 · RERA P51700031822 · Last updated on MahaRERA portal: 21 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Panvelkar Crown B Wing is a Residential / Group Housing project by Rahul Vijay Panvelkar in Thane, Maharashtra, registered with MahaRERA as P51700031822 on 12 Nov 2021. Possession was promised by 31 Dec 2024 and is now 22 months past that date.

At a glance

Project

  • NamePanvelkar Crown B Wing
  • TypeResidential / Group Housing
  • Location
    • GREENCITY ROAD
    • MORIVALI PADA
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700031822
  • ReraGenie IDRG-MH-55262

Builder

  • NameRahul Vijay Panvelkar
  • Entity typeIndividual
  • GSTIN27AKBPP1686L1ZP
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

22 months past promisethis monthRegisteredNov 2021PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on12 Nov 2021
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Crown B WingNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Crown B Wing: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered12
Open Space12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area676 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityAmbernath Municipal Council
Permissible FSI2896.96
Proposed, not sanctioned2,897 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAMBERNATH

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrasad Garad
EngineerAtul Kudtarkar
Chartered AccountantAmbekar Shelar Karve Ambardekar
PartnerRole in project
Rahul Vijay Panvelkar-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Feb 2025

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Crown B Wing Sold Unsold (31 12 24).pdf21 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Crown B Wing Completion Certificate.pdf14 Feb 2025
Declaration in FORM BFile: Crown B Wing Form B Declaration by Promoter (Notarised)_compressed.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Crown B Wing Form 3 June 24 Qtr_compressed.pdf1 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Crown B Wing Form 3 Sept 24 Qtr_compressed.pdf1 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Crown B Wing Form 5 23-24.pdf1 Feb 2025
Proforma of Agreement for saleFile: Flat Sale Agreement draft-rera.pdf30 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (RVP) Sign.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Panvelkar Crown - B Wing.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crown B Wing Form 1 Oct To Dec 24.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Nisarg A2 Bldg Sold Unsold (31 12 24).pdf21 Jan 2025
CERSAI detailsFile: Format Letter No encumbrance Crown B Wing.pdf26 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Seprate Bank Account RERA Crown B Wing.pdf26 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Crown B Wing 23-24.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crown B-Wing Form 1 Apr To June 24.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crown B-Wing Form 1 July To Sept 24.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Crown B Wing Sold Unsold July To Sept 24.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crown B Wing Form 1_July To Sept 23.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Crown B Wing.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Crown B Wing Sold Unsold Apr To June 24.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Crown B Wing Form 2 (Jan To March 24).pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crown B-Wing Form 1 Jan To March 24.pdf12 Apr 2024
Disclosure of sold/ booked inventoryFile: Crown B Wing Sold Unsold Jan To March 24.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crown B Wing F1 Dec.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Crown B Wing Sold Unsold.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Crown B Wing Form 2 (July To Sept 23).pdf28 Dec 2023
Disclosure of sold/ booked inventoryFile: Crown B Wing July To Sept 23.pdf17 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crown B Wing Form 1_July To Sept 23.pdf11 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Crown B Wing Form 2A (M22).pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Crown B Wing Form 2A (M23).pdf31 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Crown B-Wing Form 2.pdf24 Jul 2023
Disclosure of sold/ booked inventoryFile: Crown B Wing.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Crown B Wing (J 23).pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Crown B Wing Jan To March 23.pdf9 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crown B Wing Form 1_compressed.pdf3 May 2023
Disclosure of sold/ booked inventoryFile: panvelkar crown B wing.pdf14 Apr 2023
Disclosure of sold/ booked inventoryFile: Crown B Wing.pdf25 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crown B Wing Form 1 (Dec Qtr)_compressed.pdf12 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Crown B Wing Form 2 (Dec Qtr).pdf12 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Crown B Wing.pdf13 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Crown B Wing.pdf13 Oct 2022
Details of encumbrancesFile: Encumbrance.pdf3 Nov 2021
Layout approvalFile: Sheet 1 Plan.pdf22 Oct 2021
Layout approvalFile: Sheet 2 Plan.pdf22 Oct 2021
Building plan approvalFile: Sheet 1 Plan.pdf22 Oct 2021
Building plan approvalFile: Sheet 2 Plan.pdf22 Oct 2021
PAN CardFile: Rahul Vijay Panvelkar- Pan Card.pdf22 Oct 2021
Copy of the legal title reportFile: Title.pdf22 Oct 2021
Copy of Layout Approval (in case of layout)File: Sheet 1 Plan.pdf22 Oct 2021
Copy of Layout Approval (in case of layout)File: Sheet 2 Plan.pdf22 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 1 Plan.pdf22 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Sheet 2 Plan.pdf22 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certi Gut No 18 plot No 16 17.pdf22 Oct 2021
Declaration about Commencement CertificateFile: Format D.pdf22 Oct 2021
Declaration in FORM BFile: Form B (Affidavit).pdf22 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Form 1.pdf22 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf22 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf22 Oct 2021
Proforma of Allotment letterFile: Flat Sale Agreement draft-rera.pdf22 Oct 2021
Proforma of Allotment letterFile: Provisinal Allotment letter.pdf22 Oct 2021

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Panvelkar CrownGut No 21 Morivali Ambernath31CompletedDec 2018Late, Aug 2019
Panvelkar Twin TowerGut No 21 Morivali Ambernath East102CompletedDec 2016Oct 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Panvelkar Crown B Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MORIVALI PADA7,600+ in Thane

2 kmPanvelkar Crown B WingCompleted 77Lapsed / revoked 36Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 155 registered projects within 2 km.

Builder: Rahul Vijay Panvelkar

Rahul Vijay Panvelkar has 2 registrations on MahaRERA, including Panvelkar Crown and Panvelkar Crown B Wing. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Panvelkar Crown B Wing shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Panvelkar Crown B Wing is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Panvelkar Crown B Wing?

The registered promoter entity is Rahul Vijay Panvelkar, an individual as per the filing. Its GSTIN 27AKBPP1686L1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Panvelkar Crown B Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Panvelkar Crown B Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Panvelkar Crown B Wing?

The professionals named in the filing: Architect: Prasad Garad; Engineer: Atul Kudtarkar; Chartered Accountant: Ambekar Shelar Karve Ambardekar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Panvelkar Crown B Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Panvelkar Crown B Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Panvelkar Crown B Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.