Home / Browse projects / Pune, Maharashtra / PANNA

Registration lapsed No litigation declared Others project

PANNA

By NABAR ASSOCIATES

RG-MH-27537 · RERA P52100045604 · Last updated on MahaRERA portal: 13 Aug 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
1 of 6Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 129 documents Report an error

PANNA is a Others project by NABAR ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100045604 on 26 May 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 24 months from the original filing. 5 of the 6 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NamePANNA
  • TypeOthers
  • Location
    • LAW COLLEGE ROAD
    • ERANDAWANE
    • Kothrud
    • Haveli
    • Pune
    • 411009
  • Pincode411009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100045604
  • ReraGenie IDRG-MH-27537

Builder

  • NameNABAR ASSOCIATES
  • Entity typePartnership
  • PartnersRAHUL RAMESH NABAR, ANJALI RAMESH NABAR
  • Other registrations3 more →
  • Completed2 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredMay 2022First promiseJun 2024Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 May 2022
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed129 files

Current status

83%5 of 6 units booked
270.6%Work done, per cost certificate

Figures as on 13 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PANNANA53606

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

PANNA: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area519 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jul 2025
LandownerVillageDistrict
PANKUWAR FOJMAL BAFNAParvatiPune
NIRMAL FOJMAL BAFNAParvatiPune
SUDHA BAFNA SHARMAPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corpoaration
Permissible FSI1562.0
Proposed, not sanctioned1,505 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKARVE ROAD
Estimated costRs 1.31 cr
Cost incurredRs 3.55 cr
Work done270.6%
BuildingWingEstimatedIncurred
PANNANARs 1.18 crRs 3.52 cr
-NARs 13.11 lakhRs 3.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRI PRAFULLA R NADKARNI
EngineerSUMIT SHIVAJI CHAVAN
EngineerMr Nitin S Miniyar
Chartered AccountantCA PUSHPAK BOGATI
Chartered AccountantBogati & Company
Chartered AccountantSpak and Company
PartnerRole in project
NABAR ASSOCIATES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100024684Jun 2024 → Jun 2025

Reason as filed by the promoterI was planning to expand the project, but there was a delay in receiving the sanction plan from the local authority. This setback has postponed our project timeline as we need the official approval to proceed with the expansion.

EA16072502082Jun 2024 → Jun 2026

Reason as filed by the promoterI was planning to expand the project, but there was a delay in receiving the sanction plan from the local authority. This setback has postponed our project timeline as we need the official approval to proceed with the expansion.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Apr 2024

