ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / ORCHID TOWER

Registered No litigation declared Residential / Group Housing project

ORCHID TOWER

By SKYVIEW BUILDERS & DEVELOPERS

RG-MH-39490 · RERA P51700034353 · Last updated on MahaRERA portal: 3 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 66%
36 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

ORCHID TOWER is a Residential / Group Housing project by SKYVIEW BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700034353 on 4 Apr 2022. Possession is promised by 31 Jan 2027. 6 of the 42 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameORCHID TOWER
  • TypeResidential / Group Housing
  • Location
    • SHREE MALANGARDG ROAD
    • KALYAN
    • PISAVALI
    • Thane
    • 421306
  • Pincode421306
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700034353
  • ReraGenie IDRG-MH-39490

Builder

  • NameSKYVIEW BUILDERS & DEVELOPERS
  • Entity typePartnership
  • PartnersSANDEEP EKNATH GAIKWAD, GAURAV EKNATH GAIKWAD, JYOTI ROHIDAS GAIKWAD, YASH ROHIDAS GAIKWAD

Key dates

this monthRegisteredApr 2022PromisedJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Apr 2022
  • Promised completion31 Jan 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed118 files

Current status

14%6 of 42 units booked
70.8%Work done, per cost certificate

Figures as on 3 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ORCHID TOWERNA55311142

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 66%.

ORCHID TOWER: 39% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure66%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises58%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed61

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots61
Closed/Covered1
Open Space60

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,060 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Dec 2025
LandownerVillageDistrict
RAMCHANDRA KASHINATH BHOIRKATEMANEVALIThane

Approvals and building plan

Sanctioning authorityAssistant Director of Down Planning KDMC
Permissible FSI4258.01
Proposed, not sanctioned1,805 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGP PARSIK BANK SHOP NO 5,6,7, GROUND FLOOR PUNE LINK ROAD KALYAN EAST 421306
Estimated costRs 9.24 cr
Cost incurredRs 6.55 cr
Work done70.83%
BuildingWingEstimatedIncurred
ORCHID TOWERNARs 8.73 crRs 6.55 cr
-NARs 51.35 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMADHAN V GADGIL
EngineerARTUL KUDTARKAR
EngineerANANDA Ganpat Kamble
Chartered AccountantDEVIDAS ABHASAH SALUNKEEB
Chartered AccountantRAMA HARISHANKAR SHUKLA
PartnerRole in project
SKYVIEW BUILDERS & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jan 2027

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect certificate 01 07 25 to 30 09 25.pdf3 Feb 2026
Withdrawal Update Form 1File: Architect certificate 01 07 25 to 30 09 25.pdf3 Feb 2026
Withdrawal Update Form 1File: Architect certificate 01 10 25 to 31 12 25.pdf3 Feb 2026
Withdrawal Update Form 2File: Engineering certificate 01 07 25 to 30 09 25.pdf3 Feb 2026
Withdrawal Update Form 2File: Engineering certificate 01 07 25 to 30 09 25.pdf3 Feb 2026
Withdrawal Update Form 2File: Engineering certificate 01 10 25 to 31 12 25.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 july 25 to sep 25.pdf3 Feb 2026
Withdrawal Update Form 3File: Form 3 july 25 to sep 25.pdf3 Feb 2026
Withdrawal Update Form 3File: From 3 for oct 25 to 31 Dec 2025.pdf3 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 1File: architect certificate 2.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE_compressed.pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Withdrawal Update Form 3File: FORM 3 CA_compressed (1).pdf2 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 FY 2024-2025.pdf2 Feb 2026
Form 2A (FY 2022-2023)File: From 2A- FY 22- 23.pdf23 Jan 2026
Form 2A (FY 2023-2024)File: From 2A- 23- 24.pdf23 Jan 2026
Form 2A (FY 2024-2025)File: From 2A- FY 24-25.pdf23 Jan 2026
Form 5 (FY 2022-2023)File: From 5 FY 22-23.pdf23 Jan 2026
Form 5 (FY 2023-2024)File: Form 5 FY 2023 24.pdf23 Jan 2026
Form 1File: Architect certificate 010424 to 300624.pdf7 Jan 2026
Form 2File: Engineering certificate 010424 to 300624.pdf7 Jan 2026
Form 3File: PR - 9 April 2024- 30 June 2024 .pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold and Unsold june 24.pdf7 Jan 2026
Form 1File: Architect certificate 010724 to 300924.pdf7 Jan 2026
Form 2File: Engineering certificate 010724 to 300924.pdf7 Jan 2026
Form 3File: PR - 10 July 2024- 30 Sep 2024 .pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold and unsold details of sep 24.pdf7 Jan 2026
Form 1File: Architect certificate 011024 to 311224.pdf7 Jan 2026
Form 2File: Engineering certificate 011024 to 311224.pdf7 Jan 2026
Form 3File: PR - 11 oct 2024- 31 Dec 2024 .pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold and unsold for Dec 24.pdf7 Jan 2026
Form 1File: Architect certificate 010125 to 310325.pdf7 Jan 2026
Form 2File: Engineering certificate 010125 to 310325.pdf7 Jan 2026
Form 3File: PR - 12 Jan 2025- 31 Mar 2025 .pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold and unsold for Mar 24.pdf7 Jan 2026
Form 1File: Architect certificate April 22 -june 22.pdf19 Dec 2025
Form 2File: Engineering certificate April 2022 to june 2022.pdf19 Dec 2025
Form 3File: PR - 1 April 2022- 30 June 2022.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: 1 April 2022 to 30 june 2022.pdf19 Dec 2025
Form 1File: Architect certificate july 22 to sep 22.pdf19 Dec 2025
Form 2File: Engineering certificate July 2022 to sep 2022.pdf19 Dec 2025
Form 3File: PR - 2 July 2022- 30 Sep 2022.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold and un sold Sep 22.pdf19 Dec 2025
Form 1File: Architect certificate oct 22 to Dec 22.pdf19 Dec 2025
Form 2File: Engineering certificate Oct 2022 to Dec 2022.pdf19 Dec 2025

How this compares with Thane

14%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ORCHID TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALYAN7,600+ in Thane

2 kmORCHID TOWERCompleted 40Lapsed / revoked 34Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 175 registered projects within 2 km.

Builder: SKYVIEW BUILDERS & DEVELOPERS

SKYVIEW BUILDERS & DEVELOPERS has 1 registration on MahaRERA, including ORCHID TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ORCHID TOWER is delayed beyond 31 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ORCHID TOWER?

The registered promoter entity is SKYVIEW BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ORCHID TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ORCHID TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ORCHID TOWER?

The professionals named in the filing: Architect: MADHAN V GADGIL; Engineer: ARTUL KUDTARKAR; Engineer: ANANDA Ganpat Kamble; Chartered Accountant: DEVIDAS ABHASAH SALUNKEEB; Chartered Accountant: RAMA HARISHANKAR SHUKLA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ORCHID TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ORCHID TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ORCHID TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.