ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / OPULENT STARLIT

Registered No litigation declared Residential / Group Housing project

OPULENT STARLIT

By OPULENT DEVELOPERS

RG-MH-83628 · RERA P52100035046 · Last updated on MahaRERA portal: 4 May 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 10.00 crore secured on the land, in favour of Capri Global Capital Limited

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 80%
38 of 83Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

OPULENT STARLIT is a Residential / Group Housing project by OPULENT DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100035046 on 29 Apr 2022. Possession is promised by 30 Jun 2027. The completion date has moved by 12 months from the original filing. 45 of the 83 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameOPULENT STARLIT
  • TypeResidential / Group Housing
  • Location
    • SANGAMWADI TPS
    • GHORPADI
    • Haveli
    • Pune
    • 411011
  • Pincode411011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100035046
  • ReraGenie IDRG-MH-83628

Builder

  • NameOPULENT DEVELOPERS
  • Entity typePartnership
  • PartnersATIT SHRIKANT ADMULWAR, AJIT SURYAKANT KHAIRE, DEVIDAS DNYANOBA KADAM

Key dates

this monthRegisteredApr 2022First promiseJun 2026Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Apr 2022
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 30 Jun 2026)
  • Buildings1 building record
  • Documents filed85 files

Current status

54%45 of 83 units booked
72.3%Work done, per cost certificate

Figures as on 4 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA222183083

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

B WING: 58% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 4 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed168

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots168
Closed/Covered168

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,973 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofCapri Global Capital Limited
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on24 Jul 2025
LandownerVillageDistrict
MR AVINASH RAJENDRA DARAWADE-Pune
MR DHIRAJ DHANANJAY DARAWADE-Pune
MR NARENDRA BABASAHEB DARAWADE-Pune

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY PUNE-PIMPRI CHINCHWAD AREA
Permissible FSI9268.35
Proposed, not sanctioned9,268 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor 84 4 5 Tupe Complex Opp Axis Bank Pune Solapur Road Hadapsar Pune Maharashtra 411028
Estimated costRs 52.39 cr
Cost incurredRs 37.87 cr
Work done72.28%
BuildingWingEstimatedIncurred
-NARs 49.14 crRs 34.62 cr
B WINGNARs 3.25 crRs 3.25 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATIT ADMULWAR
EngineerMR UMESH KALBHOR
EngineerRUPESH PAWAR
Chartered AccountantCA YOGESH D MALI
Chartered AccountantRSMS AND ASSOCIATES
PartnerRole in project
OPULENT DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30032620464Jun 2026 → Jun 2027

