ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / GIRNAR

Registered No litigation declared Residential / Group Housing project

GIRNAR

By SHREE DATTA REALTORS

RG-MH-97995 · RERA P52100045565 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
26 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 90%
13 of 83Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 137 documents Report an error

GIRNAR is a Residential / Group Housing project by SHREE DATTA REALTORS in Pune, Maharashtra, registered with MahaRERA as P52100045565 on 24 May 2022. Possession is promised by 31 Dec 2026. 70 of the 83 units on this registration are recorded sold or booked, and 26 of 44 construction stages are filed complete.

At a glance

Project

  • NameGIRNAR
  • TypeResidential / Group Housing
  • Location
    • RASTA PETH
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411011
  • Pincode411011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100045565
  • ReraGenie IDRG-MH-97995

Builder

  • NameSHREE DATTA REALTORS
  • Entity typePartnership
  • PartnersAMIT RIKABCHAND JAIN, SANDEEP BHABUTMAL JAIN, SANDEEP RIKABCHAND JAIN, PRASHANT PRAVIN KADAM

Key dates

this monthRegisteredMay 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 May 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings4 building records
  • Documents filed137 files

Current status

84%70 of 83 units booked
76.7%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GIRNAR WING-ANA33606
GIRNAR WING-BNA5425025
GIRNAR WING-CNA7720929
GIRNAR WING-DNA9021223

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

26 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 90%.

GIRNAR WING-A82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GIRNAR WING-B82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GIRNAR WING-C70%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
GIRNAR WING-D35%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor10%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed106

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots106
Closed/Covered75
Open Space31
BuildingClosed/CoveredOpen SpaceTotal
GIRNAR WING-A099
GIRNAR WING-B23023
GIRNAR WING-C01313
GIRNAR WING-D52961

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,882 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jun 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI8067.84
Proposed, not sanctioned6,795 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTIMBER MARKET, BHAWANI PETH, PUNE-411042
Estimated costRs 35.55 cr
Cost incurredRs 27.28 cr
Work done76.73%
BuildingWingEstimatedIncurred
GIRNAR WING-DNARs 14.26 crRs 8.51 cr
GIRNAR WING-CNARs 8.50 crRs 8.50 cr
GIRNAR WING-BNARs 5.96 crRs 5.96 cr
-NARs 5.33 crRs 2.82 cr
GIRNAR WING-ANARs 1.50 crRs 1.50 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKOSHISH DHOOT
EngineerPRASHANT P KADAM
EngineerShree Datta Realtors
Chartered AccountantCA TRUPTI OSWAL
Chartered AccountantShailesh M Oswal & Associates
Chartered AccountantR H Pothiwal & Associates
Chartered AccountantPravin Pise
PartnerRole in project
SHREE DATTA REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed137

