Home / Browse projects / Pune, Maharashtra / Aapla Ghar Sanaswadi Phase III 1
Aapla Ghar Sanaswadi Phase III 1
RG-MH-20776 · RERA P52100007230 · Last updated on MahaRERA portal: 3 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 13 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Aapla Ghar Sanaswadi Phase III 1 is a Others project by Maple City Developers in Pune, Maharashtra, registered with MahaRERA as P52100007230 on 17 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 13 complaints are on record with the regulator.
At a glance
Project
- NameAapla Ghar Sanaswadi Phase III 1
- TypeOthers
- Location
- Dingrajwadi
- Shirur
- Pune
- 412209
- Pincode412209
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100007230
- ReraGenie IDRG-MH-20776
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Aug 2017
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings6 building records
- Documents filed49 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | NA | 8 | 0 | 0 | 0 | 0 |
| B | NA | 6 | 0 | 0 | 0 | 0 |
| proposed | NA | 0 | 0 | 0 | 0 | 0 |
| Proposed | NA | 0 | 0 | 0 | 0 | 0 |
| E | NA | 5 | 0 | 0 | 0 | 0 |
| Amenity F wing | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 99%.
A78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
B56%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
proposed39%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 20% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 10% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Proposed0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 99% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Amenity F wing22%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 70% |
| Podiums (if any) | 0% |
| Plinth | 70% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 60% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 50% |
| Solid Waste Management And Disposal | Yes | 50% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A | 12 | 12 |
| B | 12 | 12 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Astrix Infrastructure | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Parvez Jamadar and Associates |
| Engineer | Hansal Parikh & Associates |
| Partner | Role in project |
|---|---|
| Maple City Developers | - |
Complaints filed with MahaRERA13
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000011464 | Maple City Developers through its Partner Sachin A Agarwal | Mr Kishor Takuji Kamble | 30/04/2018 |
| CC005000000011836 | Vinod Manik Zende | M/s Maple City Developers through its partner Mr. Sachin Agarwal | 25/07/2018 |
| CC005000000022243 | Mohaneshwar Basavraj Inde | M/s Maple City Developers through its partner Mr. Sachin Ashok Agarwal | 16/11/2018 |
| CC005000000043645 | Vijay Nandanwar | M/s Maple City Developers through its partner Sachin Agarwal | 30/12/2019 |
| CC005000000064684 | Shrikant Birajdar | M/s Maple City Developers | 03/10/2020 |
| CC005000000064870 | (1)MR. PRAVIN DNYANDEO KOLTE (2) MRS. DIPALI PRAVIN KOLTE. | Aapla Ghar Sanaswadi Phase III | 03/12/2020 |
| CC005000000095818 | Vishal Ashok Hanmante | M/S mapel city developer | 03/08/2021 |
| CC005000000238757 | Chandrakant Parshuram Bhosale | Sachin Ashok Agarwal and Nitin Shah | 04/05/2023 |
| CC005000000269502 | Annie Shaiju Thomas | M/s. Maple City Developers | 28/09/2023 |
| CC005000000269505 | Shiny Geju Veeramana | M/s Maple City Developers | 28/09/2023 |
| CC12501897 | Maple City Developers | Mr Vijay Dasbhai Parmar | 10/06/2025 |
| CC12501896 | Maple City Developers | Mr Mahesh Dasbhai Parmar | 10/06/2025 |
| CC12503009 | SUNIL MACHINDRA BORATE | Maple City Developers | 26/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 3 Dec 2024
Documents filed49
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form4 sanaswadi.pdf | 3 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sanaswadi Phase III F amenity completion certificate.pdf | 3 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate.pdf | 22 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: sold unsold list.pdf | 22 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 31 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 31 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Certificate.pdf | 31 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance certificate Sanaswadi.pdf | 31 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf | 31 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 31 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold List.pdf | 7 Dec 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sanaswadi Phase III ABE completion certificate.pdf | 7 Dec 2023 |