Documents filed129

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect certificate panna June 26.pdf13 Aug 2026
Withdrawal Update Form 2File: Panna Form 2 jun 26.pdf13 Aug 2026
Withdrawal Update Form 3File: Form 3_Panna_Jun 26_Final.pdf13 Aug 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Panna 31-3-2026.pdf22 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineer certificate panna 31-3-2026.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 panna 31-3-2026.pdf22 Jun 2026
Withdrawal Update Form 1File: Panna Form 1-Dec 25.pdf19 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 31-12-2025.pdf19 Jun 2026
Withdrawal Update Form 3File: Panna Form 3 Dec 2025.pdf19 Jun 2026
Withdrawal Update Form 1File: Panna Form 1- Sept 25.pdf18 Jun 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 30-09-2025.pdf18 Jun 2026
Withdrawal Update Form 3File: Panna Form 3 Sep 2025.pdf18 Jun 2026
Form 2A (FY 2022-2023)File: Form 2A 2023.pdf27 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A 2025.pdf27 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf27 Feb 2026
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf9 Feb 2026
Form 5 (FY 2023-2024)File: Form -5 2023-24.pdf9 Feb 2026
Withdrawal Update Form 1File: panna Archtiect certificate JUNE 2025.pdf21 Nov 2025
Withdrawal Update Form 2File: Panna Form 2 Jun25.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 Panna Jun 25.pdf21 Nov 2025
Form 1File: Archtiect certificate 31-12-2024.pdf20 Nov 2025
Form 2File: Form 2 Engineer Certificate Panna Dec-24.pdf20 Nov 2025
Form 3File: Form 3 Dec 2024.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Panna Sold Disclosure Dec-24.pdf20 Nov 2025
Form 1File: panna Archtiect certificate March 2025.pdf20 Nov 2025
Form 2File: Form 2 Engineer certificate March 2025.pdf20 Nov 2025
Form 3File: Panna Form 3 March 2025.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Panna Sold Disclosure March 2025.pdf20 Nov 2025
Form 1File: Architect certificate Sep 2024.pdf20 Nov 2025
Form 2File: Panna Form-2 Sep-24.pdf20 Nov 2025
Form 3File: Form 3 Sep 2024 Panna.pdf20 Nov 2025
Disclosure of Sold and Booked InventoryFile: Panna Sold Disclosure Sep 2024.pdf20 Nov 2025
Form 1File: Architect certificate 31 march 2024 Panna.pdf19 Nov 2025
Form 2File: Form 2 Engineer certificate March 2024.pdf19 Nov 2025
Form 3File: Panna Form 3 Mar 2024.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Mar 2024 sold inventory panna.pdf19 Nov 2025
Form 1File: Architect certificate 20-6-2022 panna.pdf27 Oct 2025
Form 2File: Form 2 Engineer certificate 30-6-2022.pdf27 Oct 2025
Form 3File: panna Form 3 June 2022.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: June 2022 sold inventory panna.pdf27 Oct 2025
Form 1File: Architect Certificate 7-9-2022 Panna.pdf27 Oct 2025
Form 2File: Form 2 Engineer certificate 30-9-2022.pdf27 Oct 2025
Form 3File: panna Form 3 Sep 2022.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sep 2022 sold inventory panna.pdf27 Oct 2025
Form 1File: Architect certificate 9-12-2022 panna.pdf27 Oct 2025
Form 2File: Form 2 Engineer certificate 31-12-2022.pdf27 Oct 2025
Form 3File: Panna_Dec 2022.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Dec 2022 sold inventory panna.pdf27 Oct 2025
Form 1File: Architect certificate 14-3-2023 panna.pdf27 Oct 2025
Form 2File: Form 2 Engineer certificate 31-3-2023.pdf27 Oct 2025
Form 3File: Panna Form 3 Mar 2023.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Mar 2023 sold inventory panna.pdf27 Oct 2025
Form 1File: Architect certificate 8-6-2023 panna.pdf27 Oct 2025
Form 2File: Form 2 Engineer certificate 30-6-2023.pdf27 Oct 2025
Form 3File: Panna Form 3 June 2023.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: June 2023 sold inventory panna.pdf27 Oct 2025
Form 1File: Architect Certificate 11-9-2023 panna.pdf27 Oct 2025
Form 2File: Form 2 Engineer certificate 30-9-2023.pdf27 Oct 2025
Form 3File: Panna form 3 Sep 2023.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sep 2023 sold inventory panna.pdf27 Oct 2025
Form 1File: Architect Certificate 12-12-2023 Panna.pdf27 Oct 2025
Form 2File: Form 2 ENGINEER CERTIFICATE 31-12-2023.pdf27 Oct 2025
Form 3File: Panna, Form 3 Dec 2023.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: Dec 2023 sold inventory panna.pdf27 Oct 2025
Form 1File: Architect Certificate 30-6-2024 panna.pdf27 Oct 2025
Form 2File: Form 2 Engineer certificate Date- 30-6-2024.pdf27 Oct 2025
Form 3File: Panna Form 3 June 2024.pdf27 Oct 2025
Disclosure of Sold and Booked InventoryFile: June 2024 sold inventory panna.pdf27 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Panna FY_24-25.pdf30 Sep 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mar 2024.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: June 2023 sold inventory panna.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: June 2024 sold inventory panna.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Mar 2024 sold inventory panna.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Dec 2023 sold inventory panna.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Sep 2023 sold inventory panna.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Mar 2023 sold inventory panna.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Dec 2022 sold inventory panna.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: Sep 2022 sold inventory panna.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: June 2022 sold inventory panna.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Sept 2023.pdf30 Nov 2024

How this compares with Pune

83%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PANNA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ERANDAWANE13,700+ in Pune

2 kmPANNACompleted 45Lapsed / revoked 16Other 84Dot size: filed unitsN

Filed coordinates, straight-line distance. 145 registered projects within 2 km.

Builder: NABAR ASSOCIATES

NABAR ASSOCIATES has 4 registrations on MahaRERA, including SHIVANK and SHANKAR HEIGHTS. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that PANNA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PANNA is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PANNA?

The registered promoter entity is NABAR ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PANNA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PANNA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PANNA?

The professionals named in the filing: Architect: SHRI PRAFULLA R NADKARNI; Engineer: SUMIT SHIVAJI CHAVAN; Engineer: Mr Nitin S Miniyar; Chartered Accountant: CA PUSHPAK BOGATI; Chartered Accountant: Bogati & Company; Chartered Accountant: Spak and Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PANNA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PANNA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PANNA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.