Home / Browse projects / Pune, Maharashtra / ONE BOAT CLUB

De-registered No litigation declared Residential / Group Housing project

ONE BOAT CLUB

By GOEL GANGA CONSTRUCTIONS AND REAL ESTATE PVT LTD

RG-MH-94389 · RERA P52100019356 · Last updated on MahaRERA portal: 12 Feb 2023

Source: official MahaRERA filing

Red flags

  • De-registered
  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 82%
1Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

ONE BOAT CLUB is a Residential / Group Housing project by GOEL GANGA CONSTRUCTIONS AND REAL ESTATE PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100019356 on 23 Jan 2019. Possession is promised by 31 Dec 2030. 1 complaint is on record with the regulator.

At a glance

Project

  • NameONE BOAT CLUB
  • TypeResidential / Group Housing
  • Location
    • BOAT CLUB ROAD
    • SANGAMWADI PUNE
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411001
  • Pincode411001
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019356
  • ReraGenie IDRG-MH-94389

Builder

  • NameGOEL GANGA CONSTRUCTIONS AND REAL ESTATE PVT LTD
  • Entity typeCompany
  • DirectorATUL JAIPRAKASH GOEL

Key dates

this monthRegisteredJan 2019PromisedDec 2030

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on23 Jan 2019
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings3 building records
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LGF TO FIFTEENTH FLOORNA240000
16-26 TH FLOORNA110000
27-36TH FLOORNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 12 Feb 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 82%.

LGF TO FIFTEENTH FLOOR11%
ActivityProgress
Excavation82%
Basement (if any)20%
Podiums (if any)0%
Plinth20%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
16-26 TH FLOOR0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
27-36TH FLOOR0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Feb 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed468

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots468
Closed/Covered180
Open Space288
BuildingClosed/CoveredOpen SpaceTotal
LGF TO FIFTEENTH FLOOR75120195
16-26 TH FLOOR5588143
27-36TH FLOOR5080130

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,028 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI45217.0
Proposed, not sanctioned27,217 sq m
Buildings approved3
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLAUKIK APARTMENT, GROUND FLOOR,PLOT NO 3, CTS NO 870 PUNE

