Home / Browse projects / Pune, Maharashtra / Optima 2.0

Registered No litigation declared Others project

Optima 2.0

By M/S. SOBA ASSOCIATES

RG-MH-49590 · RERA P52100018793 · Last updated on MahaRERA portal: 22 Aug 2026

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
18 of 22Construction stages doneacross 2 buildings; furthest along: Installation of Lifts, 90%
11 of 177Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

Optima 2.0 is a Others project by M/S. SOBA ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100018793 on 5 Dec 2018. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 166 of the 177 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameOptima 2.0
  • TypeOthers
  • Location
    • SINHGAD ROAD
    • WADGAON BK
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100018793
  • ReraGenie IDRG-MH-49590

Builder

  • NameM/S. SOBA ASSOCIATES
  • Entity typePartnership
  • PartnersSEEDTREE DEVELOPERS THROUGH SAHIL VIVEK PRADHAN PRADHAN, SUNIL CHAMPALAL SOMANI, LALIT MOTILAL BAFNA
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2018First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Dec 2018
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2025)
  • Buildings2 building records
  • Documents filed146 files

Current status

94%166 of 177 units booked
89.2%Work done, per cost certificate

Figures as on 22 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING -GNA191288391
BUILDING -HNA191277986

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 90%.

BUILDING -G95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUILDING -H95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 22 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingYes50%
Community BuildingsYes75%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed180

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots180
Closed/Covered180
BuildingClosed/CoveredTotal
BUILDING -G9090
BUILDING -H9090

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,585 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI18644.0
Proposed, not sanctioned18,464 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Showroom No G2,Optima 2, Sihagad Road, Pune
Estimated costRs 67.00 cr
Cost incurredRs 59.74 cr
Work done89.16%
BuildingWingEstimatedIncurred
BUILDING -GNARs 33.50 crRs 26.24 cr
BUILDING -HNARs 33.50 crRs 33.50 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJAY AREM ARCHITECTURE & INTERIOR CONSULTANT
EngineerSushant Bondar
Chartered AccountantR M S & Associates
Chartered AccountantUmesh Jhawar & Associates
Chartered AccountantPriyesh Jain
PartnerRole in project
M/S. SOBA ASSOCIATES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30122519160Dec 2025 → Dec 2026

Reason as filed by the promoterThe Applicant respectfully submits that since April 2025, the pace of construction has been adversely affected, and certain works could not be commenced due to serious obstruction in road access to the project site. The Pune Municipal Corporation (PMC) has undertaken work in front of the project site, resulting in the creation of a large ditch, which has completely obstructed ingress and egress. Due to the said obstruction, transportation of construction materials has become extremely difficult, making it practically impossible to carry out the balance work. The Applicant has made several repr