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf27 Apr 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE_compressed.pdf27 Apr 2026
Withdrawal Update Form 3File: ENGINEER CERTIFICATE.pdf27 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf4 Feb 2026
Withdrawal Update Form 1File: FORM 1.pdf4 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf4 Feb 2026
Withdrawal Update Form 2File: FORM 2.pdf4 Feb 2026
Withdrawal Update Form 3File: FORM 3_compressed (1).pdf4 Feb 2026
Withdrawal Update Form 3File: FORM 3_compressed (1).pdf4 Feb 2026
Withdrawal Update Form 1File: Form 1 30-06-2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 signed.pdf17 Oct 2025
Form 1File: Form 1.pdf6 Aug 2025
Form 2File: Form 2.pdf6 Aug 2025
Form 3File: Form 3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf6 Aug 2025
Form 1File: Form 1.pdf6 Aug 2025
Form 2File: Form 2.pdf6 Aug 2025
Form 3File: Form 3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf6 Aug 2025
Form 1File: Form 1.pdf6 Aug 2025
Form 2File: Form 2.pdf6 Aug 2025
Form 3File: Form 3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf6 Aug 2025
Form 1File: Form 1.pdf6 Aug 2025
Form 2File: Form 2.pdf6 Aug 2025
Form 3File: Form 3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf6 Aug 2025
Form 1File: Form 1.pdf6 Aug 2025
Form 2File: Form 2.pdf6 Aug 2025
Form 3File: Form 3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf6 Aug 2025
Form 1File: Form 1.pdf6 Aug 2025
Form 2File: Form 2.pdf6 Aug 2025
Form 3File: Form 3.pdf6 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold and Booked Inventory.pdf6 Aug 2025
Withdrawal Update Form 1File: Form 1 30-06-2025.pdf20 Jul 2025
Withdrawal Update Form 2File: Form 2 30-06-2025.pdf20 Jul 2025
Withdrawal Update Form 3File: Form 3 30-06-2025.pdf20 Jul 2025
Withdrawal Update Form 1File: Architect Certificate 31-03-2025.pdf10 Jun 2025
Withdrawal Update Form 2File: Engineers Certificate 31-03-2025.pdf10 Jun 2025
Withdrawal Update Form 3File: CA Certificate_March 25.pdf10 Jun 2025
Form 5 (FY 2022-2023)File: Form 5_FY 22-23.pdf9 Jun 2025
Form 5 (FY 2023-2024)File: Form 5_FY 23-24.pdf9 Jun 2025
Form 1File: Architect Certificate 31-03-2023.pdf8 Jun 2025
Form 2File: Engineers certificate 31-03-2023.pdf8 Jun 2025
Form 3File: Form 3_March 23.pdf8 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 31-03-2023.pdf8 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of Quarterly Progress.pdf8 Jun 2025
Form 1File: Architect Certificate 31-03-2024.pdf8 Jun 2025
Form 2File: Engineers Certificate 31-03-2024.pdf8 Jun 2025
Form 3File: CA Certificate_March 24.pdf8 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 31-03-2024.pdf8 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of Quarterly Progress.pdf8 Jun 2025
Form 1File: Architect Certificate 30-06-2024.pdf8 Jun 2025
Form 2File: Engineers certificate 30-06-2024.pdf8 Jun 2025
Form 3File: CA Certificate_June 24.pdf8 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 30-06-2024.pdf8 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of Quarterly Progress.pdf8 Jun 2025
Form 1File: Architect Certificate 30-09-2024.pdf8 Jun 2025
Form 2File: Engineers certificate 30-09-2024.pdf8 Jun 2025
Form 3File: CA Certificate_Sep 24.pdf8 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 30-09-2024.pdf8 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of Quarterly Progress.pdf8 Jun 2025
Form 1File: Architect Certificate 31-12-2024.pdf8 Jun 2025
Form 2File: Engineers certificate 31-12-2024.pdf8 Jun 2025
Form 3File: CA Certificate_Dec 24.pdf8 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 31-12-2024.pdf8 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of Quarterly Progress.pdf8 Jun 2025
Form 1File: Architect Certificate 31-03-2025.pdf8 Jun 2025
Form 2File: Engineers Certificate 31-03-2025.pdf8 Jun 2025
Form 3File: CA Certificate_March 25.pdf8 Jun 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure 31-03-2025.pdf8 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration of Quarterly Progress.pdf8 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architect Certificate 31-03-2024.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architect Certificate 30-06-2024.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architect Certificate 30-09-2024.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architect Certificate 31-12-2024.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architect Certificate 31-03-2025.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revised Architect Certificate 31-03-2023.pdf3 May 2025

How this compares with Pune

84%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep GIRNAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RASTA PETH13,700+ in Pune

2 kmGIRNARCompleted 161Lapsed / revoked 130Other 120Dot size: filed unitsN

Filed coordinates, straight-line distance. 411 registered projects within 2 km.

Builder: SHREE DATTA REALTORS

SHREE DATTA REALTORS has 1 registration on MahaRERA, including GIRNAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if GIRNAR is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of GIRNAR?

The registered promoter entity is SHREE DATTA REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in GIRNAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for GIRNAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at GIRNAR?

The professionals named in the filing: Architect: KOSHISH DHOOT; Engineer: PRASHANT P KADAM; Engineer: Shree Datta Realtors; Chartered Accountant: CA TRUPTI OSWAL; Chartered Accountant: Shailesh M Oswal & Associates; Chartered Accountant: R H Pothiwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in GIRNAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About GIRNAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save GIRNAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.