PANCHARATNA GULMOHAR

By PANCHARATNA DEVELOPERS AND BUILDERS

RG-MH-10528 · RERA P52100003840 · Last updated on MahaRERA portal: 4 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

PANCHARATNA GULMOHAR is a Others project by PANCHARATNA DEVELOPERS AND BUILDERS in Pune, Maharashtra, registered with MahaRERA as P52100003840 on 6 Aug 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 36 months from the original filing.

At a glance

Project

  • NamePANCHARATNA GULMOHAR
  • TypeOthers
  • Location
    • Shikrapur
    • Shirur
    • Pune
    • 412209
  • Pincode412209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100003840
  • ReraGenie IDRG-MH-10528

Builder

  • NamePANCHARATNA DEVELOPERS AND BUILDERS
  • Entity typePartnership
  • PartnersPANDHARINATH BALASAHEB SABLE, HANUMANT VITTHAL BHUJBAL, HARI NANDKUMAR RATHOD, SANJAY LAXMAN SHIVALE

Key dates

22 months past promisethis monthRegisteredAug 2017First promiseDec 2021Revised toDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Aug 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Dec 2021)
  • Buildings1 building record
  • Documents filed112 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PANCHARATNA GULMOHARNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

PANCHARATNA GULMOHAR: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes90%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed27

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots27
Open Space27

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3029.26
Proposed, not sanctioned3,029 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANDAL COMPLEX SHIKRAPUR

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJIT DILIP MANE
PartnerRole in project
PANCHARATNA DEVELOPERS AND BUILDERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100015047Dec 2021 → Dec 2024

Reason as filed by the promoterIn the current pandemic COVID-19, there has been lockdown at certain intervals declared either by the central government (March 2020 to July 2020) or state government (April 15 2021 to May 31 2021). Due to this, there has been a big challenge for the availability of labour and materials for the construction site. Thus the work of the project has been severally impacted.

EXT52100011122Dec 2021 → Dec 2022

Reason as filed by the promoterAs we all are aware, whole world is facing pandemic of Covid-19 disease since January 2020 and corresponding lockdowns in whole of country. This resulted in outflux of construction manpower and resulting in stoppage of work. The Project was progressing at very slow pace due to that reason only. We are committed for completing the said project in next one year of time. So we request you to kindly allow us extension of time to complete the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Jan 2025

