PALM CITY

By ALSAN INDIA DEVELOPERS PRIVATE LIMITED

RG-MH-46752 · RERA P52200081107 · Last updated on MahaRERA portal: 23 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Ahmednagar registration emailed to you, free during the pilot beta.
Oct 2029Possession promisedno revision filed
5 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 50%
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

PALM CITY is a Others project by ALSAN INDIA DEVELOPERS PRIVATE LIMITED in Ahmednagar, Maharashtra, registered with MahaRERA as P52200081107 on 12 Mar 2026. Possession is promised by 31 Oct 2029.

At a glance

Project

  • NamePALM CITY
  • TypeOthers
  • Location
    • RASANE NAGAR
    • NEAR KUSHTADHAM
    • SAVEDI
    • AHMEDNAGAR
    • Ahmadnagar (M Corp.)
    • Nagar
    • Ahmednagar
    • 414003
  • Pincode414003
  • RERA no.P52200081107
  • ReraGenie IDRG-MH-46752

Builder

  • NameALSAN INDIA DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany

Key dates

this monthRegisteredMar 2026PromisedOct 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Mar 2026
  • Promised completion31 Oct 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed94 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA160000
COMMERCIAL BUILDINGNA20000
WING BNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 50%.

WING A18%
ActivityProgress
Excavation100%
Basement (if any)50%
Podiums (if any)0%
Plinth50%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
COMMERCIAL BUILDING10%
ActivityProgress
Excavation100%
Basement (if any)5%
Podiums (if any)0%
Plinth5%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed765

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots765
Closed/Covered765
BuildingClosed/CoveredTotal
WING A492492
COMMERCIAL BUILDING2727
WING B246246

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,205 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHRI SANT NAGEBABA MULTI STATE CO OP SOCIETY LTDAhmadnagar (M Corp.)Ahmednagar

Approvals and building plan

Permissible FSI30641.79
Proposed, not sanctioned28,447 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSavedi Road, Adish Plaza near Daule hospital Nagar Savedi Road Ahilyanagar Pin 414003

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR AJAY SHIRKE
EngineerRounak Deepak Nayyar
Chartered AccountantPatel & Sharma
PartnerRole in project
ALSAN INDIA DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2029

