PANOREEVA GREENS
RG-MH-23432 · RERA P52100078744 · Last updated on MahaRERA portal: 20 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PANOREEVA GREENS is a Residential / Group Housing project by AVIRAT DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100078744 on 8 Jan 2025. Possession is promised by 31 Dec 2028. 24 of the 144 units on this registration are recorded sold or booked, and 2 of 33 construction stages are filed complete.
At a glance
Project
- NamePANOREEVA GREENS
- TypeResidential / Group Housing
- Location
- CHINCHWADGAON
- WAHLEKARWADI
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100078744
- ReraGenie IDRG-MH-23432
Builder
- NameAVIRAT DEVELOPERS
- Entity typePartnership
- PartnersSACHIN DATTATRAYA BHONDVE, VISHAL DATTATRAYA BHONDVE, VAISHALI SHASHIKANT CHAVAN, SHIVSAI INFRA REALITY LLP SHISAI INFRA REALITY LLP
- Auothorized SignatorySACHIN AVINASH BHALERAO
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jan 2025
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings3 building records
- Documents filed86 files
Current status
Figures as on 20 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 17 | 14 | 54 | 0 | 54 |
| B WING | NA | 17 | 14 | 54 | 0 | 54 |
| C WING | NA | 9 | 6 | 36 | 0 | 36 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 90%.
A WING22%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B WING22%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 90% |
| Podiums (if any) | 0% |
| Plinth | 50% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed292
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 97 | 97 |
| B WING | 92 | 92 |
| C WING | 103 | 103 |
Land and ownership22
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RUPALI NITIN SATHE | Pimpri Chinchawad (M Corp.) | Pune |
| JYOTI SUNIL HAGAVANE | Pimpri Chinchawad (M Corp.) | Pune |
| BABU NARAYAN WALHEKAR | Pimpri Chinchawad (M Corp.) | Pune |
| Smt. MANDAKINI UTTAM WALHEKAR | Pimpri Chinchawad (M Corp.) | Pune |
| BAPU UTTAM WALHEKAR | Pimpri Chinchawad (M Corp.) | Pune |
| SHANKAR TUKARAM PADWAL | Pimpri Chinchawad (M Corp.) | Pune |
| DATTATRAY TUKARAM PADWAL | Pimpri Chinchawad (M Corp.) | Pune |
| Mrs. SULOCHANA TUKARAM WALHEKAR | Pimpri Chinchawad (M Corp.) | Pune |
| BHAGWAN SHANKAR jAGTAP | Pimpri Chinchawad (M Corp.) | Pune |
| MAHADU SHANKAR WALHEKAR | Pimpri Chinchawad (M Corp.) | Pune |
| PANDURANG TUKARARAM PADWAL | Pimpri Chinchawad (M Corp.) | Pune |
| VIMAL PANDURANG PADWAL | Pimpri Chinchawad (M Corp.) | Pune |
| SOPAN TUKARAM WALHEKAR | Pimpri Chinchawad (M Corp.) | Pune |
| SADHU SHANKAR WALHEKAR | Pimpri Chinchawad (M Corp.) | Pune |
| NAMDEV SHANKAR WALHEKAR | Pimpri Chinchawad (M Corp.) | Pune |
| Mrs. CHHAYA GULAB PADWAL | Pimpri Chinchawad (M Corp.) | Pune |
| Mrs.SANGITA SHANKAR PAWDAL | Pimpri Chinchawad (M Corp.) | Pune |
| Mrs. MANDA DATTARAY PADWAL | Pimpri Chinchawad (M Corp.) | Pune |
| Mrs.SUNANDA TUKARAM KUNJIR | Pimpri Chinchawad (M Corp.) | Pune |
| OMKAR GULAB PADWAL | Pimpri Chinchawad (M Corp.) | Pune |
| Mrs. VRUSHALI SHEKHAR RAKSHE | Pimpri Chinchawad (M Corp.) | Pune |
| Mrs. AMRUTA SANTOSH SHELKE | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 40.92 cr | Rs 1.84 cr |
| B WING | NA | Rs 40.27 cr | Rs 1.81 cr |
| C WING | NA | Rs 18.24 cr | - |
| - | NA | Rs 4.74 cr | Rs 1.91 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHEKHAR KOKANE |
| Engineer | DINESH BHARAT MANJARE |
| Chartered Accountant | VAISHALI ROHIDAS GOLE |
| Partner | Role in project |
|---|---|
| AVIRAT DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Nov 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Letter.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Arch Certificate.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Q2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Q2_compressed.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Q2_compressed.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Architect Letter.pdf | 8 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 8 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 8 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate.pdf | 25 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf | 25 Apr 2025 |
| Layout approvalFile: 03-08.pdf | 12 Feb 2025 |
| Layout approvalFile: 01-08.pdf | 12 Feb 2025 |
| Building plan approvalFile: 03-08.pdf | 12 Feb 2025 |
| Building plan approvalFile: 01-08.pdf | 12 Feb 2025 |
| Layout approvalFile: 03-08.pdf | 12 Feb 2025 |
| Layout approvalFile: 01-08.pdf | 12 Feb 2025 |
| Building plan approvalFile: 03-08.pdf | 12 Feb 2025 |
| Building plan approvalFile: 01-08.pdf | 12 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: 03-08.pdf | 12 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: 01-08.pdf | 12 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 03-08.pdf | 12 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 01-08.pdf | 12 Feb 2025 |
| Other - TechnicalFile: Correction.pdf | 12 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: 03-08.pdf | 12 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: 01-08.pdf | 12 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 03-08.pdf | 12 Feb 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 01-08.pdf | 12 Feb 2025 |
