OZONE GALAXY

By HALLMARK INFRA REALTY LLP

RG-MH-52655 · RERA P51700016633 · Last updated on MahaRERA portal: 10 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
0 of 55Construction stages doneacross 5 buildings; furthest along: Excavation, 0%
22 of 100Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

OZONE GALAXY is a Residential / Group Housing project by HALLMARK INFRA REALTY LLP in Thane, Maharashtra, registered with MahaRERA as P51700016633 on 28 May 2018. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 78 of the 100 units on this registration are recorded sold or booked, and 0 of 55 construction stages are filed complete.

At a glance

Project

  • NameOZONE GALAXY
  • TypeResidential / Group Housing
  • Location
    • THANE BHIWANDI ROAD
    • KALHER
    • Kalher (CT)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700016633
  • ReraGenie IDRG-MH-52655

Builder

  • NameHALLMARK INFRA REALTY LLP
  • Entity typePartnership
  • PartnersAKSHAY VIMALCHAND KOTHARI, HASMUKH DEVICHAND JAIN, KIRANRAJ KUNDANMAL PUNAMIYA, MAHESH JAGAN SALVI, RAMESH SITARAM PATIL, SANJEEV RAMESH PATIL, NARAYAN VITHAL PATIL, TUSHAR MAHANAND PATIL, SANJAY EKANATH PATIL, MAHESH JAGAN SALVI, TUSHAR MAHANAND PATIL, HASMUKH DEVICHAND JAIN and 6 more
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredMay 2018PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 May 2018
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings5 building records
  • Documents filed59 files

Current status

78%78 of 100 units booked

Figures as on 10 Jan 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA7641041
BUILDING B WING ANA6624024
BUILDING B- BWINGNA6635035
BUILDING CNA60000
BUNGLOWNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 10 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.

BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B- BWING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGLOW0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,840 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMumbai Metropolitan Region Development Authority
Permissible FSI6498.0
Proposed, not sanctioned6,498 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCREEK VIEW APT, MUMBAI PUNE ROAD, KALWA

