Home / Browse projects / Thane, Maharashtra / PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9

Registered No litigation declared Residential / Group Housing project

PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9

By PANVELKAR BHOOMI

RG-MH-74314 · RERA P51700050061 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
11 of 55Construction stages doneacross 5 buildings; furthest along: Slabs of Super Structure, 12%
133 of 160Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 126 documents Report an error

PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9 is a Residential / Group Housing project by PANVELKAR BHOOMI in Thane, Maharashtra, registered with MahaRERA as P51700050061 on 13 Mar 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 27 of the 160 units on this registration are recorded sold or booked, and 11 of 55 construction stages are filed complete.

At a glance

Project

  • NamePANVELKAR BHOOMI BUILDING NO 5,6,7,8,9
  • TypeResidential / Group Housing
  • Location
    • MAUJE KHARWAI
    • TALUKA AMBERNATH
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700050061
  • ReraGenie IDRG-MH-74314

Builder

  • NamePANVELKAR BHOOMI
  • Entity typePartnership
  • PartnersJAYANTILAL TULSHI PARMAR, DHIREN JAYANTILAL PARMAR, AMIT VINAYAK PANVELKAR, ASLAM ZAHIR DON, TAHA ASLAM DON, VISHWANATH RAMCHANDRA PANVELKAR, HEMLATA BACHU HINGU, MAHENDRA JETHALAL DANANI, ASHA MAHENDRA DANANI, JINESH MAHENDRA HINGU, VAISHALI AMIT PANVELKAR, RAHUL VIJAY PANVELKAR and 1 more

Key dates

this monthRegisteredMar 2023First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Mar 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
  • Buildings5 building records
  • Documents filed126 files

Current status

17%27 of 160 units booked
29.0%Work done, per cost certificate

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 5 BLOSSOMNA7732032
BUILDING NO 6 CLOVERNA7732032
BUILDING NO 7 DAFFODILNA7732032
BUILDING NO 8 FLORANA7732032
BUILDING NO 9 LOTUSNA7732032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 12%.

BUILDING NO 5 BLOSSOM19%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 6 CLOVER0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 7 DAFFODIL0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 8 FLORA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 9 LOTUS82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes10%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,751 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jun 2025

Approvals and building plan

Sanctioning authorityKULGOAN BADLAPUR NAGARPARISHAD
Permissible FSI5051.0
Proposed, not sanctioned4,751 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPANVELKAR PLAZA, STATION ROAD, SAI SECTION, DIST THANE, AMBERNATH
Estimated costRs 20.21 cr
Cost incurredRs 5.85 cr
Work done28.97%
BuildingWingEstimatedIncurred
BUILDING NO 9 LOTUSNARs 4.24 crRs 4.20 cr
BUILDING NO 5 BLOSSOMNARs 3.59 crRs 1.29 cr
BUILDING NO 6 CLOVERNARs 3.59 cr-
BUILDING NO 7 DAFFODILNARs 3.59 cr-
BUILDING NO 8 FLORANARs 3.59 cr-
-NARs 1.62 crRs 36.13 lakh

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPramod Patil
EngineerAtul Kudtarkar & Associates
EngineerAtul Kudtarkar and Associates Pvt Ltd
EngineerKunal Punyarthi
Chartered AccountantCA Ashvin Thumar & Co
Chartered AccountantA S K A & CO.
Chartered AccountantMonisha Kuperkar
Chartered AccountantKirtane & Pandit LLP
Chartered AccountantJOSHI CHHADVA & CO LLP
Chartered AccountantJOSHI KALE & ASSOCIATES
PartnerRole in project
PANVELKAR BHOOMI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA25112518434Dec 2025 → Dec 2027

Reason as filed by the promoterWe have registered under Real Estate Regulatory Act, 2016 bearing registration number P51700050061.The date of completion of project Panvelkar Bhoomi (Building No. 5,6,7,8,9)" developed by M/s Panvelkar Bhooml currently is 31st December, 2025. We would like to bring to your notice that the project comprises of five buildings namely Building No. 5,6, 7,8 & 9. Out of these buildings, only two buildings work has been started due to sluggish market demand and bookings were also taken in those two buildings only. For other buildings i.e. Building No. 6, 7, and 8, no work has been started & no booki

