Home / Browse projects / Pune, Maharashtra / Saajgiri

Registered No litigation declared Residential / Group Housing project

Saajgiri

By Nanded City Development & Construction Co. Ltd.

RG-MH-32793 · RERA PR1260002501621 · Last updated on MahaRERA portal: 9 Apr 2026

Source: official MahaRERA filing

Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • All 19 completed earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2029Possession promisedno revision filed
8 of 80Construction stages doneacross 8 buildings; furthest along: Podiums (if any), 0%
303 of 648Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 28 documents Report an error

Saajgiri is a Residential / Group Housing project by Nanded City Development & Construction Co. Ltd. in Pune, Maharashtra, registered with MahaRERA as PR1260002501621 on 28 Nov 2025. Possession is promised by 31 Aug 2029. 345 of the 648 units on this registration are recorded sold or booked, and 8 of 80 construction stages are filed complete.

At a glance

Project

  • NameSaajgiri
  • TypeResidential / Group Housing
  • Location
    • Sinhagad Road
    • Nanded Phata
    • Nanded
    • Haveli
    • Pune
    • 411068
  • Pincode411068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002501621
  • ReraGenie IDRG-MH-32793

Builder

  • NameNanded City Development & Construction Co. Ltd.
  • Entity typeCompany
  • GSTIN27AACCN2613H1ZQ
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorSatish Dattatray Magar
  • Wholetime DirectorUmesh Magar
  • DirectorsYogesh Martand Magar, Shirish Murlidhar Magar, Abasaheb Arjun Magar, Vaijukumar Pundalik Ghule, Abhijit Vikramrao Jadhavrao
  • Additional DirectorChetan Vyankatesh Lagad
  • Other registrations20 more →
  • Completed12 of 21
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects22 →

Key dates

this monthRegisteredNov 2025PromisedAug 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2025
  • Promised completion31 Aug 2029
  • Revised completionNone
  • Buildings8 building records
  • Documents filed28 files

Current status

53%345 of 648 units booked
19.6%Work done, per cost certificate

Figures as on 9 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA201872072
BNA201872072
CNA201872072
DNA201872072
ENA20181080108
FNA20181080108
GNA201872072
HNA201872072

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 9 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 80 construction stages are filed complete across 8 buildings. The stage furthest along is Podiums (if any), at 0%.

A10%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B10%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C10%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D10%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
E10%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
F10%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
G10%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
H10%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNo0%

Parking filed2214

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2,214
Closed/Covered2,148
Open Space66
BuildingClosed/CoveredOpen SpaceTotal
A28610296
B2868294
C2868294
D2868294
E2168224
F2168224
G2868294
H2868294

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area33,765 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Apr 2026

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority Pune
Permissible FSI98809.06
Proposed, not sanctioned97,885 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch13, SHOLAPUR BAZAR ROAD, POLGATE, PUNE-411001 MAHARASHTRA
Estimated costRs 433.66 cr
Cost incurredRs 85.02 cr
Work done19.6%
BuildingWingEstimatedIncurred
ANARs 50.52 crRs 6.94 cr
BNARs 50.52 crRs 6.94 cr
CNARs 50.52 crRs 6.94 cr
DNARs 50.52 crRs 6.94 cr
ENARs 50.52 crRs 6.94 cr
FNARs 50.52 crRs 6.94 cr
GNARs 50.52 crRs 6.94 cr
HNARs 50.52 crRs 6.94 cr
-NARs 29.48 crRs 29.48 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAssociated Space Designers
EngineerJW Consultants LLP
EngineerPrashant Kanikdale
EngineerVishwas Bhandurge
EngineerPratik Magar
Chartered AccountantD R B S V & Associates
Chartered AccountantSDB & Company
PartnerRole in project
Nanded City Development & Construction Co. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jun 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jun 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Aug 2029

Documents filed28

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - March 2026.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2 - March 2026.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3 - March 2026.pdf9 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A - March 2026.pdf3 Apr 2026
Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf16 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 - Dec 2025.pdf16 Jan 2026
Declaration and undertaking (Annexure A)File: Annexure A - Declaration cum Undertaking.pdf14 Oct 2025
Layout approvalFile: 1-20.pdf6 Jun 2025
Building plan approvalFile: 2-20.pdf6 Jun 2025
Building plan approvalFile: 3-20.pdf6 Jun 2025
Building plan approvalFile: 4-20.pdf6 Jun 2025
Building plan approvalFile: 5-20.pdf6 Jun 2025
Building plan approvalFile: 6-20.pdf6 Jun 2025
Building plan approvalFile: 7-20.pdf6 Jun 2025
Building plan approvalFile: 8-20.pdf6 Jun 2025
Building plan approvalFile: 9-10.pdf6 Jun 2025
Building plan approvalFile: 10-20.pdf6 Jun 2025
Building plan approvalFile: 11-20.pdf6 Jun 2025
Building plan approvalFile: 12-20.pdf6 Jun 2025
Building plan approvalFile: 13-20.pdf6 Jun 2025
Building plan approvalFile: 14-20.pdf6 Jun 2025
Building plan approvalFile: 15-20.pdf6 Jun 2025
Building plan approvalFile: 16-20.pdf6 Jun 2025
Building plan approvalFile: 17-20.pdf6 Jun 2025
Building plan approvalFile: 18-20.pdf6 Jun 2025
Building plan approvalFile: 19-20.pdf6 Jun 2025
Building plan approvalFile: 20-20.pdf6 Jun 2025