| Other - TechnicalFile: Sanaswadi Phase III F amenity completion certificate.pdf | 7 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MCD SANASWADI ARCH CERTIFICATE.pdf | 25 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate Sanaswadi.pdf | 25 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MCD SANASWADI ENGG CERTIFICATE_.pdf | 25 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate sanaswadi.pdf | 25 Oct 2023 |
| Certificates of CA (Form 3)File: FORM 3 sanaswadi.pdf | 25 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Sanaswadi Jan 2023.pdf | 10 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Sanaswadi Jan 2023.pdf | 10 Feb 2023 |
| Certificates of CA (Form 3)File: MCD Sanaswadi.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: MCD Sanaswadi 2018-2019.pdf | 10 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: MCD Sananwadi 2019-2020.pdf | 9 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: MCD Sananwadi 2020-2021.pdf | 9 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: MCD Sananwadi 2021-2022.pdf | 9 Feb 2023 |
| Form 2AFile: Form 2A Sanaswadi.pdf | 30 Jul 2019 |
| Certificates of CA (Form 5)File: Maple city developers.pdf | 30 Sep 2018 |
| OtherFile: Maple City Developers.pdf | 29 Sep 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: C C PMRDA 175-176 1.pdf | 6 Mar 2018 |
| OtherFile: Plinth checking A B E.pdf | 6 Mar 2018 |
| OtherFile: Plinth Ph 3 C BLDG.pdf | 6 Mar 2018 |
| Layout approvalFile: sanaswadi.pdf | 31 Jul 2017 |
| Building plan approvalFile: Amenity Building F Wing.pdf | 31 Jul 2017 |
| Copy of the legal title reportFile: Sanasawdi title.pdf | 31 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: sanaswadi.pdf | 31 Jul 2017 |
| Building Plan Approval (IOD)File: Amenity Building F Wing.pdf | 31 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sanaswadi architect certificate.pdf | 31 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sanaswadi Engineer Certificate.pdf | 31 Jul 2017 |
| Building plan approvalFile: sanaswadi phase 3.pdf | 30 Jul 2017 |
| Layout approvalFile: SANASWADI PHASE 3.pdf | 30 Jul 2017 |
| Details of encumbrancesFile: sanaswadi SRO intimation (1).pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: SANASWADI PHASE 3.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: sanaswadi phase 3.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: Maple City Developers_002.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: Document_0001.pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: Allotment letter Draft.pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: SANSWADI RERA DRAFT.pdf | 30 Jul 2017 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Aapla Ghar Sananswadi Phase II | Gat No 181 and 182 | 288 | Completed | Sep 2018 | Jul 2017 |
| Aapla Ghar Ranjangaon Phase I | GAt No 986 At Village Ranjangaon Taluka Shirur District Pune | 120 | Completed | Mar 2017 | Mar 2017 |
| Aapla Ghar Sananswadi Phase I | Gat No 165 At Village Dingrajwadi Taluka Shirur District Pune | 240 | Completed | Apr 2015 | Late, Sep 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 49 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Aapla Ghar Sanaswadi Phase III 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dingrajwadi13,700+ in Pune
Aapla Ghar Ranjangaon Phase II
Maple City Developers
Pinnacle City Phase 1
Amegh SKS Realty LLP
Gulmohar City
Gulmohar City
ASHTAVINAYAK NAGAR
SHAHSHIKANT ZUMBARLAL KATARIYA
PANCHARATNA GULMOHAR
PANCHARATNA DEVELOPERS AND BUILDERS
SAISHA PHASE 1
SHOOLIN TOWNSHIPS PRIVATE LIMITED
Builder: Maple City Developers
Maple City Developers has 3 registrations on MahaRERA, including Aapla Ghar Talegaon Dhamdhere Phase I and Aapla Ghar Sanaswadi Phase III 1. Its filings disclose 8 earlier MahaRERA projects: declares 5 of 8 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Aapla Ghar Sanaswadi Phase III 1 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Aapla Ghar Sanaswadi Phase III 1 is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Aapla Ghar Sanaswadi Phase III 1?
The registered promoter entity is Maple City Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Aapla Ghar Sanaswadi Phase III 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Aapla Ghar Sanaswadi Phase III 1?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Aapla Ghar Sanaswadi Phase III 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Aapla Ghar Sanaswadi Phase III 1?
The professionals named in the filing: Architect: Parvez Jamadar and Associates; Engineer: Hansal Parikh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Aapla Ghar Sanaswadi Phase III 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback