Home / Browse projects / Mumbai Suburban, Maharashtra / OPULENCE

Completed No litigation declared Residential / Group Housing project

OPULENCE

By SIDHIVINAYAK CONSTRUCTIONS

RG-MH-08704 · RERA P51800002068 · Last updated on MahaRERA portal: 25 Feb 2022

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

OPULENCE is a Residential / Group Housing project by SIDHIVINAYAK CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002068 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2020. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameOPULENCE
  • TypeResidential / Group Housing
  • Location
    • Chembur
    • Kurla
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002068
  • ReraGenie IDRG-MH-08704

Builder

  • NameSIDHIVINAYAK CONSTRUCTIONS
  • Entity typePartnership
  • PartnersSHRAVAN RAVINDER AGGARWAL, SATYEN MOHANLAL VELANI, KAUSHIK MAHENDRA VELANI, SIDHARTH MAHINDER AGGARWAL, KUSUM MAHINDER AGGARWAL
  • Other registrations5 more →
  • Completed4 of 6
  • Past their filed date1
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017First promiseDec 2018Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion30 Dec 2020
  • Revised completionRevised to 30 Dec 2020 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed94 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OPULENCENA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

OPULENCE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered62
Open Space2

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,564 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4221.96
Proposed, not sanctioned4,221 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGAUTAM GOVIND BUILDING AMBADI ROAD , VISHWAKARMA ESTATE VASAI WEST 401202

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBANSI WADHWA
EngineerS V PATEL
Chartered AccountantCA SHASHANK JAIN
Chartered AccountantCA PARAS THAKKAR
PartnerRole in project
SIDHIVINAYAK CONSTRUCTIONS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800000420Dec 2018 → Jun 2020

Reason as filed by the promoterThe New DCPR was introduced on 8th May 2018. It was supposed to be functional from 23rd June, 2018. Now for reason unexplained, they have delayed the implementation date to 1st September, 2018 as stated in Corrigendum to Notice No. TPB-4317/629/CR-118/2017/EP/UD-11, dt. 22/06/2018. This has caused serious challenge to our planning to execute the project by December, 2018, thereby resulting in delay in completion of project. In view of this, we request you to please give us an extension of the project upto 30/09/2019.

EXT51800003704Dec 2018 → Jun 2020

Reason as filed by the promoterWe would like to inform you that our completion date of our above project is 31.12.2018. The delay for the project "OPULENCE" is for the reasons which are genuine and stated below: The New DCPR was introduced on 8th May 2018. It was supposed to be functional from 23rd June, 2018. Now for reason unexplained, they have delayed the implementation date to 1st September, 2018 as stated in Corrigendum to Notice No. TPB-4317/629/CR-118/2017/EP/UD-11, dt. 22/06/2018. This has caused serious challenge to our planning to execute the project by December, 2018, thereby resulting in delay in completion of

EXT51800005858Dec 2018 → Jun 2020

Reason as filed by the promoterWe would like to inform you that we have taken consent to the proposed modification as required under the provision of the section 7(3) of the Act from majority of the allottees scan copy of the same is attached.Further this extension is due to time taken for implementation of New DCPR -2034 at ground level and getting Clearance from various departments. Our Structure is complete and we will apply for Fire NOC in this week and then for Final OC. We have started giving soft position for Fit Out.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Nov 2021

