Home / Browse projects / Ratnagiri, Maharashtra / OMKAR RAWOOL PARK

Registered No litigation declared Residential / Group Housing project

OMKAR RAWOOL PARK

By Prasad Prabhakar Waghdhare

RG-MH-82835 · RERA P52800033013 · Last updated on MahaRERA portal: 30 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 8 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
40 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

OMKAR RAWOOL PARK is a Residential / Group Housing project by Prasad Prabhakar Waghdhare in Ratnagiri, Maharashtra, registered with MahaRERA as P52800033013 on 3 Feb 2022. Possession is promised by 31 Dec 2026. 44 of the 84 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameOMKAR RAWOOL PARK
  • TypeResidential / Group Housing
  • Location
    • Internal Road
    • Near Polytechnic
    • Nachane (CT)
    • Ratnagiri
    • 415639
  • Pincode415639
  • RERA no.P52800033013
  • ReraGenie IDRG-MH-82835

Builder

  • NamePrasad Prabhakar Waghdhare
  • Entity typeIndividual
  • GSTIN27AAEPW0124D1Z2
  • Other registrations9 more →
  • Completed9 of 10
  • Declared earlier projects8 →

Key dates

this monthRegisteredFeb 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed125 files

Current status

52%44 of 84 units booked
90.4%Work done, per cost certificate

Figures as on 30 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OMKAR RAWOOL PARKNA8784084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

OMKAR RAWOOL PARK: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes85%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered41

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,022 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jun 2025

Approvals and building plan

Sanctioning authorityRatnagiri Municipal Council
Permissible FSI6758.08
Proposed, not sanctioned6,758 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhareghat Road, Jaystambh, Ratnagiri
Estimated costRs 14.49 cr
Cost incurredRs 13.10 cr
Work done90.39%
BuildingWingEstimatedIncurred
OMKAR RAWOOL PARKNARs 14.49 crRs 13.10 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSunil G Patil
ArchitectSunil Ganpatrao Patil
EngineerMilind Mahadev Pote
EngineerSandeep Shridhar Shetye
EngineerSandeep S Shetye
Chartered AccountantBhushan Mulye and Company Vishnu Devrukhkar
Chartered AccountantAbhilasha Bhushan Mulye
PartnerRole in project
Prasad Prabhakar Waghdhare-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Form 5 - Omkar Rawool Park.pdf30 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A 2025.pdf24 Sep 2025
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf24 Sep 2025
Form 5 (FY 2021-2022)File: Form 5 - 2021-2022.pdf24 Sep 2025
Form 5 (FY 2022-2023)File: Form 5 - 2022-2023.pdf24 Sep 2025
Form 5 (FY 2023-2024)File: Omkar Rawool Park Form 5.pdf24 Sep 2025
Withdrawal Update Form 1File: Form 1.pdf22 Sep 2025
Withdrawal Update Form 2File: Form 2.pdf22 Sep 2025
Withdrawal Update Form 3File: Form 3.pdf22 Sep 2025
Form 1File: Form 1.pdf4 Jun 2025
Form 2File: Form 2.pdf4 Jun 2025
Form 3File: Form 3.pdf4 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf4 Jun 2025
OthersFile: Form 2A.pdf4 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Omkar Rawool Park.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Omkar Rawool Park.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Book Inventry - Omkar Rawool Park.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Omkar Rawool Park.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Omkar Rawool Park.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Omkar Rawool Park.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Book Inventry - Omkar Rawool Park.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Omkar Rawool Park.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Omkar Rawool Park.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Omkar Rawool Park.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Omkar Rawool Park.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - Book Inventry - Omkar Rawool Park.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Omkar Rawool Park.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Omkar Rawool Park.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Omkar Rawool Park.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Omkar Rawool Park.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Omkar Rawool Park.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold -Booked Inventory - Omkar Rawool Park.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Omkar Rawool Park.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Omkar Rawool Park.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold -Booked Inventory - Omkar Rawool Park.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Omkar Rawool Park.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Omkar Rawool Park.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold -Booked Inventory - Omkar Rawool Park.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Omkar Rawool Park Form 5.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Omkar Rawool Park Form 5.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Omkar Rawool Park Form 5.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf29 Mar 2024
Layout approvalFile: 1.pdf21 Mar 2024
Layout approvalFile: 2.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: 1.pdf21 Mar 2024
Copy of Layout Approval (in case of layout)File: 2.pdf21 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf16 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - OMKAR AMANORA.pdf16 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - C A Certificate.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - OMKAR AMANORA.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate.pdf16 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Omkar Amonora Rawool Park Form 5.pdf18 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf13 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf19 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf19 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf19 Apr 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - OMKAR AMANORA.pdf19 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate.pdf19 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate.pdf16 Jan 2023

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Suresh SmrutiTilak Ali Ratnagiri20CompletedJan 2018Oct 2017
Omkar SanjivaneeJoshi Paland Ratnagiri29CompletedMay 2017Feb 2017
Vikram prasad ArcadeTilka Lane Ratnagiri43CompletedApr 2017Oct 2016
Vishnupant Jogalekar sankulNear Damale school Maruti mandir Ratnagiri71CompletedMar 2017Jun 2016
Omkar ChaitanyaS V Road Maruti mandir Ratnagiri26CompletedMay 2016Oct 2015
Ganga Niwas AppartmnetShere Naka Ratnagiri37CompletedMay 2014Oct 2013
Omkar Swaroop ApartmentJoshi paland Ratnagiri20CompletedMay 2014Mar 2014
Rukmini ArcadeSahakar nagar Nachane Ratnagiri12CompletedDec 2013Mar 2013

How this compares with Ratnagiri

52%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep OMKAR RAWOOL PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Polytechnic1,100+ in Ratnagiri

Builder: Prasad Prabhakar Waghdhare

Prasad Prabhakar Waghdhare has 10 registrations on MahaRERA, including Suresh smruti and D. A. BHOSALE PLAZA. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if OMKAR RAWOOL PARK is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OMKAR RAWOOL PARK?

The registered promoter entity is Prasad Prabhakar Waghdhare, an individual as per the filing. Its GSTIN 27AAEPW0124D1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OMKAR RAWOOL PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OMKAR RAWOOL PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OMKAR RAWOOL PARK?

The professionals named in the filing: Architect: Sunil G Patil; Architect: Sunil Ganpatrao Patil; Engineer: Milind Mahadev Pote; Engineer: Sandeep Shridhar Shetye; Engineer: Sandeep S Shetye; Chartered Accountant: Bhushan Mulye and Company Vishnu Devrukhkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OMKAR RAWOOL PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OMKAR RAWOOL PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OMKAR RAWOOL PARK to a free account