Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 6 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
9 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 96%
2 of 80Units unsoldnot recorded sold or booked
6Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Palmrose A is a Residential / Group Housing project by Hillview Ventures in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51900000047 on 18 Jun 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 78 of the 80 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 6 complaints are on record with the regulator.

At a glance

Project

  • NamePalmrose A
  • TypeResidential / Group Housing
  • Location
    • MIDC Road No 16
    • Andheri East
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900000047
  • ReraGenie IDRG-MH-07776

Builder

  • NameHillview Ventures
  • Entity typePartnership
  • PartnersRushank Vyomesh Shah, Kushal Hemant Shah, Khilen Vyomesh Shah, Aakash Atul Patel
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredJun 2017PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Jun 2017
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed89 files

Current status

98%78 of 80 units booked
95.2%Work done, per cost certificate

Figures as on 6 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Palmrose ANA9980080

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 96%.

Palmrose A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises96%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 6 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Mechanical ParkingYes0%
Club HouseYes80%

Parking filed29

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots29
Closed/Covered9
Open Space20

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area526 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jun 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3197.66
Proposed, not sanctioned2,970 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIDC, Andheri East, Mumbai
Estimated costRs 16.70 cr
Cost incurredRs 15.89 cr
Work done95.17%
BuildingWingEstimatedIncurred
Palmrose ANARs 13.70 crRs 13.04 cr
-NARs 3.00 crRs 2.85 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectParin Shah Architects
ArchitectMaya Vaidya
EngineerRoshan Ray
EngineerShoaib Dalvi
EngineerRajeevan Paramban
Chartered AccountantJ SANGANl & ASSOCIATES
Chartered AccountantDoshi & Doshi Associates
Chartered AccountantSanket R. Shah & Associates
PartnerRole in project
Hillview Ventures-