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Oppulence 2021.pdf25 Feb 2022
Certificates of CA (Form 3)File: Final Form-3 CA as on 31-03-2021_Compressed.pdf24 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC Letter.pdf15 Nov 2021
Architect’s Certificate on Completion of Project (Form 4)File: FROM-4 Architect Certificate.PDF15 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 03rd Quater.pdf8 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 03rd Quarter.pdf8 Jul 2021
Certificates of CA (Form 3)File: FORM-3 31122020 03rd Quarter.pdf8 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificte 01st Quarter.pdf3 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 2nd Quarter.pdf3 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 01st Quarter.pdf3 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate 2nd Quarter.pdf3 Jul 2021
Certificates of CA (Form 3)File: Form-3 Opulence 01st Quarter.pdf3 Jul 2021
Certificates of CA (Form 3)File: Form-3 Opulence 2nd Quarter.pdf3 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf3 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf3 Nov 2020
Certificates of CA (Form 3)File: Form-3.pdf3 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM-OPULENCE_Compressed.pdf13 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM-5 2020 OPULENCE.pdf13 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf2 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf2 Sep 2020
Details of encumbrancesFile: Encumbrance_Apurva.pdf19 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arcitect Certificate Purva CHS.PDF19 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Purva CHS.PDF19 Dec 2019
Certificates of CA (Form 3)File: Form 3 CA Final_Compressed.pdf19 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_Compressed.pdf26 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2_Compressed.pdf26 Nov 2019
Certificates of CA (Form 5)File: FORM-OPULENCE_Compressed.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.pdf31 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf31 Jul 2019
Details of encumbrancesFile: Encumbrance Letter_Opulence.PDF17 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Compressed.pdf17 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_Compressed.pdf17 May 2019
Certificates of CA (Form 3)File: Form-3_Compressed.pdf17 May 2019
Commencement Certificates / NA Order for plotted developmentFile: Opulance_ Full_CC.pdf16 May 2019
Details of encumbrancesFile: Encubrance Letter_Part1.pdf28 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Opulence_Architects Certificate_Form 1.PDF25 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Opulence_Engineers Certificate_Form 2.PDF25 Jan 2019
Certificates of CA (Form 3)File: FORM - 3 CA FINAL_Compressed.pdf25 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.PDF17 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.PDF17 Nov 2018
Certificates of CA (Form 3)File: FORM-3.pdf17 Nov 2018
Certificates of CA (Form 5)File: Opulence.pdf29 Sep 2018
Details of encumbrancesFile: ECUMBRA.pdf31 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.PDF30 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.PDF30 Jul 2018
Certificates of CA (Form 3)File: FORM-3.pdf30 Jul 2018
Details of encumbrancesFile: ENCUMBRANCES.PDF25 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1.pdf25 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2.pdf25 Apr 2018
Certificates of CA (Form 3)File: FORM-3 OPULENCE.pdf25 Apr 2018
Certificates of CA (Form 3)File: FORM-3 OPULENCE.pdf25 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: opulence society registration certificate.PDF27 Mar 2018
Layout approvalFile: Layout 1.pdf25 Jan 2018
Layout approvalFile: Layout 2.pdf25 Jan 2018
Layout approvalFile: Layout 3.pdf25 Jan 2018
Details of encumbrancesFile: Ebcumbrances Opulence.PDF25 Jan 2018
Copy of Layout Approval (in case of layout)File: Layout 1.pdf25 Jan 2018
Copy of Layout Approval (in case of layout)File: Layout 2.pdf25 Jan 2018
Copy of Layout Approval (in case of layout)File: Layout 3.pdf25 Jan 2018
Certificates of CA (Form 3)File: FORM-3.pdf25 Jan 2018
Certificates of CA (Form 3)File: ANNEXURE A.pdf25 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf24 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE_Compressed.pdf24 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE_Compressed.pdf24 Jan 2018
Declaration in FORM BFile: FORM B Opulence.pdf15 Nov 2017
Layout approvalFile: plan-opulence_Compressed.pdf31 Oct 2017
Layout approvalFile: amended till 19th floor part letter.pdf31 Oct 2017
Details of encumbrancesFile: No Encumbrance -Opulence.PDF31 Oct 2017
Copy of Layout Approval (in case of layout)File: plan-opulence_Compressed.pdf31 Oct 2017
Copy of Layout Approval (in case of layout)File: amended till 19th floor part letter.pdf31 Oct 2017
Proforma of Allotment letterFile: AGREEMENT.pdf31 Oct 2017
OtherFile: Declration Opulence.PDF31 Oct 2017
Layout approvalFile: New Doc 2017-07-25 (3)_1.pdf26 Jul 2017
Layout approvalFile: New Doc 2017-07-25 (3)_2.pdf26 Jul 2017
Layout approvalFile: New Doc 2017-07-25 (3)_3.pdf26 Jul 2017
Layout approvalFile: New Doc 2017-07-25 (3)_4.pdf26 Jul 2017
Layout approvalFile: New Doc 2017-07-25 (3)_5.pdf26 Jul 2017
Building plan approvalFile: IOD 1.pdf26 Jul 2017
Building plan approvalFile: IOD 2.pdf26 Jul 2017
PAN CardFile: PAN CARD.pdf26 Jul 2017

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise5 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Shivpuri Building No 10 CHS Ltd - Shivam HeightsKurla Mumbai 40007125CompletedDec 2020Dec 2020
OpulenceDeonar Mumbai - 40008868CompletedDec 2020Late, Sep 2021
Apurva CHSKurla Mumbai 40007172CompletedDec 2020Late, Jul 2021
SIDHIVINAYAK RESIDENCYPlot No 8 and Shivpuri Chembur Mumbai 40007123CompletedMar 2016Late, Jul 2016
ARUNDHATI HEIGHTSARUNDHATI CHS LTD Plot No 35 Swastik Park Chembur Mumbai 400 07123CompletedJan 2015Late, Sep 2015
PURBANI CHS LTDPLOT NO 38 SION TROMBAY ROAD CHEMBUR MUMBAI 40007114CompletedJul 2013Late, Jan 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OPULENCE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chembur6,700+ in Mumbai Suburban

2 kmOPULENCECompleted 19Lapsed / revoked 14Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: SIDHIVINAYAK CONSTRUCTIONS

SIDHIVINAYAK CONSTRUCTIONS has 6 registrations on MahaRERA, including APURVA and OPULENCE. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 6 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if OPULENCE is delayed beyond 30 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OPULENCE?

The registered promoter entity is SIDHIVINAYAK CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OPULENCE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OPULENCE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OPULENCE?

The professionals named in the filing: Architect: BANSI WADHWA; Engineer: S V PATEL; Chartered Accountant: CA SHASHANK JAIN; Chartered Accountant: CA PARAS THAKKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OPULENCE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OPULENCE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OPULENCE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.