Completed No litigation declared Residential / Group Housing project

Pancham Phase I at Nanded City

By Nanded City Development & Construction Co. Ltd.

RG-MH-01933 · RERA P52100000385 · Last updated on MahaRERA portal: 25 Aug 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 19 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 20 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2019Possession promisedregistration recorded completed
12 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 95%
0Complaints at MahaRERAon this registration
Jump to the 27 documents Report an error

Pancham Phase I at Nanded City is a Residential / Group Housing project by Nanded City Development & Construction Co. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100000385 on 15 Jul 2017. The registration is recorded completed; possession was promised by 31 Oct 2019.

At a glance

Project

  • NamePancham Phase I at Nanded City
  • TypeResidential / Group Housing
  • Location
    • Nanded City Main Road
    • Nanded City
    • Nanded
    • Haveli
    • Pune
    • 411068
  • Pincode411068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000385
  • ReraGenie IDRG-MH-01933

Builder

  • NameNanded City Development & Construction Co. Ltd.
  • Entity typeCompany
  • GSTIN27AACCN2613H1ZQ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorSatish Dattatray Magar
  • Other registrations20 more →
  • Completed12 of 21
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects22 →

Key dates

this monthRegisteredJul 2017PromisedOct 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2017
  • Promised completion31 Oct 2019
  • Revised completionNone
  • Buildings2 building records
  • Documents filed27 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA340000
BNA340000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 95%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities28

As on 25 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes50%
Street LightingYes60%
Community BuildingsYes97%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes20%
Fire protection and fire safety requirementsYes85%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes97%
Open ParkingYes0%
Town level Primary and High Schools ICSE and CBSE BoardYes100%
Town level Public Assembly Facility like AmphitheatreYes100%
Town level restricted facilities like Swimming Pool Tennis Courts Gymnasium Skating Rink Badminton CYes100%
Town Level Roads Jogging Cycling Tracks Footpath as per Proposed Land Use PlanYes86%
Town level Community MarketYes100%
Open Play Courts on PodiumYes0%
Play area with play equipmentsYes0%
Town level playgrounds excluding School PlaygroundYes0%
Town level Gardens and ParksYes100%
Prepaid meters for water and electricityYes0%
Town level exclusive Fire Fighting StationYes100%
Town level 24x7 Centralized Security System with CCTV CoverageYes100%
Town level Community Health Care FacilityYes0%

Parking filed496

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots496
Closed/Covered416
Open Space80
BuildingClosed/CoveredOpen SpaceTotal
A20840248
B20840248

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,163 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI29260.0
Proposed, not sanctioned29,260 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch13 Solapur Bazaar Road Off East Street Pulgate Pune 411 001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch Malay Deshmukh
ArchitectArch Prakash Deshmukh
EngineerMr Achyut Watve
Chartered AccountantD R Barve & Co
Chartered AccountantSDB & Company
PartnerRole in project
Nanded City Development & Construction Co. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Jan 2020

Documents filed27

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf25 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate.pdf6 Jan 2020
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf6 Jan 2020
Certificates of Architect (Form 4)File: Form 4 - Architects Certificate.pdf9 May 2019
OtherFile: Occupation Certificate.pdf9 May 2019
Certificates of CA (Form 5)File: Form 5 - Annual Report on Statement of Accounts.pdf29 Sep 2018
Proforma of Allotment letterFile: PANCHAM I - Agreement.pdf29 Mar 2018
Copy of the legal title reportFile: Search Reports -Pancham I.pdf19 Aug 2017
Declaration in FORM BFile: Notarized Affidavit- Pancham I.pdf19 Aug 2017
Proforma of Allotment letterFile: Allotment Letter AND Agreement.pdf19 Aug 2017
PAN CardFile: PAN Card- NCDCCL.pdf8 Jul 2017
Copy of the legal title reportFile: Search Reports- Pancham-I.pdf8 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate Pancham-I.pdf8 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC Pancham Rev I.pdf8 Jul 2017
Declaration in FORM BFile: Affidavit Pacham I.pdf8 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ArchitectCertificate- Pancham Phase I.pdf8 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf8 Jul 2017
Certificates of CA (Form 3)File: CA Certificate- Pancham-I .pdf8 Jul 2017
Proforma of Allotment letterFile: Agreement -Pancham Phase I.pdf8 Jul 2017
Layout approvalFile: Pancham Layout plan RERA.pdf6 Jul 2017
Building plan approvalFile: Pancham First Floor Plan.pdf6 Jul 2017
Building plan approvalFile: Pancham Floor Plan a.pdf6 Jul 2017
Building plan approvalFile: Pancham Floor Plan b.pdf6 Jul 2017
Copy of Layout Approval (in case of layout)File: Pancham Layout plan RERA.pdf6 Jul 2017
Building Plan Approval (IOD)File: Pancham First Floor Plan.pdf6 Jul 2017
Building Plan Approval (IOD)File: Pancham Floor Plan a.pdf6 Jul 2017
Building Plan Approval (IOD)File: Pancham Floor Plan b.pdf6 Jul 2017