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: june 23.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sept 23.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: dec 23.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: mar 24.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: june 24.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: sept 24.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: dec 24.pdf4 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 2023.pdf4 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: form 4 architect certificate.pdf4 Feb 2025
Certificates of CA (Form 3)File: dec 23.pdf4 Feb 2025
Certificates of CA (Form 3)File: dec24.pdf4 Feb 2025
Certificates of CA (Form 3)File: sept24.pdf4 Feb 2025
Certificates of CA (Form 3)File: june24.pdf4 Feb 2025
Certificates of CA (Form 3)File: march 24.pdf4 Feb 2025
Certificates of CA (Form 3)File: sept 23.pdf4 Feb 2025
Certificates of CA (Form 3)File: June 23.pdf4 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (31-12-2024).pdf4 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (30-09-2024).pdf4 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (30-06-2024).pdf4 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (31-03-2024).pdf4 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (30-09-2023).pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (31-12-2024).pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (30-09-2024).pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (30-06-2024).pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (31-03-2024).pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (31-12-2023).pdf24 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6th Engineer Certificate of Panchratna Gulmohar (Panchratna Developers) (30-06-2023).pdf24 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Owner.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: MARCH 23.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: JUNE23.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: SEP 23.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: DEC 23.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: MARCH 24.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: JUNE 24.pdf14 Jan 2025
Layout approvalFile: Panchratna Revised Sanction Plan-01_compressed.pdf21 Feb 2024
Building plan approvalFile: Panchratna Revised Sanction Plan-02_compressed.pdf21 Feb 2024
Building plan approvalFile: Panchratna Revised Sanction Plan-03_rotated_compressed.pdf21 Feb 2024
Building plan approvalFile: Panchratna Revised Sanction Plan-04_compressed.pdf21 Feb 2024
Building plan approvalFile: Panchratna Revised Sanction Plan-05_compressed.pdf21 Feb 2024
Copy of Layout Approval (in case of layout)File: Panchratna Revised Sanction Plan-01_compressed.pdf21 Feb 2024
Building Plan Approval (IOD)File: Panchratna Revised Sanction Plan-02_compressed.pdf21 Feb 2024
Building Plan Approval (IOD)File: Panchratna Revised Sanction Plan-03_rotated_compressed.pdf21 Feb 2024
Building Plan Approval (IOD)File: Panchratna Revised Sanction Plan-04_compressed.pdf21 Feb 2024
Building Plan Approval (IOD)File: Panchratna Revised Sanction Plan-05_compressed.pdf21 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Panchratna Revised Sanction CC 2024-02-14.pdf21 Feb 2024
Declaration about Commencement CertificateFile: 00 Declaration about commencement (In case of revised commencement) 2.pdf21 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23 Uploaded.pdf25 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 Form 2 Mar22.pdf22 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 Jun22.pdf22 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 Form 2 Sep22.pdf22 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4 Form 2 Dec22.pdf22 Apr 2023
Certificates of CA (Form 3)File: 1 Form 3 Mar22 Com.pdf22 Apr 2023
Certificates of CA (Form 3)File: 2 Form 3 Jun22.pdf22 Apr 2023
Certificates of CA (Form 3)File: 3 Form 3 Sep22.pdf22 Apr 2023
Certificates of CA (Form 3)File: 4 Form 3 Dec22 Com.pdf22 Apr 2023
Proforma of Agreement for saleFile: Model Agreement To Sale.pdf15 Apr 2023
Proforma of Allotment letterFile: Model Allotment Letter.pdf15 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 2020-21 Signed.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Panchratna Form5 2020-21.pdf14 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 2021-22 Signed.pdf14 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHIKRAPUR 1120 Form 1 Architect Certificate Rera 2022-03-28.pdf13 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHIKRAPUR 1120 Form 1 Architect Certificate Rera 2022-06-30.pdf13 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHIKRAPUR 1120 Form 1 Architect Certificate Rera 2022-09-29.pdf13 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SHIKRAPUR 1120 Form 1 Architect Certificate Rera 2022-12-30.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: sold unsold upto 31-03-2022.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: sold unsold 30-06-2022.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: sold unsold 30-09-2022.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold 31-12-2022.pdf13 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Report of allotment latter.pdf7 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Devation report of ATS.pdf7 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate Format Rera.pdf27 Dec 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold as on 30 09 2021 compressed.pdf23 Dec 2021
CERSAI detailsFile: CERSAI Report.pdf22 Dec 2021
Declaration about Commencement CertificateFile: Commensment Certificate.pdf13 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 31 03 2021_compressed.pdf13 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 31 03 2021_compressed.pdf13 Dec 2021
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 20 08 2021_compressed.pdf13 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FY 18-19.pdf13 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 19-20.pdf13 Dec 2021
Certificates of CA (Form 5)File: Form 5.pdf2 Oct 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PANCHARATNA GULMOHAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shikrapur13,700+ in Pune

Builder: PANCHARATNA DEVELOPERS AND BUILDERS

PANCHARATNA DEVELOPERS AND BUILDERS has 1 registration on MahaRERA, including PANCHARATNA GULMOHAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that PANCHARATNA GULMOHAR shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PANCHARATNA GULMOHAR is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PANCHARATNA GULMOHAR?

The registered promoter entity is PANCHARATNA DEVELOPERS AND BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PANCHARATNA GULMOHAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PANCHARATNA GULMOHAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PANCHARATNA GULMOHAR?

The professionals named in the filing: Architect: AJIT DILIP MANE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PANCHARATNA GULMOHAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PANCHARATNA GULMOHAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PANCHARATNA GULMOHAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.