ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / OSTWAL ORCHID BUILDING NO. 9 TO 12

Completed No litigation declared Residential / Group Housing project

OSTWAL ORCHID BUILDING NO. 9 TO 12

By ASHA ENTERPRISES

RG-MH-08708 · RERA P51700001968 · Last updated on MahaRERA portal: 6 Aug 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 4 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 21 documents Report an error

OSTWAL ORCHID BUILDING NO. 9 TO 12 is a Residential / Group Housing project by ASHA ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700001968 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameOSTWAL ORCHID BUILDING NO. 9 TO 12
  • TypeResidential / Group Housing
  • Location
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700001968
  • ReraGenie IDRG-MH-08708

Builder

  • NameASHA ENTERPRISES
  • Entity typePartnership
  • PartnerUMRAOSINGH PRITHVIRAJ OSTWAL
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings4 building records
  • Documents filed21 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OSTWAL ORCHID BUILDING NO 9NA190000
OSTWAL ORCHID BUILDING NO 10NA190000
OSTWAL ORCHID BUILDING NO-11NA190000
OSTWAL ORCHID BUILDING NO-12NA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 6 Aug 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 4 buildings.

OSTWAL ORCHID BUILDING NO 9100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
OSTWAL ORCHID BUILDING NO 10100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
OSTWAL ORCHID BUILDING NO-11100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
OSTWAL ORCHID BUILDING NO-12100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 6 Aug 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
SOLAR WATER HITTING SYSTEMYes100%

Parking filed139

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots139
Closed/Covered102
Open Space37
BuildingClosed/CoveredOpen SpaceTotal
OSTWAL ORCHID BUILDING NO 925934
OSTWAL ORCHID BUILDING NO 1021113
OSTWAL ORCHID BUILDING NO-11731184
OSTWAL ORCHID BUILDING NO-12268

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,612 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI9098.16
Proposed, not sanctioned9,098 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOSTWAL HOUSE GROUND FLOOR MIRA BHAYANDER ROAD MIRA ROAD EAST THANE 401107

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJAS CONSULTANT
EngineerADARSH CONSULTANT
Chartered AccountantNEHA K AGARWAL & ASSOCIATES
Chartered AccountantABHISHEK SURANA & CO
Chartered AccountantKHURDIA JAIN & CO
PartnerRole in project
ASHA ENTERPRISES-

Litigation declared3

CaseCourtStatus
RCS 1236/2012THANEPENDING FOR EVIDENCE
RCS 589/2012THANEPENDING FOR EVIDENCE
RCS 582/2013THANEHEARING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Aug 2021

Documents filed21

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BCC-OO.pdf6 Aug 2021
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ORCHID.pdf6 Aug 2021
Certificates of CA (Form 5)File: orchid 1.pdf15 Oct 2018
Certificates of CA (Form 3)File: CA CERTI.pdf28 Aug 2018
Certificates of CA (Form 3)File: CCI22018.pdf22 May 2018
OtherFile: BCC OSTWAL ORCHID BLDG NO 9TO12.pdf16 May 2018
Certificates of CA (Form 3)File: SEP 1.pdf17 Mar 2018
Certificates of CA (Form 3)File: DEC2.pdf17 Mar 2018
Layout approvalFile: LAYOUT UPLOAD RERA.pdf27 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE ORCHID.pdf27 Jul 2017
Details of encumbrancesFile: E-Certificate ORCHID.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT UPLOAD RERA.pdf27 Jul 2017
Declaration in FORM BFile: FORM B.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ORCHID.pdf27 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ORCHID.pdf27 Jul 2017
Certificates of CA (Form 3)File: CA CERTIFICATE ORCHID.pdf27 Jul 2017
Proforma of Allotment letterFile: AGREEMENT RERA-Orchid 9 to 12.pdf27 Jul 2017
Building plan approvalFile: CC BLD-8-12_CC BLD-11-12.pdf21 Jul 2017
PAN CardFile: Asha Enterprises PAN CARD.pdf21 Jul 2017
Building Plan Approval (IOD)File: CC BLD-8-12_CC BLD-11-12.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC BLD-8-12_CC BLD-11-12.pdf21 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
OSTWAL ORCHID BUILDING NO-8 PHASE - IIKANAKIA ROAD BEVERLY PARK MIRA ROAD EAST THANE 40110783CompletedMar 2014Late, Apr 2015
OSTWAL ORCHID BUILDING NO- 1 TO 5, PHASE-IKANAKIA ROAD BEVERLY PARK MIRA ROAD EAST THANE223CompletedSep 2013Late, Dec 2013

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OSTWAL ORCHID BUILDING NO. 9 TO 12 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mira-Bhayandar (M Corp.)7,600+ in Thane

2 kmOSTWAL ORCHID BUILDING NCompleted 105Lapsed / revoked 80Other 109Dot size: filed unitsN

Filed coordinates, straight-line distance. 294 registered projects within 2 km.

Builder: ASHA ENTERPRISES

ASHA ENTERPRISES has 1 registration on MahaRERA, including OSTWAL ORCHID BUILDING NO. 9 TO 12. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if OSTWAL ORCHID BUILDING NO. 9 TO 12 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OSTWAL ORCHID BUILDING NO. 9 TO 12?

The registered promoter entity is ASHA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OSTWAL ORCHID BUILDING NO. 9 TO 12?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OSTWAL ORCHID BUILDING NO. 9 TO 12?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OSTWAL ORCHID BUILDING NO. 9 TO 12?

The professionals named in the filing: Architect: TEJAS CONSULTANT; Engineer: ADARSH CONSULTANT; Chartered Accountant: NEHA K AGARWAL & ASSOCIATES; Chartered Accountant: ABHISHEK SURANA & CO; Chartered Accountant: KHURDIA JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OSTWAL ORCHID BUILDING NO. 9 TO 12?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OSTWAL ORCHID BUILDING NO. 9 TO 12. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OSTWAL ORCHID BUILDING NO. 9 TO 12 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.