Home / Browse projects / Ratnagiri, Maharashtra / OMKAR SPANDAN

Completed No litigation declared Others project

OMKAR SPANDAN

By Prasad Prabhakar Waghdhare

RG-MH-06270 · RERA P52800053099 · Last updated on MahaRERA portal: 29 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 8 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Aug 2025Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
5 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

OMKAR SPANDAN is a Others project by Prasad Prabhakar Waghdhare in Ratnagiri, Maharashtra, registered with MahaRERA as P52800053099 on 16 Oct 2023. The registration is recorded completed; possession was promised by 31 Aug 2025. 29 of the 34 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameOMKAR SPANDAN
  • TypeOthers
  • Location
    • Ratnagiri Kajarghati Road
    • Ghag Math Nachane
    • Nachane (CT)
    • Ratnagiri
    • 415639
  • Pincode415639
  • RERA no.P52800053099
  • ReraGenie IDRG-MH-06270

Builder

  • NamePrasad Prabhakar Waghdhare
  • Entity typeIndividual
  • GSTIN27AAEPW0124D1Z2
  • Other registrations9 more →
  • Completed9 of 10
  • Declared earlier projects8 →

Key dates

this monthRegisteredOct 2023PromisedAug 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Oct 2023
  • Promised completion31 Aug 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed113 files

Current status

85%29 of 34 units booked
63.9%Work done, per cost certificate

Figures as on 29 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OMKAR SPANDANNA9828634

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

OMKAR SPANDAN: 85% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 29 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes55%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered9
Open Space30

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,140 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 May 2025

Approvals and building plan

Sanctioning authorityRatnagiri Municipal Council
Permissible FSI2581.32
Proposed, not sanctioned2,560 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMaruti Mandir, Ratnagiri
Estimated costRs 5.80 cr
Cost incurredRs 3.70 cr
Work done63.85%
BuildingWingEstimatedIncurred
OMKAR SPANDANNARs 5.80 crRs 3.70 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeentanjali V Mote
EngineerSandeep S Shetye
EngineerPrashant V Pawar
Chartered AccountantBhushan Mulye & Co
Chartered AccountantAbhilash B Mulye and Co
PartnerRole in project
Prasad Prabhakar Waghdhare-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 - Omkar Spandan.pdf29 Sep 2025
Form 1File: Form 1.pdf24 Sep 2025
Form 2File: Form 2.pdf24 Sep 2025
Form 3File: Form 3.pdf24 Sep 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold-Booked Inventory.pdf24 Sep 2025
Occupational CertificateFile: OMKAR SPANDAN FULL COMPLETION.pdf24 Sep 2025
Form 1File: Form 1.pdf23 Sep 2025
Form 2File: Form 2.pdf23 Sep 2025
Form 3File: Form 3 New.pdf23 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD.pdf23 Sep 2025
Form 2A (FY 2023-2024)File: 31-3-24.pdf26 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A 31-3-25.pdf26 Aug 2025
Form 5 (FY 2023-2024)File: Omkar Spandan Form 5.pdf25 Aug 2025
Form 1File: Form 1 - Architect Certificate.pdf22 Aug 2025
Form 2File: FORM 2 - Engineer Certificate.pdf22 Aug 2025
Form 3File: Form 3 - C A Certificate.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD - Omkar Spandan.pdf22 Aug 2025
Form 1File: Form 1.pdf22 Aug 2025
Form 2File: Form 2.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD.pdf22 Aug 2025
Form 1File: Form 1.pdf22 Aug 2025
Form 2File: Form 2.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD.pdf22 Aug 2025
Form 1File: Form 1 -Omkar Spandan.pdf22 Aug 2025
Form 2File: Form 2 - Omkar Spandan.pdf22 Aug 2025
Form 3File: Form 3 - Omkar Spandan.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold -Booked Inventory - Omkar Spandan.pdf22 Aug 2025
Form 1File: Form 1 Omkar Spandan.pdf22 Aug 2025
Form 2File: Form 2 Omkar Spandan.pdf22 Aug 2025
Form 3File: Form 3 Omkar Spandan.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - Book Inventry - Omkar Spandan.pdf22 Aug 2025
Withdrawal Update Form 1File: Form 1.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf19 Jul 2025
Form 1File: Form 1.pdf4 Jun 2025
Form 2File: Form 2.pdf4 Jun 2025
Form 3File: Form 3.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Booked Inventory.pdf4 Jun 2025
OthersFile: Form 2A.pdf4 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Booked Inventory.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Omkar Spandan.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Omkar Spandan.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Omkar Spandan.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Book Inventry - Omkar Spandan.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Omkar Spandan.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Omkar Spandan.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Omkar Spandan.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Book Inventry - Omkar Spandan.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Omkar Spandan.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Omkar Spandan.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Omkar Spandan.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Book Inventry - Omkar Spandan.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Omkar Spandan.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Omkar Spandan.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Omkar Spandan.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Omkar Spandan.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Omkar Spandan.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Booked Inventory - Omkar Spandan.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Omkar Spandan.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Omkar Spandan.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Booked Inventory - Omkar Spandan.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -Omkar Spandan.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Omkar Spandan.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold -Booked Inventory - Omkar Spandan.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Omkar Spandan Form 5.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Omkar Spandan Form 5.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Omkar Spandan Form 5.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf16 Apr 2024

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Suresh SmrutiTilak Ali Ratnagiri20CompletedJan 2018Oct 2017
Omkar SanjivaneeJoshi Paland Ratnagiri29CompletedMay 2017Feb 2017
Vikram prasad ArcadeTilka Lane Ratnagiri43CompletedApr 2017Oct 2016
Vishnupant Jogalekar sankulNear Damale school Maruti mandir Ratnagiri71CompletedMar 2017Jun 2016
Omkar ChaitanyaS V Road Maruti mandir Ratnagiri26CompletedMay 2016Oct 2015
Ganga Niwas AppartmnetShere Naka Ratnagiri37CompletedMay 2014Oct 2013
Omkar Swaroop ApartmentJoshi paland Ratnagiri20CompletedMay 2014Mar 2014
Rukmini ArcadeSahakar nagar Nachane Ratnagiri12CompletedDec 2013Mar 2013

How this compares with Ratnagiri

85%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep OMKAR SPANDAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghag Math Nachane1,100+ in Ratnagiri

Builder: Prasad Prabhakar Waghdhare

Prasad Prabhakar Waghdhare has 10 registrations on MahaRERA, including Suresh smruti and D. A. BHOSALE PLAZA. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if OMKAR SPANDAN is delayed beyond 31 Aug 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OMKAR SPANDAN?

The registered promoter entity is Prasad Prabhakar Waghdhare, an individual as per the filing. Its GSTIN 27AAEPW0124D1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OMKAR SPANDAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OMKAR SPANDAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OMKAR SPANDAN?

The professionals named in the filing: Architect: Geentanjali V Mote; Engineer: Sandeep S Shetye; Engineer: Prashant V Pawar; Chartered Accountant: Bhushan Mulye & Co; Chartered Accountant: Abhilash B Mulye and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OMKAR SPANDAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OMKAR SPANDAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OMKAR SPANDAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.