Reason as filed by the promoterConstruction of the said project is 75% completed. We need extension to complete the remaining construction.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12500167Ram GawaliOPULENT DEVELOPERS11/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 opulent Developer.pdf4 May 2026
Withdrawal Update Form 2File: Form 2 Opulent Developer (1).pdf4 May 2026
Withdrawal Update Form 3File: OPULENT STARLIT FORM- 3 Fianl.pdf4 May 2026
Withdrawal Update Form 1File: from 01 Opulent Developers 31-01-2025.pdf26 Feb 2026
Withdrawal Update Form 2File: OPULENT DEVELOPERS FROM 2 31-12-2025.pdf26 Feb 2026
Withdrawal Update Form 3File: Revised From 03 Opulent Developers.pdf26 Feb 2026
Form 2A (FY 2024-2025)File: OPUELNT LANDMARKS FROM 02A.pdf5 Dec 2025
Withdrawal Update Form 1File: FORM 1 OPULENT DEVELOPERS KP SEP-2025.pdf19 Nov 2025
Withdrawal Update Form 2File: FORM 2 OPULENT DEVELOPERS ENG SEP -2025.pdf19 Nov 2025
Withdrawal Update Form 3File: FORM 3 OPULANT starlit 30-09-2025.pdf19 Nov 2025
Form 5 (FY 2024-2025)File: opulent developers Form 05 FY 24-25.pdf16 Oct 2025
Form 1File: Architect Certificate - JUN 25 - KP.pdf20 Sep 2025
Form 2File: Engineer Certificate - JUN 25 - KP.pdf20 Sep 2025
Form 3File: Opulent Developers - Form 3 - JUN 25.pdf20 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold - JUN 25 - KP.pdf20 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 5 - MAR 25 - KP.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - MAR 25 - KP.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - MAR 25 - KP OPULENT.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold - Mar 25 - KP OPULENT.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dec 24 Opulent Developers.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Dec 24.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - JUN 24 -KP.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold unsold - JUN 24 - KP.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate - MAR 24.pdf30 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold - MAR 24 - KP.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Updated CA Certificate DEC 2023 KP.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - SEP 23.pdf29 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 - DEC 23 -Opulent Developers.pdf29 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - DEC 2023(3).pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Jun 2022.pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - sep 2022(3).pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23 KP.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Sep 22 - KP.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cirtificate - JUN 22 - KP.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cirtificate - SEP 22 - KP.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cirtificate - JUN 22 - KP.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cirtificate - SEP 22 - KP.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 - DEC 23 -Opulent Developers.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf19 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (3).pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 - Mar 23 - Opulent Developers.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 SEP 23 - Opulent Developers.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 - JUN 23 - Opulent Developers.pdf7 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Opulent Developers - Statment (1).pdf27 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Opulent Developers - Statment.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate Sept.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate Mar.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate Jun.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate OCT.pdf12 Oct 2023
CERSAI detailsFile: 1 sold_ booked March.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: 1 sold_ booked March.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: 1 Sold Unsold June.pdf12 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Sept.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate April.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June.pdf12 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Casa Verde (2).pdf16 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Casa Verde (3).pdf16 Jun 2023
Other - FinanceFile: KP Site - opulent develpers mortgage_compressed-1-30.pdf10 May 2023
Other - FinanceFile: KP Site - opulent develpers mortgage_compressed-31-60.pdf10 May 2023
Other - FinanceFile: KP Site - opulent develpers mortgage_compressed-61-77.pdf10 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Opulent Starlit (1).pdf21 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Feb 2023
Disclosure of sold/ booked inventoryFile: Starlit (1).pdf18 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - KP_compressed (4).pdf18 Feb 2023
Copy of the legal title reportFile: formate A_compressed (1).pdf21 Apr 2022
Details of encumbrancesFile: Encumbranmces.pdf21 Apr 2022
Declaration in FORM BFile: FROM B_compressed.pdf21 Apr 2022
Proforma of Allotment letterFile: Agreement - Opulent Developers - RERA Draft - 16-04-2022 F pdf.pdf21 Apr 2022
Layout approvalFile: Layout paln 1.pdf20 Apr 2022
Building plan approvalFile: 2sanction elevation.pdf20 Apr 2022
Building plan approvalFile: Building floor paln.pdf20 Apr 2022
PAN CardFile: Opulent developers pan card.pdf20 Apr 2022
Copy of Layout Approval (in case of layout)File: Layout paln 1.pdf20 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: Building floor paln.pdf20 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 2sanction elevation.pdf20 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: OPULENT DEVELOPERS CC SKMBT_C36022033003370 (1).pdf20 Apr 2022
Declaration about Commencement CertificateFile: Opulent developers formate D.pdf20 Apr 2022

How this compares with Pune

54%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OPULENT STARLIT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHORPADI13,700+ in Pune

2 kmOPULENT STARLITCompleted 22Lapsed / revoked 9Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 79 registered projects within 2 km.

Builder: OPULENT DEVELOPERS

OPULENT DEVELOPERS has 1 registration on MahaRERA, including OPULENT STARLIT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if OPULENT STARLIT is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OPULENT STARLIT?

The registered promoter entity is OPULENT DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OPULENT STARLIT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against OPULENT STARLIT?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for OPULENT STARLIT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OPULENT STARLIT?

The professionals named in the filing: Architect: ATIT ADMULWAR; Engineer: MR UMESH KALBHOR; Engineer: RUPESH PAWAR; Chartered Accountant: CA YOGESH D MALI; Chartered Accountant: RSMS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OPULENT STARLIT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OPULENT STARLIT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OPULENT STARLIT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.