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000334079Hillary Edward BrittoHill View Ventures24/01/2023
CC006000000344186Rajendra Kumar DangiHill View Ventures10/02/2023
CC006000000364589Vijay NairHill View Ventures03/03/2023
CC006000000591431David William FernandesHILL VIEW VENTURES07/08/2024
CC006000000397202RAKESH CHAVANHILL VIEW VENTURES30/08/2023
CC12401174PRAJAKTA / PARESH KISHOR MHATREHillview Ventures19/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 May 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Sep 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: FORM - 5 PALMROSE A WING (1).pdf6 Oct 2025
Form 1File: Arch Certificate - Palmrose A wing_June 25.pdf13 Aug 2025
Form 2File: Engg Certificate_Palmrose A Wing_June 25.pdf13 Aug 2025
Form 3File: Form III_Palmrose A wing_June 25.pdf13 Aug 2025
Disclosure of Sold and Booked InventoryFile: Palmrose-A.pdf13 Aug 2025
Form 1File: P51900000047 - PalmRose_A wing_June 25.pdf30 Jul 2025
Form 2File: Engineering Certificate Palmrose A wing.pdf30 Jul 2025
Form 3File: Form III_Palmrose A wing_June 25.pdf30 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclousre of Sold-booked inventory_June 25.pdf30 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000047 - PalmRose ( Wing - A Phase - I) MIDC pocket - 6 (2).pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Wing A.pdf28 Apr 2025
Certificates of CA (Form 3)File: Revised CA form 3_Mar 25_Palmrose A wing.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000047 - PalmRose ( Wing - A Phase - I) MIDC pocket - 6 (1).pdf30 Jan 2025
Certificates of CA (Form 3)File: PALMROSE A HAVING (3)_compressed.pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Palmrose A wing.pdf30 Jan 2025
Certificates of CA (Form 3)File: CA Certificate_Palmrose A wing _ Sept 24.pdf10 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE -A WING (1).pdf10 Dec 2024
Certificates of CA (Form 5)File: FORM 5 -PALMROSE AS WING (1).pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE -PALMROSE A WING JUN 24.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 -PALMROSE AS WING (1).pdf5 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000047 - PalmRose ( Wing - A Phase - I) MIDC pocket - 6.pdf23 Oct 2024
Certificates of CA (Form 3)File: PALMROSE A HAVING (2).pdf6 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000047 - PalmRose ( Wing - A Phase - I) pocket - 6.pdf22 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000047 - Palmrose Phase I - Wing A (1).pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Palmrose wing A (1).pdf18 Jun 2024
Certificates of CA (Form 3)File: PALMROSE A HAVING (2).pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palmrose wing A.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CERTIFICATE HILLVIEW VENTURE Wing A.pdf5 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE PALMROSE - A WING (1).pdf5 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000047 - Palmrose Phase I - Wing A.pdf30 Jan 2024
Certificates of CA (Form 3)File: PALMROSE A HAVING.pdf23 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000047 - Palmrose Phase I - Wing A.pdf8 Jan 2024
Certificates of CA (Form 3)File: Hillview Form-3 (A Wing)-Sep-23 (1)_compressed.pdf8 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Palmrose A wing_Form 5_FY 22-23.pdf12 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palmrose A_Engg Certificate_June 23.pdf14 Aug 2023
Certificates of CA (Form 3)File: FORM III - PALMROSE A_June 23.pdf14 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000047 - Palmrose Phase I - Wing A.pdf12 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51900000047 - Palmrose Phase I - Wing A.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Palmrose A_Dec 22.pdf1 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Palmrose Wing A.pdf1 Apr 2023
Certificates of CA (Form 5)File: CA form 5 A Wing.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA form 5 A Wing.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5-19-20.pdf2 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERING CERTIFICATE Palmrose A wing Sep 22.pdf8 Dec 2022
Certificates of CA (Form 3)File: Form-III-Hill View Ventures A-September 2022 (1)_compressed.pdf6 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form I_Palmrose A Wing_Sept 22.pdf10 Oct 2022
Certificates of CA (Form 3)File: Palmrose - A_compressed.pdf20 Sep 2022
Certificates of CA (Form 3)File: Palmrose A RERA FORM III_compressed.pdf5 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate_Palmrose Wing A - Phase 1_June 22.pdf11 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Palmrose A Wing_Form 5_Mar 21.pdf22 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Palmrose Phase l.pdf7 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Cert_Palmrose_A_Dec 21_0001.pdf17 Jan 2022
Certificates of CA (Form 5)File: Form V_Palmrose A Wing_Mar 21.pdf2 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form V_Palmrose A Wing_Mar 21.pdf2 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palmrose A Wing June-21_compressed.pdf30 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Palmrose A Wing Sept-21_compressed.pdf30 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginners Certificate Wing A Mar 21_compressed.pdf20 Nov 2021
Certificates of CA (Form 3)File: RERA Certificate (Form III) (Mar 21) - Palmrose A_compressed.pdf20 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Palmrose_Wing A_30 09 2021.pdf8 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 05 MIDC Palmrose wing A architect certificate-3112020 Vishal 010221.pdf2 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PALMROSE WING A 31 MARCH 2020.pdf30 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Hilview A wing.pdf30 Nov 2020
Certificates of CA (Form 3)File: RERA Certificate (Form III) (Mar 20) - Palmrose A.pdf30 Nov 2020
Certificates of CA (Form 5)File: Form 5 - Palmrose A wing.pdf30 Nov 2020
Certificates of CA (Form 3)File: RERA Certificate (Form III) (Mar 20) - Palmrose A.pdf30 Oct 2020
Certificates of CA (Form 5)File: Form 5 - Palmrose A wing.pdf30 Oct 2020
Details of Restarting of Construction work post lockdownFile: Palmrose A.pdf30 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Hill View Venture Form 5- A Wing.pdf11 Dec 2019
Building plan approvalFile: IOD 260419.pdf17 May 2019
Building Plan Approval (IOD)File: IOD 260419.pdf17 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PALMROSE A WING JAN TO MARCH 2019.pdf4 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Palmrose A wing.pdf7 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PALMROSE WING-A RERA UPDATE-OCT-DEC-2018.pdf7 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Palmrose A wing.pdf15 Dec 2018
Certificates of CA (Form 3)File: Form 3 - Palmrose A Wing uploading.pdf15 Dec 2018
Certificates of CA (Form 5)File: Form 5 - Palmrose A Wing - 2018.pdf15 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: CC letter 21042015.pdf20 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Palmrose A wing.pdf26 Mar 2018
OtherFile: Sample Agreement - Palmrose.pdf22 Nov 2017
Details of encumbrancesFile: NEC.pdf14 Jun 2017

How this compares with Mumbai Suburban

98%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Palmrose A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri East6,700+ in Mumbai Suburban

2 kmPalmrose ACompleted 112Lapsed / revoked 56Other 75Dot size: filed unitsN

Filed coordinates, straight-line distance. 243 registered projects within 2 km.

Builder: Hillview Ventures

Hillview Ventures has 2 registrations on MahaRERA, including Palmrose A and Palmrose B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Palmrose A shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Palmrose A is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Palmrose A?

The registered promoter entity is Hillview Ventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Palmrose A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Palmrose A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Palmrose A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Palmrose A?

The professionals named in the filing: Architect: Parin Shah Architects; Architect: Maya Vaidya; Engineer: Roshan Ray; Engineer: Shoaib Dalvi; Engineer: Rajeevan Paramban; Chartered Accountant: J SANGANl & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Palmrose A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Palmrose A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Palmrose A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.