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL ANIL GARAT
ArchitectAtul Anil Gharat
EngineerAditya Rajan Deshmukh
Chartered AccountantSuresh Kothari
Chartered AccountantSurendra Heda
PartnerRole in project
HALLMARK INFRA REALTY LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 May 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development (11).pdf10 Jan 2025
Layout approvalFile: 2 Building Plan Approval _ NA Order for plotted development (1).pdf10 Jan 2025
Layout approvalFile: 3 Building Plan Approval _ NA Order for plotted development (2).pdf10 Jan 2025
Layout approvalFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf10 Jan 2025
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (11).pdf10 Jan 2025
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development (1).pdf10 Jan 2025
Building plan approvalFile: 3 Building Plan Approval _ NA Order for plotted development (2).pdf10 Jan 2025
Building plan approvalFile: 4 Building Plan Approval _ NA Order for plotted development (1).pdf10 Jan 2025
Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development (11).pdf10 Jan 2025
Copy of Layout Approval (in case of layout)File: 2 Building Plan Approval _ NA Order for plotted development (1).pdf10 Jan 2025
Copy of Layout Approval (in case of layout)File: 3 Building Plan Approval _ NA Order for plotted development (2).pdf10 Jan 2025
Copy of Layout Approval (in case of layout)File: 4 Building Plan Approval _ NA Order for plotted development (1).pdf10 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf10 Jan 2025
Building Plan Approval (IOD)File: 1 Building Plan Approval _ NA Order for plotted development (11).pdf10 Jan 2025
Building Plan Approval (IOD)File: 2 Building Plan Approval _ NA Order for plotted development (1).pdf10 Jan 2025
Building Plan Approval (IOD)File: 3 Building Plan Approval _ NA Order for plotted development (2).pdf10 Jan 2025
Building Plan Approval (IOD)File: 4 Building Plan Approval _ NA Order for plotted development (1).pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 17042020.pdf10 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 16042021.pdf10 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 05042022.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 HIRLLP FY 2021-22 Updated.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Hallmark FY 2019-20.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 hallmark FY 2020-21.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 HIRLLP FY 2021-22 Updated.pdf14 Feb 2023
Certificates of CA (Form 3)File: FINAL Hallmark RERA Certificate March 2020.pdf5 Oct 2020
Certificates of CA (Form 3)File: RERA DEC 19 HALLAMRK.pdf4 Mar 2020
Certificates of CA (Form 3)File: RERA Cretificate for Hallmark for Sep 19 REDUCED.pdf25 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 annual Hallmark reduce.pdf22 Nov 2019
Certificates of CA (Form 3)File: RERA fORM 3 JUNE 19-compressed.pdf9 Aug 2019
Certificates of CA (Form 3)File: RERA CERTIFICATE MAR 19.pdf6 Aug 2019
Certificates of CA (Form 5)File: RERA CERTIFICATE MAR 19.pdf6 Aug 2019
Certificates of CA (Form 3)File: OZONE_CERT_reduce.pdf11 Feb 2019
Certificates of CA (Form 3)File: Hallmark RERA june 18-min.pdf30 Jan 2019
Certificates of CA (Form 3)File: Hallmark RERA sept 18-min.pdf30 Jan 2019
Layout approvalFile: Building Layout Plan 1.pdf16 May 2018
Layout approvalFile: Building Layout Plan 3.pdf16 May 2018
Layout approvalFile: Building Layout Plan 5.pdf16 May 2018
Building plan approvalFile: Building Layout Plan 1.pdf16 May 2018
Layout approvalFile: Building Layout Plan 2.pdf16 May 2018
Layout approvalFile: Building Layout Plan 4.pdf16 May 2018
PAN CardFile: PAN HALLMARK.pdf16 May 2018
Copy of the legal title reportFile: Legal title Report.pdf16 May 2018
Details of encumbrancesFile: Declaration of no encumbrances.pdf16 May 2018
Copy of Layout Approval (in case of layout)File: Building Layout Plan 1.pdf16 May 2018
Copy of Layout Approval (in case of layout)File: Building Layout Plan 3.pdf16 May 2018
Copy of Layout Approval (in case of layout)File: Building Layout Plan 2.pdf16 May 2018
Copy of Layout Approval (in case of layout)File: Building Layout Plan 4.pdf16 May 2018
Copy of Layout Approval (in case of layout)File: Building Layout Plan 5.pdf16 May 2018
Building Plan Approval (IOD)File: Building Layout Plan 1.pdf16 May 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf16 May 2018
Declaration in FORM BFile: Form B Affidavit.pdf16 May 2018
Certificates of CA (Form 3)File: CA Certificate.pdf16 May 2018
Proforma of Allotment letterFile: Declaration for agreement for sale.pdf16 May 2018
Proforma of Allotment letterFile: Declaration for allotment Letter.pdf16 May 2018
OtherFile: HallMark Infra Partnership for Admission Agreement.pdf16 May 2018
OtherFile: narayan patil - 1.pdf16 May 2018
OtherFile: tusar m patil -1.pdf16 May 2018
OtherFile: sanjiv r patil - 1.pdf16 May 2018
OtherFile: ramesh s patil - 1.pdf16 May 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Moryasportscity Phase 1P51700024330Bhiwandi, Thane69Feb 2020OngoingDec 2024Registered original: Dec 2023Not delivered

How this compares with Thane

78%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OZONE GALAXY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALHER7,600+ in Thane

Builder: HALLMARK INFRA REALTY LLP

HALLMARK INFRA REALTY LLP has 2 registrations on MahaRERA, including OZONE GALAXY and OZONE GALAXY Phase III. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that OZONE GALAXY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if OZONE GALAXY is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OZONE GALAXY?

The registered promoter entity is HALLMARK INFRA REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OZONE GALAXY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OZONE GALAXY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OZONE GALAXY?

The professionals named in the filing: Architect: ATUL ANIL GARAT; Architect: Atul Anil Gharat; Engineer: Aditya Rajan Deshmukh; Chartered Accountant: Suresh Kothari; Chartered Accountant: Surendra Heda. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OZONE GALAXY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OZONE GALAXY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OZONE GALAXY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.