Registration lapsed Litigation declared Residential / Group Housing project

Orion 15-16-17

By NOVA DEVELOPERS PVT LTD

RG-MH-12928 · RERA P52100021945 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Litigation declared, 4 cases
  • 14 complaints at MahaRERA
  • Completion date moved by 7 months
  • 1 extension taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
4 of 576Units unsoldnot recorded sold or booked
14Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Orion 15-16-17 is a Residential / Group Housing project by NOVA DEVELOPERS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100021945 on 25 Aug 2019. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 7 months from the original filing. 572 of the 576 units on this registration are recorded sold or booked. 14 complaints are on record with the regulator.

At a glance

Project

  • NameOrion 15-16-17
  • TypeResidential / Group Housing
  • Location
    • Blue Ridge Approach Road
    • Hinjavadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021945
  • ReraGenie IDRG-MH-12928

Builder

  • NameNOVA DEVELOPERS PVT LTD
  • Entity typeCompany
  • DirectorPUSHKAR PRAMOD APTE
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

7 months past promisethis monthRegisteredAug 2019First promiseAug 2025Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on25 Aug 2019
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 1 Aug 2025)
  • Buildings3 building records
  • Documents filed66 files

Current status

99%572 of 576 units booked

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Orion - 15NA36361920192
Orion - 16NA36361920192
Orion - 17NA36361920192

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Orion - 15Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Orion - 16Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Orion - 17Not stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes30%

Parking filed558

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots558
Closed/Covered558
BuildingClosed/CoveredTotal
Orion - 15186186
Orion - 16186186
Orion - 17186186

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area16,963 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI46097.69
Proposed, not sanctioned45,806 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch Fort Branch ,Mumbai

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAniruddha Vaidya & Associates
EngineerJW Consultants LLP
EngineerShirish Patil
Chartered AccountantKAPURE & KAPURE CHARTERED ACCOUNTANTS
Chartered AccountantGosavi Yardi & CO.
Chartered AccountantMSKA & Associates
PartnerRole in project
NOVA DEVELOPERS PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA15072502071Aug 2025 → Mar 2026

Reason as filed by the promoterWe wish to bring to your kind attention that, despite our continuous and sincere efforts to maintain progress on the project, unforeseen challenges have impacted the originally declared timeline for completion. A key factor contributing to this delay has been the COVID-19 pandemic, which caused widespread disruption to construction activities due to labor unavailability, supply chain interruptions, and adverse site conditions. These disruptions severely affected the momentum of on-site work and extended the overall execution schedule. While significant progress has been achieved since, certain

Litigation declared4

CaseCourtStatus
9028/2017/2017High Court MumbaiMatter is kept for pre admission as per sitting list
9029/2017/2017High Court MumbaiMatter is kept for pre admission as per sitting list
ST/6443/2016/2016High Court MumbaiMatter is kept for pre admission as per sitting list
9028/2017/2017High Court MumbaiOngoing

