Home / Browse projects / Mumbai Suburban, Maharashtra / PANT NAGAR INDRAYANI CHS LTD BLD 13

Registration lapsed No litigation declared Others project

PANT NAGAR INDRAYANI CHS LTD BLD 13

By SHAGUN REALITY

RG-MH-27148 · RERA P51800012189 · Last updated on MahaRERA portal: 8 Aug 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • 5 complaints at MahaRERA
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
4 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 50%
5Complaints at MahaRERAon this registration
Jump to the 40 documents Report an error

PANT NAGAR INDRAYANI CHS LTD BLD 13 is a Others project by SHAGUN REALITY in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800012189 on 1 Sep 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 24 months from the original filing. 5 complaints are on record with the regulator.

At a glance

Project

  • NamePANT NAGAR INDRAYANI CHS LTD BLD 13
  • TypeOthers
  • Location
    • Kurla
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • RERA no.P51800012189
  • ReraGenie IDRG-MH-27148

Builder

  • NameSHAGUN REALITY
  • Entity typePartnership
  • PartnerDEEPAK LALJI RANGANI

Key dates

40 months past promisethis monthRegisteredSep 2017First promiseJun 2021Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Sep 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PANTNAGAR INDRAYANI CHS LTDNA150000
PANT NAGAR INDRAYANI CHS LTD BLD 13 15 16 FLOORSNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Aug 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 50%.

PANTNAGAR INDRAYANI CHS LTD36%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
PANT NAGAR INDRAYANI CHS LTD BLD 13 15 16 FLOORS18%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Aug 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Open Space2

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area868 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PANTANAGAR INDRAYANI CHS LTDKurlaMumbai Suburban

Approvals and building plan

Permissible FSI4278.95
Proposed, not sanctioned3,725 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchARIHANT DARSHAN JUNCTION OF TILAK ROAD GHATKOPAR E 4000777

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHITECTURAL CONCEPT
EngineerSV PATELAND ASSOCITES
PartnerRole in project
SHAGUN REALITY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800010182Jun 2021 → Jun 2022

Reason as filed by the promoterDUE TO ONGOING COVID-19 PANDEMIC THE WORK ON SITE HAS SLOWED DOWN. WE ALSO INTENT TO CLUB THIS PROJECT WITH ANOTHER PROJECT BUT TO THESE PRESENT PANDEMIC THINGS HAVE STALLED AND WE ARE NOT ABE TO MOVE THINGS AHEAD IN RESPECT TO THE CLUBBING OF SCHEME AND DUE TO WHICH THE PROJECT WAS NOT ABLE TO GET COMPLETED IN TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION FOR 12 MONTHS

EXT51800012289Jun 2021 → Jun 2023

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 30/06/2023

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC006000000054561JUGAL MANOJ ADVADeepak Rangani19/05/2018
CC006000000055609Sunil JoisharShagun Reality07/08/2018
CC006000000055610Prakash GalaShagun Reality07/08/2018
CC006000000057779Radha Vivek GosaviM/s. Shagun Reality29/01/2019
CC006000000429012Manisha Bhavesh MakwanaMahesh Sitaram Poddar04/04/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed40

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer form 2A 19-20.pdf8 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer form 2A 20-21.pdf8 Aug 2022
CERSAI detailsFile: Cersai declaration.pdf8 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form-5 FY 17-18.pdf8 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 FY 18-19.pdf8 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 FY 19-20.pdf8 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA form 5 20-21.pdf18 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf8 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf8 Jul 2021
Declaration about Commencement CertificateFile: covering letter for cc declartion.pdf1 Jul 2021
Disclosure of sold/ booked inventoryFile: Inventory list-booked flats.pdf1 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 Shagun Realty 17-18.pdf1 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Shagun Realty 18-19.pdf1 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Shagun Realty 19-20.pdf1 Jul 2021
Building plan approvalFile: Amended plan letter.pdf25 Apr 2018
Building plan approvalFile: Drawing1.pdf25 Apr 2018
Building plan approvalFile: Drawing2.pdf25 Apr 2018
Building plan approvalFile: Drawing3.pdf25 Apr 2018
Building Plan Approval (IOD)File: Amended plan letter.pdf25 Apr 2018
Building Plan Approval (IOD)File: Drawing1.pdf25 Apr 2018
Building Plan Approval (IOD)File: Drawing2.pdf25 Apr 2018
Building Plan Approval (IOD)File: Drawing3.pdf25 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf25 Apr 2018
OtherFile: bldg 13 revalidation 2018-ilovepdf-compressed (1).pdf25 Apr 2018
Building plan approvalFile: PLAN 2.pdf29 Jul 2017
Layout approvalFile: PLAN 3.pdf29 Jul 2017
Building plan approvalFile: PLAN 3.pdf29 Jul 2017
Building plan approvalFile: PLAN 0.pdf29 Jul 2017
PAN CardFile: PAN CARD.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate (2).pdf29 Jul 2017
Details of encumbrancesFile: ENCUMB.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: PLAN 3.pdf29 Jul 2017
Building Plan Approval (IOD)File: PLAN 3.pdf29 Jul 2017
Building Plan Approval (IOD)File: PLAN 0.pdf29 Jul 2017
Building Plan Approval (IOD)File: PLAN 2.pdf29 Jul 2017
Declaration in FORM BFile: Form B-ilovepdf-compressed.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Architect certificate.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA Certificate SR001.pdf29 Jul 2017
Proforma of Allotment letterFile: AFS.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PANT NAGAR INDRAYANI CHS LTD BLD 13 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

Builder: SHAGUN REALITY

SHAGUN REALITY has 1 registration on MahaRERA, including PANT NAGAR INDRAYANI CHS LTD BLD 13. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that PANT NAGAR INDRAYANI CHS LTD BLD 13 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PANT NAGAR INDRAYANI CHS LTD BLD 13 is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PANT NAGAR INDRAYANI CHS LTD BLD 13?

The registered promoter entity is SHAGUN REALITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PANT NAGAR INDRAYANI CHS LTD BLD 13?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against PANT NAGAR INDRAYANI CHS LTD BLD 13?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for PANT NAGAR INDRAYANI CHS LTD BLD 13?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PANT NAGAR INDRAYANI CHS LTD BLD 13?

The professionals named in the filing: Architect: ARCHITECTURAL CONCEPT; Engineer: SV PATELAND ASSOCITES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PANT NAGAR INDRAYANI CHS LTD BLD 13?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PANT NAGAR INDRAYANI CHS LTD BLD 13. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PANT NAGAR INDRAYANI CHS LTD BLD 13 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.