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC12500658Rushikesh Shirish KulkarniM/S. SOBA ASSOCIATES24/02/2025
CC12600761AKASH ARJUNEM/S. SOBA ASSOCIATES10/02/2026
CC12601236Nikhilesh ShahM/S. SOBA ASSOCIATES07/03/2026
CC12601237Darshan ShahM/S. SOBA ASSOCIATES07/03/2026
CC12601503Vaibhav KulkarniM/S. SOBA ASSOCIATES18/03/2026
CC12602078Prithaviraj Shivaji DakreM/S. SOBA ASSOCIATES09/04/2026
CC12602133Sanjay Lalchand ShahM/S. SOBA ASSOCIATES11/04/2026
CC12602173Sachin Hanmantrao JadhavM/S. SOBA ASSOCIATES13/04/2026
CC12603790Venkat Nageshrao Subbaiah KomarashettyM/S. SOBA ASSOCIATES19/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A 20082026.pdf22 Aug 2026
Form 5 (FY 2025-2026)File: Form-5 RERA Audit FY 2025-26 System Generated 21082026.pdf21 Aug 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 27072026.pdf18 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 01072026.pdf18 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062026.pdf18 Aug 2026
Withdrawal Update Form 1File: Architect Certificate Form 1 (1).pdf20 Jul 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE 8-4-2026_0001.pdf20 Jul 2026
Withdrawal Update Form 3File: CA FORM 31032026.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 31122025.pdf22 Apr 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE 31-03-2024_0001.pdf22 Apr 2026
Withdrawal Update Form 3File: CA FORM 3 31122025.pdf22 Apr 2026
Form 2A (FY 2024-2025)File: FORM - 2 A (2024-25).pdf31 Dec 2025
Form 1File: FORM 1 01072025.pdf30 Dec 2025
Form 2File: ENGINEERS CERTIFICATE 30062025_.pdf30 Dec 2025
Form 3File: CA FORM 3 10072025_compressed.pdf30 Dec 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSER LETTER 30062025_0001.pdf30 Dec 2025
Form 1File: FROM 1 .pdf24 Oct 2025
Form 2File: ENGINEERS CERTIFICATE FORM -2.pdf24 Oct 2025
Form 3File: CA FORM 3.pdf24 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf24 Oct 2025
Form 5 (FY 2024-2025)File: FORM - 5_24-25.pdf30 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 June 2025.pdf21 Jul 2025
Certificates of CA (Form 3)File: Form 3 June 2025.pdf21 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2025.pdf21 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure June 2025.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 15-5-2025_0001.pdf24 May 2025
Certificates of CA (Form 3)File: Form 3 .pdf24 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 ENGINEERS CERTIFICATE 31-03-2025.pdf24 May 2025
Certificates of CA (Form 3)File: CA FORM 3 18-03-2025_0001_compressed.pdf4 Apr 2025
OtherFile: RESOLUTION - 2-04-2025_0001_page-0001.pdf4 Apr 2025
Certificates of CA (Form 3)File: Soba Form 3 -31-12-2024.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE FORM -2 31-12-2024.pdf19 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf19 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM -2A.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Soba Optima Form 5.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024 form -1.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE LETTER 31-12-2024.pdf7 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure 30 June 2024.pdf30 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure 30 Sep 2024.pdf30 Jan 2025
Certificates of CA (Form 3)File: CA FORM 3 Q1_2024.pdf21 Dec 2024
Certificates of CA (Form 3)File: CA FORM 3 30-09-2024.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 30-06-2024.pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 30-09-2024 (1).pdf21 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 31-03-2024_0001.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE LETTER 31-03-2024.pdf11 Jun 2024
Certificates of CA (Form 3)File: FORM 3 31-03-2024.pdf11 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 30-9-2023_0001_0001.pdf23 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 31-12-2023.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER LETTER 30-9-2023_0001_compressed.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSER LETTER 31-12-2023_0001_compressed.pdf23 Feb 2024
Certificates of CA (Form 3)File: CA FORM 30-9-2023_0001_compressed.pdf23 Feb 2024
Certificates of CA (Form 3)File: CA FORM 31-12-2023_0001_compressed.pdf23 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA FORM 5 22-23.pdf5 Jan 2024
Annual Audit Report of Statutory CA (Form 5)File: CA FORM 5 22-23.pdf17 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 31-03-2023_0001.pdf22 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 30-06-2023_0001.pdf22 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER LETTER 31-3-23_0001_compressed.pdf22 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER LETTER 30-06-23.pdf22 Sep 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER LETTER 30-06-23.pdf22 Sep 2023
Certificates of CA (Form 3)File: C A Form 31-3-23_0001_compressed.pdf22 Sep 2023
Certificates of CA (Form 3)File: C A Form 30-06-23_0001_compressed.pdf22 Sep 2023
Layout approvalFile: Layout 1-2_compressed.pdf19 Aug 2023
Building plan approvalFile: Plan 2-7_compressed.pdf19 Aug 2023
Building plan approvalFile: Plan 3-7_compressed.pdf19 Aug 2023
Building plan approvalFile: Plan 4-7_compressed.pdf19 Aug 2023
Building plan approvalFile: Plan 5-7_compressed.pdf19 Aug 2023
Building plan approvalFile: Plan 6-7_compressed.pdf19 Aug 2023
Building plan approvalFile: Plan 7-7_compressed.pdf19 Aug 2023
Copy of Layout Approval (in case of layout)File: Layout 1-2_compressed.pdf19 Aug 2023
Building Plan Approval (IOD)File: Plan 2-7_compressed.pdf19 Aug 2023
Building Plan Approval (IOD)File: Plan 3-7_compressed.pdf19 Aug 2023
Building Plan Approval (IOD)File: Plan 4-7_compressed.pdf19 Aug 2023
Building Plan Approval (IOD)File: Plan 5-7_compressed.pdf19 Aug 2023
Building Plan Approval (IOD)File: Plan 6-7_compressed.pdf19 Aug 2023
Building Plan Approval (IOD)File: Plan 7-7_compressed.pdf19 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: CC-3576-21.pdf19 Aug 2023
Certificates of CA (Form 3)File: CA Certificate 30062022.pdf20 Apr 2023
Certificates of CA (Form 3)File: CA Certificate 30092022.pdf20 Apr 2023
Certificates of CA (Form 3)File: CA Certificate 31122022.pdf20 Apr 2023

How this compares with Pune

94%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Optima 2.0 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADGAON BK13,700+ in Pune

Builder: M/S. SOBA ASSOCIATES

M/S SOBA ASSOCIATES has 2 registrations on MahaRERA, including SAFFRON -PHASE-II and Optima 2.0. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Optima 2.0 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Optima 2.0?

The registered promoter entity is M/S. SOBA ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Optima 2.0?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Optima 2.0?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Optima 2.0?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Optima 2.0?

The professionals named in the filing: Architect: JAY AREM ARCHITECTURE & INTERIOR CONSULTANT; Engineer: Sushant Bondar; Chartered Accountant: R M S & Associates; Chartered Accountant: Umesh Jhawar & Associates; Chartered Accountant: Priyesh Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Optima 2.0?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Optima 2.0. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Optima 2.0 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.