ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Omkar Residency A-Wing

Registered No litigation declared Others project

Omkar Residency A-Wing

By K K GROUP

RG-MH-65236 · RERA P51700046189 · Last updated on MahaRERA portal: 13 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 85%
15 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 133 documents Report an error

Omkar Residency A-Wing is a Others project by K K GROUP in Thane, Maharashtra, registered with MahaRERA as P51700046189 on 20 Jun 2022. Possession is promised by 13 Dec 2026. The completion date has moved by 12 months from the original filing. 21 of the 36 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameOmkar Residency A-Wing
  • TypeOthers
  • Location
    • Konkan Fene
    • Bhiwandi
    • Bhiwandi (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700046189
  • ReraGenie IDRG-MH-65236

Builder

  • NameK K GROUP
  • Entity typePartnership
  • PartnersBharat Jairamdas Jhanglani, Balakishan Chandraiah Kalyadapu, Mahesh Prabhakar Choughule, Meena Balkishan Yadap

Key dates

this monthRegisteredJun 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion13 Dec 2026
  • Revised completionRevised to 13 Dec 2026 (originally 13 Dec 2025)
  • Buildings1 building record
  • Documents filed133 files

Current status

58%21 of 36 units booked
59.5%Work done, per cost certificate

Figures as on 13 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Omkar Residency A-WingNA9028836

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

Omkar Residency A-Wing: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,923 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Oct 2025

Approvals and building plan

Permissible FSI4724.78
Proposed, not sanctioned1,975 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhiwandi Shakha, Makan Kramank-5, Prabhu Ali, Mandai, Bhiwandi
Estimated costRs 4.83 cr
Cost incurredRs 2.87 cr
Work done59.46%
BuildingWingEstimatedIncurred
Omkar Residency A-WingNARs 3.83 crRs 2.87 cr
-NARs 1.00 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPMC MASTERS
EngineerSPACE CONSULTING ENGINEERS
Chartered AccountantM JHANGLANI ASSOCIATES
PartnerRole in project
K K GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31012619669Dec 2025 → Dec 2026

Reason as filed by the promoterWe here by apply for extension of due date of completion & project for 12 months on the following grounds 1.Due to shortage of Manpower the Work got very slow and construction delayed 2. Due to very slow booking of flats the finacial part affected and project delayed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 13 Dec 2026

Documents filed133

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: arc Certificate.pdf13 Apr 2026
Withdrawal Update Form 1File: arc Certificate.pdf13 Apr 2026
Withdrawal Update Form 2File: eng certificate.pdf13 Apr 2026
Withdrawal Update Form 2File: eng certificate.pdf13 Apr 2026
Withdrawal Update Form 3File: Form 3 Oct to dec 25.pdf13 Apr 2026
Withdrawal Update Form 3File: Form 3 Oct to dec 25.pdf13 Apr 2026
Withdrawal Update Form 1File: arc Certificate.pdf16 Feb 2026
Withdrawal Update Form 2File: eng certificate.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3 KK group.pdf16 Feb 2026
Layout approvalFile: 4bc75d12-2245-44cd-b1a3-add2e4618fb6.pdf17 Jan 2026
Withdrawal Update Form 1File: arc jul25-sep25 .pdf17 Jan 2026
Withdrawal Update Form 1File: arc Certificate.pdf17 Jan 2026
Withdrawal Update Form 2File: eng jul25-sep25.pdf17 Jan 2026
Withdrawal Update Form 2File: eng certificate.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf17 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf14 Jan 2026
Withdrawal Update Form 2File: eng apr25-jun25.pdf14 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf14 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 1File: arc apr25-jun25 .pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 2File: eng jan25-mar25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Withdrawal Update Form 3File: Jan 25 to March 25.pdf5 Jan 2026
Form 2A (FY 2022-2023)File: quality assurance 22-23.pdf25 Dec 2025
Form 2A (FY 2023-2024)File: quality assurance 23-24.pdf25 Dec 2025
Form 2A (FY 2024-2025)File: quality assurance 24-25.pdf25 Dec 2025
Form 5 (FY 2022-2023)File: FY 22-23.pdf25 Dec 2025
Form 5 (FY 2023-2024)File: FY 23-24.pdf25 Dec 2025
Form 5 (FY 2024-2025)File: FY 24-25.pdf25 Dec 2025
Form 1File: ARCHTICH CERTIFICATE.pdf24 Dec 2025
Form 2File: ENGINER CERTIFICATE.pdf24 Dec 2025
Form 3File: FORM 3.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf24 Dec 2025
Form 1File: ARCHTICH CERTIFICATE.pdf24 Dec 2025
Form 2File: ENGINER CERTIFICATE.pdf24 Dec 2025
Form 3File: Form 3.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf24 Dec 2025
Form 1File: ARCHTICH CERTIFICATE.pdf24 Dec 2025
Form 2File: ENGINER CERTIFICATE.pdf24 Dec 2025
Form 3File: Oct 22 to Dec 22.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf24 Dec 2025
Form 1File: arc jan23-mar23.pdf24 Dec 2025
Form 2File: eng jan23-mar23.pdf24 Dec 2025
Form 3File: Jan 23 to March 23.pdf24 Dec 2025
Disclosure of Sold and Booked InventoryFile: dis jan23 mar23.pdf24 Dec 2025

How this compares with Thane

58%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Omkar Residency A-Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhiwandi7,600+ in Thane

2 kmOmkar Residency A-WingCompleted 30Lapsed / revoked 24Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 83 registered projects within 2 km.

Builder: K K GROUP

K K GROUP has 1 registration on MahaRERA, including Omkar Residency A-Wing. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Omkar Residency A-Wing is delayed beyond 13 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Omkar Residency A-Wing?

The registered promoter entity is K K GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Omkar Residency A-Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Omkar Residency A-Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Omkar Residency A-Wing?

The professionals named in the filing: Architect: PMC MASTERS; Engineer: SPACE CONSULTING ENGINEERS; Chartered Accountant: M JHANGLANI ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Omkar Residency A-Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Omkar Residency A-Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Omkar Residency A-Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.