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Feb 2026
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf12 Feb 2026
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf12 Feb 2026
Other - LegalFile: Digital 17 3291पै-प्लॉट1.pdf11 Feb 2026
Other - LegalFile: RAJKUMAR GANDHI 2,51,00,0000001_.pdf11 Feb 2026
Other - LegalFile: RAJKUMAR GANDHI KHAREDIKHAT NO-51_.pdf11 Feb 2026
Details of encumbrances concerned to FinanceFile: Declaration of encumbrances concerned to legal.pdf30 Jan 2026
Details of encumbrances concerned to LegalFile: Declaration of encumbrances concerned to legal.pdf30 Jan 2026
Other - TechnicalFile: SS of CC mail.pdf30 Jan 2026
Other - TechnicalFile: Declaration for Building Plan.pdf8 Jan 2026
Commencement Certificates / NA Order for plotted developmentFile: palm city renewal.pdf7 Jan 2026
Other - LegalFile: Form B Affidavit Cum Declaration.pdf7 Jan 2026
Other - TechnicalFile: Declaration Cum Undertaking.pdf7 Jan 2026
Other - TechnicalFile: 13 Declaration-Cum-Undertaking.pdf22 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate compressed.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Latest Final.pdf30 Apr 2025
CERSAI detailsFile: Undertaking For No Charge On Project.pdf30 Apr 2025
Other - TechnicalFile: Ajay shirke and associate.pdf30 Apr 2025
Other - TechnicalFile: Declaration-Cum-Undertaking.pdf30 Apr 2025
Layout approvalFile: 1 Highlighted compressed final Copy.pdf29 Apr 2025
Building plan approvalFile: 3 Ground Floor Parking.pdf29 Apr 2025
Building plan approvalFile: 4 Podium 1st Floor.pdf29 Apr 2025
Building plan approvalFile: 5 Basement Commercial.pdf29 Apr 2025
Building plan approvalFile: 6 Ground Floor Commercial.pdf29 Apr 2025
Building plan approvalFile: 7 1st Floor Commercial.pdf29 Apr 2025
Building plan approvalFile: 8 A- 1st Floor.pdf29 Apr 2025
Building plan approvalFile: 9 A- 2nd Floor.pdf29 Apr 2025
Building plan approvalFile: 10 A- 3rd Floor.pdf29 Apr 2025
Building plan approvalFile: 11 A- 12th Floor.pdf29 Apr 2025
Building plan approvalFile: 12 A- 13th Floor.pdf29 Apr 2025
Building plan approvalFile: 13 A- 14th Floor.pdf29 Apr 2025
Building plan approvalFile: 14 A- 15th Floor.pdf29 Apr 2025
Building plan approvalFile: 15 A- Terrace.pdf29 Apr 2025
Building plan approvalFile: 16 A wing 1st plan compressed.pdf29 Apr 2025
Building plan approvalFile: 17 A 3rd-12th plan compressed.pdf29 Apr 2025
Building plan approvalFile: 18 A 15th plan.pdf29 Apr 2025
Building plan approvalFile: 19 Rd side A.pdf29 Apr 2025
Building plan approvalFile: 20 A.pdf29 Apr 2025
Building plan approvalFile: 21 B 1st Floor.pdf29 Apr 2025
Building plan approvalFile: 22 B 3rd to 12th plan.pdf29 Apr 2025
Building plan approvalFile: 23 B 14th plan.pdf29 Apr 2025
Building plan approvalFile: 24 B- Terrace.pdf29 Apr 2025
Building plan approvalFile: 25 B 3rd to 12th Floor plan.pdf29 Apr 2025
Building plan approvalFile: 26.pdf29 Apr 2025
Building plan approvalFile: 27.pdf29 Apr 2025
Copy of the legal title reportFile: LTR Latest.pdf29 Apr 2025
Details of encumbrances concerned to FinanceFile: Declaration of encumbrances concerned to finance.pdf29 Apr 2025
Copy of Layout Approval (in case of layout)File: 1 Highlighted compressed final Copy.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 23 B 14th plan.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 16 A wing 1st plan compressed.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 17 A 3rd-12th plan compressed.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 18 A 15th plan.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 15 A- Terrace.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 19 Rd side A.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 20 A.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 21 B 1st Floor.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 22 B 3rd to 12th plan.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 24 B- Terrace.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 25 B 3rd to 12th Floor plan.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 26.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 27.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 Ground Floor Parking.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 14 A- 15th Floor.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 Podium 1st Floor.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 5 Basement Commercial.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Ground Floor Commercial.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 7 1st Floor Commercial.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 8 A- 1st Floor.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 9 A- 2nd Floor.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 10 A- 3rd Floor.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 11 A- 12th Floor.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 12 A- 13th Floor.pdf29 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 13 A- 14th Floor.pdf29 Apr 2025
Other - LegalFile: CERTIFICATE OF INCORPORATION.PDF29 Apr 2025
Other - LegalFile: AOA (1).pdf29 Apr 2025
Details of encumbrances concerned to LegalFile: Declaration of encumbrances concerned to finance.pdf29 Apr 2025
Proforma of Allotment letterFile: 08 Model Form of Allotment Letter.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Final.pdf28 Apr 2025
Other - TechnicalFile: Clarification with respect to Amenity Space.pdf28 Apr 2025
Other - TechnicalFile: 06 Athority Letter.pdf28 Apr 2025

How this compares with Ahmednagar

7%of Ahmednagar projects moved their completion datethis one has not
28%of Ahmednagar registrations have lapsed or been cancelledthis one is on the register

Computed across the 490+ Ahmednagar projects on ReraGenie, from their own filings.

Keep PALM CITY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAVEDI, AHMEDNAGAR490+ in Ahmednagar

Builder: ALSAN INDIA DEVELOPERS PRIVATE LIMITED

ALSAN INDIA DEVELOPERS PRIVATE LIMITED has 1 registration on MahaRERA, including PALM CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Ahmednagar district page.

Frequently asked questions

What are my rights if PALM CITY is delayed beyond 31 Oct 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PALM CITY?

The registered promoter entity is ALSAN INDIA DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PALM CITY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PALM CITY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PALM CITY?

The professionals named in the filing: Architect: AR AJAY SHIRKE; Engineer: Rounak Deepak Nayyar; Chartered Accountant: Patel & Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PALM CITY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PALM CITY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PALM CITY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.