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMalwadkar Architects
ArchitectABA ARCHITECTS
EngineerSIDDHESHWAR KULKARNI
Chartered AccountantSSAP & ASSOCIATES LLP
PartnerRole in project
GOEL GANGA CONSTRUCTIONS AND REAL ESTATE PVT LTD-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000167566Marvel Asta Constructions LLP Through its Partner Mr. Vishwajeet Subhash JhavarOne Boat Club Construction and Real Estate Pvt Ltd Through its Director Mr. Atul Jaiprakash Goel23/09/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: One boat new letter WITHDRAWAL.pdf12 Feb 2023
OtherFile: One Boat Club Constructions DEREGESTRATION.pdf7 Feb 2023
OtherFile: 16012023 Rera Withdrawal letter.pdf18 Jan 2023
OtherFile: 16012023 Rera withdrawal applocation.pdf18 Jan 2023
OtherFile: UNDERTAKING - ONE BOAT CLUB.pdf18 Jan 2023
OtherFile: BOAT CLUB RERA WITHDRAWAL.pdf26 Oct 2022
CERSAI detailsFile: CERSAI REPORT BOAT CLUB 2022.pdf2 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: THE HQ NEW FORMAT ENGINEER CERTIFICATE FORM 2.pdf20 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: THE HQ NEW FORMAT FORM 2 A.pdf20 Feb 2022
Layout approvalFile: BOAT CLUB DRG 1 MB.pdf19 Feb 2022
Building plan approvalFile: BOAT CLUB DRG 1 MB.pdf19 Feb 2022
Copy of Layout Approval (in case of layout)File: BOAT CLUB DRG 1 MB.pdf19 Feb 2022
Building Plan Approval (IOD)File: BOAT CLUB DRG 1 MB.pdf19 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Feb 2022
Declaration about Commencement CertificateFile: One Boat Club Format D CC.pdf19 Feb 2022
Declaration in FORM BFile: FORM B One Boat Club 1MB.pdf19 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE ONE BOAT CLUB_compressed.pdf19 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: THE HQ FORM 2 A QUALITY.pdf19 Feb 2022
Disclosure of sold/ booked inventoryFile: One Boat Club Disclosure of sold inventory_compressed.pdf19 Feb 2022
Certificates of CA (Form 3)File: ONE BOAT CLUB RERA FORM 3 31122021.pdf19 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: The HQForm 5 31032019.pdf19 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: The HQ Form 531032020.pdf19 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: The HQ Form 5 31032021.pdf19 Feb 2022
Proforma of Allotment letterFile: Boat Club Agreement RESIDENTIAL R0_compressed.pdf19 Feb 2022
Proforma of Allotment letterFile: THE HQ - AGR DRAFT updated on rera on 4-1-2020.pdf4 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BOAT CLUB ARCHITECT CERTIFICATE.pdf22 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BOAT CLUB.pdf16 Aug 2019
Form 2AFile: THE HQ FORM 2 A -.pdf11 Jul 2019
Proforma of Allotment letterFile: BOAT CLUB Agreement- Commercial 10062009.pdf11 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: boat club architect certificate COMMERCIAL.pdf18 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE BOAT CLUB COMMERCIAL UPTO 31-3-2019.pdf18 Apr 2019
Proforma of Allotment letterFile: BOAT CLUB agreement- Commercial- 17-4-2019.pdf18 Apr 2019
Layout approvalFile: MD DRAWING.pdf5 Apr 2019
Copy of Layout Approval (in case of layout)File: MD DRAWING.pdf5 Apr 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE BOAT CLUB.pdf5 Apr 2019
Certificates of CA (Form 3)File: CA CERTIFICATE BOAT CLUB_Compressed.pdf18 Jan 2019
Building plan approvalFile: IOD DECLARATION.pdf7 Jan 2019
Building Plan Approval (IOD)File: IOD DECLARATION.pdf7 Jan 2019
Certificates of CA (Form 5)File: FORM 5.pdf7 Jan 2019
Proforma of Allotment letterFile: AGREEMENT BOAT CLUB.pdf7 Jan 2019
OtherFile: SELF DECLARATION.pdf7 Jan 2019
Layout approvalFile: Boat Club Road LAYOUT.pdf5 Jan 2019
PAN CardFile: GG CONSTRUCTIONS AND REAL ESTATE PAN.pdf5 Jan 2019
Copy of the legal title reportFile: TITLE REPORT.pdf5 Jan 2019
Details of encumbrancesFile: Encumbrance certificate-28-12-2018.pdf5 Jan 2019
Copy of Layout Approval (in case of layout)File: Boat Club Road LAYOUT.pdf5 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: COMENCEMENT CERTIFICATE 1.pdf5 Jan 2019
Declaration in FORM BFile: FORM B BOAT CLUB.pdf5 Jan 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ONE BOAT CLUB on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANGAMWADI PUNE13,700+ in Pune

2 kmONE BOAT CLUBCompleted 15Lapsed / revoked 31Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 93 registered projects within 2 km.

Builder: GOEL GANGA CONSTRUCTIONS AND REAL ESTATE PVT LTD

GOEL GANGA CONSTRUCTIONS AND REAL ESTATE PVT LTD has 1 registration on MahaRERA, including ONE BOAT CLUB. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that ONE BOAT CLUB shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ONE BOAT CLUB is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ONE BOAT CLUB?

The registered promoter entity is GOEL GANGA CONSTRUCTIONS AND REAL ESTATE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ONE BOAT CLUB?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ONE BOAT CLUB?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ONE BOAT CLUB?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ONE BOAT CLUB?

The professionals named in the filing: Architect: Malwadkar Architects; Architect: ABA ARCHITECTS; Engineer: SIDDHESHWAR KULKARNI; Chartered Accountant: SSAP & ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ONE BOAT CLUB?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE BOAT CLUB. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE BOAT CLUB to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.