| Other - TechnicalFile: Correction.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1).pdf | 23 Dec 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf | 16 Dec 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (2).pdf | 13 Dec 2024 |
| Other - FinanceFile: Self Declaration (2).pdf | 13 Dec 2024 |
| Other - TechnicalFile: MHADA Flats Declaration (2).pdf | 13 Dec 2024 |
| Building plan approvalFile: Plan 1 of 8.pdf | 2 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 2 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1 of 8.pdf | 2 Dec 2024 |
| Proforma of Agreement for saleFile: RERA Draft 30112024.pdf | 2 Dec 2024 |
| Other - FinanceFile: Authorized Signatory1.pdf | 30 Nov 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf | 29 Nov 2024 |
| Other - LegalFile: AUTHORISED SIGNATORY.pdf | 27 Nov 2024 |
| Other - FinanceFile: Self Decalration of Regarding land owner shares.pdf | 27 Nov 2024 |
| Copy of the legal title reportFile: SEARCH REPORT_compressed.pdf | 15 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: AVIRAT DEVELOPERS ENCUMRANCE FINANCE.pdf | 15 Nov 2024 |
| Proforma of Allotment letterFile: AVIRAT DEVELOPERS -ALLOTMENT LATTER_compressed.pdf | 15 Nov 2024 |
| Declaration about Commencement CertificateFile: CC Gmail - Fwd.pdf | 15 Nov 2024 |
| Details of encumbrances concerned to LegalFile: AVIRAT DEVELOPERS ENCUMRANCE FINANCE.pdf | 15 Nov 2024 |
| Other - TechnicalFile: AVIRAT DEVELOPERS-ANNEXURE-A Delcaration cum undertaking.pdf | 15 Nov 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: AVIRAT DEVELOPERS- PARTNERS ITRODUCATION ANNEXURE-A.pdf | 15 Nov 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: AVIRAT DEVELOPERS-CA CERTIFICATE UNSEUCRED LOAN BOTH CERTIFICATE.pdf | 15 Nov 2024 |
| Declaration in FORM BFile: 662_2024.pdf | 8 Nov 2024 |
| Building plan approvalFile: PROPOSED AND EXISTING EASEMENT RIGHTS AND PROPOSED EXPANSION (3).pdf | 26 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PROPOSED AND EXISTING EASEMENT RIGHTS AND PROPOSED EXPANSION (3).pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 25 Oct 2024 |
| Declaration about Commencement CertificateFile: Declaration commencement.pdf | 25 Oct 2024 |
| Building plan approvalFile: Sheet 08_08.pdf | 14 Oct 2024 |
| Building plan approvalFile: Sheet 07_08.pdf | 14 Oct 2024 |
| Building plan approvalFile: Sheet 06_08.pdf | 14 Oct 2024 |
| Building plan approvalFile: Sheet 05_08.pdf | 14 Oct 2024 |
| Building plan approvalFile: Sheet 04_08.pdf | 14 Oct 2024 |
| Building plan approvalFile: Sheet 03_08.pdf | 14 Oct 2024 |
| Building plan approvalFile: Sheet 02_08.pdf | 14 Oct 2024 |
| Building plan approvalFile: Sheet 01_01.pdf | 14 Oct 2024 |
| Layout approvalFile: Sheet 01_08.pdf | 14 Oct 2024 |
| PAN CardFile: Avirat Developers PAN.pdf | 14 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: NO INCUMABANCE AND FIANACNE.pdf | 14 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: Sheet 01_08.pdf | 14 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 14 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf | 14 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 01_01.pdf | 14 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 02_08.pdf | 14 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 03_08.pdf | 14 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 04_08.pdf | 14 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 05_08.pdf | 14 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 06_08.pdf | 14 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 07_08.pdf | 14 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheet 08_08.pdf | 14 Oct 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Elegance Residency | Laxmi Nagar Near S B Patil Public School Ravet Pune 412101 | 105 | Completed | Jul 2017 | Late, Jul 2018 |
| Mid Town Phase -1 | Shinde Vasti Ravet Pune 412101 | 104 | Completed | Dec 2014 | Late, May 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 86 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PANOREEVA GREENS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WAHLEKARWADI13,700+ in Pune
Filed coordinates, straight-line distance. 137 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: AVIRAT DEVELOPERS
Avirat Developers has 2 registrations on MahaRERA, including Avirat Pride and PANOREEVA GREENS. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PANOREEVA GREENS is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PANOREEVA GREENS?
The registered promoter entity is AVIRAT DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PANOREEVA GREENS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PANOREEVA GREENS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PANOREEVA GREENS?
The professionals named in the filing: Architect: SHEKHAR KOKANE; Engineer: DINESH BHARAT MANJARE; Chartered Accountant: VAISHALI ROHIDAS GOLE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PANOREEVA GREENS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.