Promoter's earlier projects22

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

19 delivered on promise3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Aalaap - I at Nanded CityP52100055134Nanded Phata, Pune936Mar 2024OngoingDec 2027Not due yet
Destination Center - IIP52100079788Nanded Phata, Pune56Mar 2025OngoingDec 2026Not due yet
Bahaar at Nanded CityP52100049984Nanded Phata, Pune608Mar 2023OngoingDec 2026Not due yet
Janaranjani - D Phase II at Nanded CityP52100047078Nanded Phata, Pune-Sep 2022CompletedDec 2025Apr 2025
Sur at Nanded CityP52100032686Nanded Phata, Pune-Jan 2022CompletedAug 2025Apr 2025
Rhythm III at Nanded CityP52100028650Nanded Phata, Pune121Mar 2021Certificate SignedSep 2024Feb 2024
Rhythm II at Nanded CityP52100028623Nanded Phata, Pune87Mar 2021Certificate SignedSep 2024Feb 2024
Rhythm I at Nanded CityP52100028606Nanded Phata, Pune79Mar 2021Certificate SignedSep 2024Feb 2024
Kalashree at Nanded CityP52100021483Nanded Phata, Pune-Jul 2019Certificate SignedMay 2023Dec 2022
Bageshree at Nanded CityP52100021465Nanded Phata, Pune-Jul 2019Certificate SignedMay 2023Dec 2022
Pancham Phase II at Nanded CityNanded City Sinhagad Road Pune 411068496-CompletedApr 2021Jan 2021
Janaranjani 5B at Nanded CityNanded City Sinhagad Road Pune 411068540-CompletedNov 2020Jun 2020
Pancham Phase I at Nanded CityNanded City Sinhagad Road Pune 411068496-CompletedOct 2019Apr 2019
Janaranjani 5A at Nanded CityNanded City Sinhagad Road Pune 411068540-CompletedAug 2019Aug 2019
Sargam at Nanded CityNanded City Sinhagad Road Pune 4110681,736-CompletedMar 2019Jul 2018
Madhuvanti at Nanded CityNanded City Sinhagad Road Pune 4110681,012-CompletedAug 2016Mar 2016
Mangal Bhairav at Nanded CityNanded City Sinhagad Road Pune 4110681,672-CompletedDec 2015Oct 2015
Sarang at Nanded CityNanded City Sinhagad Road Pune 4110681,144-CompletedNov 2015Oct 2015
Asawari at Nanded CityNanded City Sinhagad Road Pune 4110681,936-CompletedOct 2015Aug 2015
Shubhkalyan at Nanded CityNanded City Sinhagad Road Pune 411068528-CompletedSep 2015Mar 2015
Lalit at Nanded CityNanded City Sinhagad Road Pune 411068792-CompletedApr 2015Dec 2014
Destination Center I at Nanded CityNanded City Sinhagad Road Pune 411068272-CompletedApr 2015Mar 2015

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pancham Phase I at Nanded City on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nanded City13,700+ in Pune

2 kmPancham Phase I at NandeCompleted 19Lapsed / revoked 20Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 65 registered projects within 2 km.

Builder: Nanded City Development & Construction Co. Ltd.

Nanded City Development & Construction Co. Ltd. has 21 registrations on MahaRERA, including Sargam at Nanded City and Pancham Phase I at Nanded City. Its filings disclose 22 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Pancham Phase I at Nanded City is delayed beyond 31 Oct 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pancham Phase I at Nanded City?

The registered promoter entity is Nanded City Development & Construction Co. Ltd., a company as per the filing. Its GSTIN 27AACCN2613H1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pancham Phase I at Nanded City?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pancham Phase I at Nanded City?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pancham Phase I at Nanded City?

The professionals named in the filing: Architect: Arch Malay Deshmukh; Architect: Arch Prakash Deshmukh; Engineer: Mr Achyut Watve; Chartered Accountant: D R Barve & Co; Chartered Accountant: SDB & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pancham Phase I at Nanded City?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pancham Phase I at Nanded City. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pancham Phase I at Nanded City to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.