Promoter's earlier projects22

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

19 delivered on promise3 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Aalaap - I at Nanded CityP52100055134Nanded Phata, Pune936Mar 2024OngoingDec 2027Not due yet
Destination Center - IIP52100079788Nanded Phata, Pune56Mar 2025OngoingDec 2026Not due yet
Bahaar at Nanded CityP52100049984Nanded Phata, Pune608Mar 2023OngoingDec 2026Not due yet
Janaranjani - D Phase II at Nanded CityP52100047078Nanded Phata, Pune-Sep 2022CompletedDec 2025Apr 2025
Sur at Nanded CityP52100032686Nanded Phata, Pune-Jan 2022CompletedAug 2025Apr 2025
Rhythm III at Nanded CityP52100028650Nanded Phata, Pune121Mar 2021Certificate SignedSep 2024Feb 2024
Rhythm II at Nanded CityP52100028623Nanded Phata, Pune87Mar 2021Certificate SignedSep 2024Feb 2024
Rhythm I at Nanded CityP52100028606Nanded Phata, Pune79Mar 2021Certificate SignedSep 2024Feb 2024
Kalashree at Nanded CityP52100021483Nanded Phata, Pune-Jul 2019Certificate SignedMay 2023Dec 2022
Bageshree at Nanded CityP52100021465Nanded Phata, Pune-Jul 2019Certificate SignedMay 2023Dec 2022
Pancham Phase II at Nanded CityNanded City Sinhagad Road Pune 411068496-CompletedApr 2021Jan 2021
Janaranjani 5B at Nanded CityNanded City Sinhagad Road Pune 411068540-CompletedNov 2020Jun 2020
Pancham Phase I at Nanded CityNanded City Sinhagad Road Pune 411068496-CompletedOct 2019Apr 2019
Janaranjani 5A at Nanded CityNanded City Sinhagad Road Pune 411068540-CompletedAug 2019Aug 2019
Sargam at Nanded CityNanded City Sinhagad Road Pune 4110681,736-CompletedMar 2019Jul 2018
Madhuvanti at Nanded CityNanded City Sinhagad Road Pune 4110681,012-CompletedAug 2016Mar 2016
Mangal Bhairav at Nanded CityNanded City Sinhagad Road Pune 4110681,672-CompletedDec 2015Oct 2015
Sarang at Nanded CityNanded City Sinhagad Road Pune 4110681,144-CompletedNov 2015Oct 2015
Asawari at Nanded CityNanded City Sinhagad Road Pune 4110681,936-CompletedOct 2015Aug 2015
Shubhkalyan at Nanded CityNanded City Sinhagad Road Pune 411068528-CompletedSep 2015Mar 2015
Lalit at Nanded CityNanded City Sinhagad Road Pune 411068792-CompletedApr 2015Dec 2014
Destination Center I at Nanded CityNanded City Sinhagad Road Pune 411068272-CompletedApr 2015Mar 2015

How this compares with Pune

53%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Saajgiri on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nanded Phata13,700+ in Pune

2 kmSaajgiriCompleted 17Lapsed / revoked 21Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 58 registered projects within 2 km.

Builder: Nanded City Development & Construction Co. Ltd.

Nanded City Development & Construction Co. Ltd. has 21 registrations on MahaRERA, including Sargam at Nanded City and Pancham Phase I at Nanded City. Its filings disclose 22 earlier MahaRERA projects: declares 19 of 19 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Saajgiri is delayed beyond 31 Aug 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Saajgiri?

The registered promoter entity is Nanded City Development & Construction Co. Ltd., a company as per the filing. Its GSTIN 27AACCN2613H1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Saajgiri?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Saajgiri?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Saajgiri?

The professionals named in the filing: Architect: Associated Space Designers; Engineer: JW Consultants LLP; Engineer: Prashant Kanikdale; Engineer: Vishwas Bhandurge; Engineer: Pratik Magar; Chartered Accountant: D R B S V & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Saajgiri?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Saajgiri. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Saajgiri to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.