Home / Browse projects / Pune, Maharashtra / Opus 76

Registration lapsed No litigation declared Others project

Opus 76

By OM SAI PROPERTIES

RG-MH-14550 · RERA P52100022594 · Last updated on MahaRERA portal: 25 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 24 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2024Possession promised24 months past this date
31 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 87%
0Complaints at MahaRERAon this registration
Jump to the 89 documents Report an error

Opus 76 is a Others project by OM SAI PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100022594 on 9 Oct 2019. Possession was promised by 15 Oct 2024 and is now 24 months past that date.

At a glance

Project

  • NameOpus 76
  • TypeOthers
  • Location
    • Bhumkar chowk Vinode wasti
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100022594
  • ReraGenie IDRG-MH-14550

Builder

  • NameOM SAI PROPERTIES
  • Entity typePartnership
  • PartnersViraj Vijay Renuse, Vasanti Vijay Renuse
  • Declared earlier projects1 →

Key dates

24 months past promisethis monthRegisteredOct 2019PromisedOct 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on9 Oct 2019
  • Promised completion15 Oct 2024
  • Revised completionNone
  • Buildings4 building records
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA150000
B BuildingNA150000
C BuildingNA150000
D Mhada BuildingNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 25 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

31 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 87%.

A Building90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
B Building99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
C Building88%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)87%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
D Mhada Building55%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 25 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed245

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots245
Closed/Covered150
Open Space95
BuildingClosed/CoveredOpen SpaceTotal
A Building452671
B Building453580
C Building603494

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
Bhagwan VinodeWakadPune
Chabubai VinodeWakadPune
Kaluram VinodeWakadPune
Aasha BhondaveWakadPune
Balwant VinodeWakadPune
Sanjay VinodeWakadPune
Sunil VinodeWakadPune
Sangita GavhaneWakadPune
Chandrarang Developers and BuildersPimpale GuravPune

Approvals and building plan

Permissible FSI15776.0
Proposed, not sanctioned15,776 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSurvey no 142-1 Hinjewadi IT park phase 1 Pune 411057

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Vikas Achalkar
EngineerMr Kailas Badgujar
Chartered AccountantCA Sumeet Kate
PartnerRole in project
OM SAI PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Jan 2025

Documents filed89

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 89 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June 2022.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: march 2023.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: June 2023.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 0pus dec 2024.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sep 2023.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture Certificate Opus 76 March 24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Opus 76.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Letter for December 2023.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Letter for Month september 2023.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Letter for Month June 2023.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera letter for march 2023.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1-Form 1_compressed (1).pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Letter for Month september 2023.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Opus 76.pdf24 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Opus 76.pdf24 Jan 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: OPUS 76 -SOCIETY REGISTRATION CERTIFICATE.pdf24 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Opus 76 D bldg Arch Certificate20221208_15424195.pdf24 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Opus 76_Part Completion (2)_11zon.pdf24 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2019-2020.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Dec 2023.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Sept 2023.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold June 2023.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold March 2023.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Sept 2022.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold June 2022.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold March 2022.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Dec 2021.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Sept 2021.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold March 2021.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Dec 2020.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Sept 2020.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold June 2020.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold March 2020.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold-Unsold Dec 2019.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Opus 76 Sold Unsold Inventory.pdf17 Jul 2023
Disclosure of sold/ booked inventoryFile: 4-sold_compressed.pdf20 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3-form 3_compressed.pdf20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-Form 2.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: OSP_OPUS 76_RERA _Form 5_FY 2020-21_signed.pdf13 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: OSP_OPUS 76_RERA_Form 5_FY 2021-22_signed.pdf13 Feb 2023
Proforma of Allotment letterFile: opus76 mhada draft.pdf26 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf9 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf9 Apr 2022
Copy of the legal title reportFile: search title opus76 1.pdf16 Jul 2021
Copy of the legal title reportFile: search title opus76 2.pdf16 Jul 2021
Proforma of Allotment letterFile: Opus76 revised draft.pdf16 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: OSP - OPUS 76 - RERA Form 5 - FY 2019-20.pdf13 Jul 2021
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_compressed.pdf5 Jul 2021
Building plan approvalFile: scan0001486_compressed.pdf3 Jul 2021
Copy of the legal title reportFile: scan0001483_compressed (1).pdf3 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: scan0001486_compressed.pdf3 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf3 Jul 2021
Declaration about Commencement CertificateFile: commencment.pdf3 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE.pdf3 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf3 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf3 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf3 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 27 july_compressed.pdf13 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 21 sep_compressed.pdf13 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE -corrected.pdf19 Dec 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR CERTIFICATE -corrected.pdf19 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: opus july form 2.pdf19 Dec 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: opus sep form 2.pdf19 Dec 2020
Copy of the legal title reportFile: Search title 1-7.pdf16 Dec 2020
Copy of the legal title reportFile: Search title 8-14.pdf16 Dec 2020
Proforma of Allotment letterFile: AGREEMENT-oppus 76 Agreement Draft 14-12-2020 (1).pdf16 Dec 2020
Copy of the legal title reportFile: OSP_POA_compressed-1-12.pdf11 Dec 2020
Copy of the legal title reportFile: OSP_POA_compressed-13-25.pdf11 Dec 2020
Copy of the legal title reportFile: OSP_Kararnama_compressed-1-25-1-12.pdf11 Dec 2020
Copy of the legal title reportFile: OSP_Kararnama_compressed-1-25-13-25.pdf11 Dec 2020
Copy of the legal title reportFile: OSP_Kararnama_compressed-26-35.pdf11 Dec 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate_compressed.pdf29 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate.pdf29 Feb 2020
Layout approvalFile: Layout Plan.pdf2 Oct 2019
Building plan approvalFile: IOD.pdf2 Oct 2019
PAN CardFile: COMPANY PAN opus 76.pdf2 Oct 2019
Copy of the legal title reportFile: search title report.pdf2 Oct 2019
Details of encumbrancesFile: encumbrance certificate.pdf2 Oct 2019
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf2 Oct 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Opus 77Survey no 76-2 near New Poona bakery Vinode wasti Wakad Pune 411057174CompletedJul 2017Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Opus 76 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmOpus 76Completed 104Lapsed / revoked 36Other 56Dot size: filed unitsN

Filed coordinates, straight-line distance. 196 registered projects within 2 km.

Builder: OM SAI PROPERTIES

OM SAI PROPERTIES has 1 registration on MahaRERA, including Opus 76. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Opus 76 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Opus 76 is delayed beyond 15 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Opus 76?

The registered promoter entity is OM SAI PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Opus 76?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Opus 76?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Opus 76?

The professionals named in the filing: Architect: Ar Vikas Achalkar; Engineer: Mr Kailas Badgujar; Chartered Accountant: CA Sumeet Kate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Opus 76?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Opus 76. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Opus 76 to a free account