Complaints filed with MahaRERA14

Case no.ComplainantRespondentFiled
CC12502551Vivek RaajNOVA DEVELOPERS PVT LTD24/07/2025
CC12502804BHUVAN BHATTNOVA DEVELOPERS PVT LTD09/08/2025
CC12603024Gyanendra BhadauriaNOVA DEVELOPERS PVT LTD21/05/2026
CC12600470Rahul MahatoNOVA DEVELOPERS PVT LTD26/01/2026
CC12600560Amit Ashok ChauguleNOVA DEVELOPERS PVT LTD01/02/2026
CC12600814Manisha ChatterjeeNOVA DEVELOPERS PVT LTD13/02/2026
CC12601399Devang Ratilal ShahNOVA DEVELOPERS PVT LTD13/03/2026
CC12601748Abhimanyu KoulNOVA DEVELOPERS PVT LTD26/03/2026
CC12602031Rajeev Kumar SinghNOVA DEVELOPERS PVT LTD06/04/2026
CC12602982Gayatri Shripad Gavai-NOVA DEVELOPERS PVT LTD20/05/2026
CC12602156Ashwini SinghNOVA DEVELOPERS PVT LTD12/04/2026
CC12602730Rohit Ramesh ThakurNOVA DEVELOPERS PVT LTD10/05/2026
CC12602966Saransh ChaudhariNOVA DEVELOPERS PVT LTD19/05/2026
CC12604767Sagar Rajendra MiskarNOVA DEVELOPERS PVT LTD29/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 June 25.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1 June 25.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1 Sept 25.pdf29 Jun 2026
Withdrawal Update Form 1File: Form 1 Dec25.pdf29 Jun 2026
Withdrawal Update Form 2File: Rera Form 2 Orion- June- 2025_compressed.pdf29 Jun 2026
Withdrawal Update Form 2File: Rera Form 2 Orion- June- 2025_compressed.pdf29 Jun 2026
Withdrawal Update Form 2File: Rera Form 2 Orion- June- 2025_compressed (1).pdf29 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf29 Jun 2026
Withdrawal Update Form 3File: Signed Form 3_orion.pdf29 Jun 2026
Withdrawal Update Form 3File: Signed Form 3_orion.pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3 Sept 25.pdf29 Jun 2026
Withdrawal Update Form 3File: Form 3 Sept 25.pdf29 Jun 2026
Form 2A (FY 2020-2021)File: Form 2A_Orion 15,16,17_year2020-21.pdf21 Jul 2025
Form 2A (FY 2021-2022)File: Form 2A_Orion 15,16,17_year2021-22.pdf21 Jul 2025
Form 2A (FY 2022-2023)File: Form 2A_Orion 15,16,17_year2022-23.pdf21 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A_Orion 15,16,17_year2023-24.pdf21 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A_Orion 15,16,17_year2024-25.pdf21 Jul 2025
Form 2A (FY 2019-2020)File: Form 2A_Orion 15,16,17_year2019-20.pdf21 Jul 2025
Form 5 (FY 2022-2023)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (33).pdf21 Jul 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24) (46).pdf21 Jul 2025
Form 5 (FY 2019-2020)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20) (13).pdf21 Jul 2025
Form 1File: Form 1 Orion 15, 16, 17 (3).pdf17 Jul 2025
Form 2File: Form 2 Orion 15, 16, 17.pdf17 Jul 2025
Form 3File: Signed Form 3 _Orion.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 - Orion 151617.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-orion-Mar'25-uploaded.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Orion-Dec'24-uploaded.pdf15 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of inventory-orion 30 sept 24-uploaded-.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Orion 23-24-uploaded.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Orion MAHARERA as on 30 jun 24-.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 22 Orion-NOVA-Form 1-June'24-uploaded.pdf4 Jul 2024
Disclosure of sold/ booked inventoryFile: Inventory Reoprt-Orion 15-16-17- 31st March 2024-uploaded.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Orion-Mar'24-uploaded.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Orion 151617-Dec'23-uploaded.pdf20 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Orion - Form 5 Mar 23.pdf26 Dec 2023
Layout approvalFile: Sheet 1-Orion New sanction-Nov'23-Compressed.pdf22 Dec 2023
Copy of Layout Approval (in case of layout)File: Sheet 1-Orion New sanction-Nov'23-Compressed.pdf22 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Plan Permission Order-Orion-06Nov23.pdf22 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Orion 15, 16, 17-Sept'23-uploaded.pdf9 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ORION-July '23.pdf5 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Orion - Form 5 - Mar 22.pdf31 Jan 2023
Proforma of Allotment letterFile: 07c Agreement to Sell Orion -E regn A4.pdf15 Jan 2022
Copy of the legal title reportFile: Legal Title Report_Orion 15 to T17_04-10-2021_compressed.pdf17 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Orion-Nova-Form-2A_new promoter.pdf1 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Orion 15 16 17 PSCL Old promoter_compressed.pdf1 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 15 RERA Orion compressed.pdf1 Apr 2021
Copy of the legal title reportFile: Title Certificate Post Merger Orion 151617 uploaded.pdf11 Mar 2021
Proforma of Allotment letterFile: T15 to 17 Agr to Sell Revised on 15102020 uploaded for merger.pdf29 Oct 2020
Layout approvalFile: Layout Approval revised 24 Dec2019.pdf7 Jan 2020
Copy of Layout Approval (in case of layout)File: Layout Approval revised 24 Dec2019.pdf7 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Revised 24 Dec2019.pdf7 Jan 2020
Proforma of Allotment letterFile: Orion Flat Agreement 24Dec 2019.pdf7 Jan 2020
Proforma of Allotment letterFile: Orion-151617-Proforma Allotment Ltr Agreement To Sale.pdf26 Aug 2019
Details of encumbrancesFile: Encumbrance Covering Letter_T15 to T17_by Promoter_05-08-2019.pdf14 Aug 2019
Declaration in FORM BFile: Encumbrance Certificate_T15 to T17_by Promoter_05-08-2019.pdf13 Aug 2019
Declaration in FORM BFile: Form B Revised 07Aug 2019 Orion 15 16 17.pdf13 Aug 2019
Declaration in FORM BFile: Form B Revised 07Aug 2019 Orion 15 16 17.pdf7 Aug 2019
Certificates of CA (Form 3)File: Orion 15 16 17 Form 3.pdf26 Jul 2019
Building plan approvalFile: Building Plan Approval T15 to T17.pdf25 Jul 2019
Layout approvalFile: Building Plan Approval T15 to T17.pdf25 Jul 2019
Copy of Layout Approval (in case of layout)File: Building Plan Approval T15 to T17.pdf25 Jul 2019
Building Plan Approval (IOD)File: Building Plan Approval T15 to T17.pdf25 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate Orion T15 to T17 24 07 2019.pdf25 Jul 2019
Proforma of Allotment letterFile: Proforma Allotment Letter and Agreement for Sale 25072019.pdf25 Jul 2019
Copy of the legal title reportFile: Orion 15 16 17 Title Certificate.pdf20 Jul 2019
Details of encumbrancesFile: Orion 15 16 17 Encumbrance Certificate.pdf20 Jul 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationRegisteredStatusPromisedDelivered
Blueridge-The GrovesP52100027419Hinjawadi, PuneDec 2020OngoingJun 2026Not delivered

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 7 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Orion 15-16-17 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjavadi13,700+ in Pune

2 kmOrion 15-16-17Completed 37Lapsed / revoked 18Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 103 registered projects within 2 km.

Builder: NOVA DEVELOPERS PVT LTD

NOVA DEVELOPERS PVT LTD has 2 registrations on MahaRERA, including Orion 15-16-17 and Blueridge-The Groves. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Orion 15-16-17 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Orion 15-16-17 is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Orion 15-16-17?

The registered promoter entity is NOVA DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Orion 15-16-17?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Orion 15-16-17?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Orion 15-16-17?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Orion 15-16-17?

The professionals named in the filing: Architect: Aniruddha Vaidya & Associates; Engineer: JW Consultants LLP; Engineer: Shirish Patil; Chartered Accountant: KAPURE & KAPURE CHARTERED ACCOUNTANTS; Chartered Accountant: Gosavi Yardi & CO.; Chartered Accountant: MSKA & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Orion 15-16-17?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Orion 15-16-17. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Orion 15-16-17 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.