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed126

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 126 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Signed Form 1 as on March 2026__Panvelkar Bhoomi.pdf1 Jun 2026
Withdrawal Update Form 2File: Signed Form 2 as on March 2026__Panvelkar Bhoomi.pdf1 Jun 2026
Withdrawal Update Form 3File: Signed Form 3 of Panvelkar Bhoomi as on March 2026 .pdf1 Jun 2026
Withdrawal Update Form 1File: Signed Form 1 as on December 2025.pdf23 Mar 2026
Withdrawal Update Form 2File: Signed Form 2 as on December 2025.pdf23 Mar 2026
Withdrawal Update Form 3File: Signed Form 3__Panvelkar Bhoomi as on December 25.pdf23 Mar 2026
Form 5 (FY 2022-2023)File: Form 5 FY 22-23 Panvelkar Bhoomi.pdf27 Dec 2025
Form 2A (FY 2022-2023)File: Form 2A_2022-23.pdf26 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A_2023-24.pdf26 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A_2024-25.pdf26 Dec 2025
Form 5 (FY 2023-2024)File: CA certificate for Rera (Form 5).pdf1 Dec 2025
Form 5 (FY 2024-2025)File: Signed Copy Form 5 Panvelkar Bhoomi FY 24-25.pdf1 Dec 2025
Form 1File: Bhoomi Form1 march 23 signed.pdf25 Nov 2025
Form 2File: Bhoomi Form 2 March 2023 Signed.pdf25 Nov 2025
Form 3File: Form 3 march 2023 signed.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold March 23.pdf25 Nov 2025
Withdrawal Update Form 1File: Bhoomi Form 1 Sept’25 signed.pdf25 Nov 2025
Withdrawal Update Form 2File: Bhoomi Form 2 July - Sept 2025 signed.pdf25 Nov 2025
Withdrawal Update Form 3File: Form 3 Bhoomi Sept 2025 signed_compressed (1).pdf25 Nov 2025
Form 1File: Panvelkar Bhoomi Form 1 June 2023_compressed.pdf19 Aug 2025
Form 2File: Panvelkar Bhoomi Form 2 June 2023_compressed.pdf19 Aug 2025
Form 3File: Panvelkar Bhoomi Form 3 June 2023_compressed.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_compressed.pdf19 Aug 2025
Form 1File: Panvelkar Bhoomi Form 1 Sept 2023_compressed.pdf19 Aug 2025
Form 2File: Panvelkar Bhoomi Form 2 Sept 23 Final.pdf19 Aug 2025
Form 3File: Panvelkar Bhoomi Form 3 Sept 23.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory_compressed.pdf19 Aug 2025
Form 1File: form 1 Dec 2023.pdf19 Aug 2025
Form 2File: Form 2 Dec 2023.pdf19 Aug 2025
Form 3File: form 3 dec 2023.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf19 Aug 2025
Form 1File: Form 1 March 24.pdf19 Aug 2025
Form 2File: Form 2 March 24.pdf19 Aug 2025
Form 3File: Form 3 March 24.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory.pdf19 Aug 2025
Form 1File: form 1 Q1 2025.pdf19 Aug 2025
Form 2File: Form 2 Q1 2025.pdf19 Aug 2025
Form 3File: Form 3 Q1 2025.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q1 2024-25 Sales.pdf19 Aug 2025
Form 1File: Form 1 Q2 2025.pdf19 Aug 2025
Form 2File: Form 2 Q2 2025.pdf19 Aug 2025
Form 3File: Form 3 Q2 2025.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Q2 2024-25 Sales .pdf19 Aug 2025
Form 1File: Form 1 Q3 2025.pdf19 Aug 2025
Form 2File: Form 2 Q3 2025.pdf19 Aug 2025
Form 3File: Form 3 Q3 2025.pdf19 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Unsold Inventory.pdf19 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf18 Aug 2025
Withdrawal Update Form 2File: Form 2.pdf18 Aug 2025
Withdrawal Update Form 3File: Form 3 of Panvelkar Bhoomi June 2025.pdf18 Aug 2025
Form 1File: Form 1 signed Q4__Compressed.pdf8 Jul 2025
Form 2File: Signed Form 2 Q4__Compressed.pdf8 Jul 2025
Form 3File: Signed Form 3 Jan 25-Mar 25.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory sheet revised .pdf8 Jul 2025
Self-declaration of Quarterly ProgressFile: SELF declaration RERA.pdf8 Jul 2025
Withdrawal Update Form 1File: Form 1 signed Q4__Compressed.pdf8 Jul 2025
Withdrawal Update Form 2File: Signed Form 2 Q4__Compressed.pdf8 Jul 2025
Withdrawal Update Form 3File: Signed Form 3 Jan 25-Mar 25.pdf8 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Q1 2025.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2 2025.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q3 2025.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2 Q3 2025.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q1 2025.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q2 2025.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 2025.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1 2025.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 2025.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Q2 2024-25 Sales .pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Q3 2024-25 Sales.pdf22 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Q1 2024-25 Sales.pdf22 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA certificate for Rera (Form 5).pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 24.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 24.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Dec 2023.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2023.pdf28 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf28 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 dec 2023.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Panvelkar Bhoomi Form 2 Sept 23 Final.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Panvelkar Bhoomi Sept 2023.pdf16 Nov 2023

How this compares with Thane

17%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALUKA AMBERNATH7,600+ in Thane

2 kmPANVELKAR BHOOMI BUILDINCompleted 77Lapsed / revoked 31Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: PANVELKAR BHOOMI

PANVELKAR BHOOMI has 1 registration on MahaRERA, including PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9?

The registered promoter entity is PANVELKAR BHOOMI, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9?

The professionals named in the filing: Architect: Pramod Patil; Engineer: Atul Kudtarkar & Associates; Engineer: Atul Kudtarkar and Associates Pvt Ltd; Engineer: Kunal Punyarthi; Chartered Accountant: CA Ashvin Thumar & Co; Chartered Accountant: A S K A & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.