Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OZONE GALAXY Phase III is a Residential / Group Housing project by HALLMARK INFRA REALTY LLP in Thane, Maharashtra, registered with MahaRERA as P51700080793 on 8 Jul 2025. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 19 of the 76 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameOZONE GALAXY Phase III
- TypeResidential / Group Housing
- Location
- BEHIND DURGESH PARK
- OZONE GALAXY NEAR YOGESHWAR BUNGLOW
- Kalher (CT)
- Bhiwandi
- Thane
- 421302
- Pincode421302
- RERA no.P51700080793
- ReraGenie IDRG-MH-60381
Builder
- NameHALLMARK INFRA REALTY LLP
- Entity typePartnership
- PartnersAKSHAY VIMALCHAND KOTHARI, HASMUKH DEVICHAND JAIN, KIRANRAJ KUNDANMAL PUNAMIYA, MAHESH JAGAN SALVI, RAMESH SITARAM PATIL, SANJEEV RAMESH PATIL, NARAYAN VITHAL PATIL, TUSHAR MAHANAND PATIL, SANJAY EKANATH PATIL, MAHESH JAGAN SALVI, TUSHAR MAHANAND PATIL, HASMUKH DEVICHAND JAIN and 6 more
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on8 Jul 2025
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
- Buildings2 building records
- Documents filed69 files
Current status
Figures as on 18 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Residential Building C, Wing A | NA | 9 | 7 | 34 | 0 | 34 |
| Residential Building C, Wing B | NA | 9 | 7 | 42 | 0 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
Residential Building C, Wing A27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Residential Building C, Wing B27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 80% |
| Street Lighting | Yes | 80% |
| Community Buildings | Yes | 80% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 80% |
| Aggregate area of recreational Open Space | Yes | 80% |
| Open Parking | Yes | 80% |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Residential Building C, Wing A | 10 | 10 |
| Residential Building C, Wing B | 14 | 14 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Residential Building C, Wing B | NA | Rs 11.72 cr | Rs 2.11 cr |
| Residential Building C, Wing A | NA | Rs 8.57 cr | Rs 1.54 cr |
| - | NA | Rs 80.97 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Atul Anil Gharat |
| Engineer | Aditya Rajan Deshmukh |
| Chartered Accountant | Suresh Kothari |
| Chartered Accountant | Surendra Heda |
| Partner | Role in project |
|---|---|
| HALLMARK INFRA REALTY LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in completion of the project is attributable to circumstances beyond the control of the promoter, primarily due to prolonged processing time by the concerned statutory authorities for grant of requisite approvals and registrations. The construction schedule was consequently impacted as further progress was dependent on receipt of such approvals. The promoter has at all times complied with the applicable provisions of the RERA Act and allied regulations and has taken all reasonable steps to expedite the approval process.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed69
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 RERA 31032026.pdf | 18 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 31032026.pdf | 18 Jun 2026 |
| Withdrawal Update Form 3File: Format 3 HIRLLP.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: Annexure A Form-1 Ozone Galaxy Phase-3_0001.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Annexure A Form-1 Ozone Galaxy Phase-3_0001.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: FORM 3 HIRLLP.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: FORM 3 HIRLLP.pdf | 21 May 2026 |
| Withdrawal Update Form 1File: Annexure A Form-1 Ozone Galaxy Phase-3_0001.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Annexure A Form-1 Ozone Galaxy Phase-3_0001.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Annexure A Form-1 Ozone Galaxy Phase-3_0001.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form-3 Signed (1).pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 HIRLLP.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 HIRLLP.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: OZONE FORM-1 (25-11-2025).pdf | 7 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 7 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 HIRLLP.pdf | 7 Mar 2026 |
| Withdrawal Update Form 1File: Architects Certificate.pdf | 26 Dec 2025 |
| Withdrawal Update Form 2File: Engineers Certificate.pdf | 26 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 HIRLLP.pdf | 26 Dec 2025 |
| Form 1File: OZONE FORM-1 (25-11-2025).pdf | 26 Nov 2025 |
| Form 2File: Form 2.pdf | 26 Nov 2025 |
| Form 3File: HIRLLP Rera Form 3 Q2 FY 2025-26 Form-3.pdf | 26 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold HIRLLP Q2 FY 2025-26 Signed.pdf | 26 Nov 2025 |
| Proforma of Agreement for saleFile: 27062025 Model Agreement Final.pdf | 27 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 HIRLLP.pdf | 14 May 2025 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf | 11 Apr 2025 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf | 11 Apr 2025 |
| Building plan approvalFile: Building Layout 6 to 7.pdf | 26 Mar 2025 |
| Building plan approvalFile: Building Plan Approval.pdf | 26 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: SKM_C250i-m25032614330 (1).pdf | 26 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout 6 to 7.pdf | 26 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval.pdf | 26 Mar 2025 |
| Other - TechnicalFile: Declaration of Plot Area.pdf | 26 Mar 2025 |
| Other - TechnicalFile: 7 Format Declaration Cum Undertaking.pdf | 19 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Adobe Scan 22-Apr-2025 (1).pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Kiranraj Punamiya.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Tushar Patil.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sanjeev Patil.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sanjay Patil.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Ramesh Patil.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Narayan Patil.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Mahesh Salvi.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Hasmukh Jain.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Dinesh Kothari.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Akshay Kothari.pdf | 3 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Satish Punamiya.pdf | 3 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Work Start Notice (1).pdf | 27 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: 6b Details of encumbrances concerned to Finance.pdf | 12 Feb 2025 |
| Details of encumbrances concerned to LegalFile: 6b Details of encumbrances concerned to Finance.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf | 7 Feb 2025 |
| Declaration in FORM BFile: FORM B Affidavit Cum Declaration.pdf | 4 Feb 2025 |
| CERSAI detailsFile: 7 CERSAI.pdf | 4 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank Accounts.pdf | 4 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 6a Disclosure for Secured and Unsecured finance.pdf | 4 Feb 2025 |
| Proforma of Allotment letterFile: allotment letter_compressed.pdf | 27 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: declaration about separate bank account.pdf | 27 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: Deviations Report with respect to Allotment Letter.pdf | 27 Jan 2025 |
| Layout approvalFile: Layout.pdf | 9 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 9 Dec 2022 |
| PAN CardFile: 1 PAN Card.pdf | 24 Nov 2022 |
| Copy of the legal title reportFile: 1 Format A Copy of the legal title report.pdf | 24 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Building C.pdf | 24 Nov 2022 |
| Declaration about Commencement CertificateFile: Format D.pdf | 24 Nov 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Moryasportscity Phase 1P51700024330 | Bhiwandi, Thane | 69 | Feb 2020 | Ongoing | Dec 2024Registered original: Dec 2023 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 69 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep OZONE GALAXY Phase III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OZONE GALAXY NEAR YOGESHWAR BUNGLOW7,600+ in Thane
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: HALLMARK INFRA REALTY LLP
HALLMARK INFRA REALTY LLP has 2 registrations on MahaRERA, including OZONE GALAXY and OZONE GALAXY Phase III. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if OZONE GALAXY Phase III is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OZONE GALAXY Phase III?
The registered promoter entity is HALLMARK INFRA REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OZONE GALAXY Phase III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for OZONE GALAXY Phase III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OZONE GALAXY Phase III?
The professionals named in the filing: Architect: Atul Anil Gharat; Engineer: Aditya Rajan Deshmukh; Chartered Accountant: Suresh Kothari; Chartered Accountant: Surendra Heda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OZONE GALAXY Phase III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback