ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Om Yashodhan CHSL

Registered No litigation declared Residential / Group Housing project

Om Yashodhan CHSL

By SILVER STONE REALTY

RG-MH-18799 · RERA P51700077611 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 80%
14 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 118 documents Report an error

Om Yashodhan CHSL is a Residential / Group Housing project by SILVER STONE REALTY in Thane, Maharashtra, registered with MahaRERA as P51700077611 on 15 Oct 2024. Possession is promised by 5 Nov 2026. 4 of the 18 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameOm Yashodhan CHSL
  • TypeResidential / Group Housing
  • Location
    • Sahayog Mandir Road
    • Ghantali
    • Naupada
    • Thane West
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077611
  • ReraGenie IDRG-MH-18799

Builder

  • NameSILVER STONE REALTY
  • Entity typePartnership
  • PartnerDilip Jaykumar Bidkar
  • PartnerSUNIL LIMAYE

Key dates

this monthRegisteredOct 2024PromisedNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Oct 2024
  • Promised completion5 Nov 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed118 files

Current status

22%4 of 18 units booked
68.1%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Om Yashodhan CHSLNA9818018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

Om Yashodhan CHSL: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered17
Open Space17

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area435 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 May 2025
LandownerVillageDistrict
Om Yashodhan CHSLThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI1400.42
Proposed, not sanctioned1,400 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Glenmorgan, Veer Savarkar Marg, Panchpakhadi, Thane W.400602
Estimated costRs 5.24 cr
Cost incurredRs 3.57 cr
Work done68.12%
BuildingWingEstimatedIncurred
Om Yashodhan CHSLNARs 4.49 crRs 3.45 cr
-NARs 75.00 lakhRs 11.25 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVrushali Sainath Naik
ArchitectMAKESPACE CONSULTANTS IND. PVT. LTD.
EngineerVishal Raghwani
EngineerBrixwell Engineering
Chartered AccountantAniruddh Kulkarni & Associates
Chartered AccountantAniruddh Ramesh Kulkarni
Chartered AccountantY J Padhye & Co
Chartered AccountantRUPALI LAUKIK GODBOLE
PartnerRole in project
SILVER STONE REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 5 Nov 2026

Documents filed118

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 118 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q4.pdf23 Apr 2026
Withdrawal Update Form 2File: FORM 2 Q4.pdf23 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 25 26 Om yashodhan - Signed.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1- Oct to Dec 2025.pdf24 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf24 Jan 2026
Withdrawal Update Form 3File: Final Signed Form 3 of Om Yashodhan CHSL FY 2025-26 Q3.pdf24 Jan 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE DT. 14-10-2025 MAKE SPACE CONSULTANTS IND. PVT. LTD..pdf4 Nov 2025
Withdrawal Update Form 2File: FORM 2 ENGINEERS CERTIFICATE.pdf4 Nov 2025
Withdrawal Update Form 3File: Signed Application Form 3 of Om Yashodhan CHS - Final.pdf4 Nov 2025
Form 2A (FY 2024-2025)File: Sign FORM 2A ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE CERTIFICATE FOR FY 2024-25.pdf8 Oct 2025
Withdrawal Update Form 1File: FORM 1_APRIL 2025 TO JUNE -2025.pdf27 Sep 2025
Withdrawal Update Form 2File: FORM-2 FOR Q1 FY 2025-26 ENGINEERu0027S CERTIFICATE.pdf27 Sep 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 Sign.pdf27 Sep 2025
Form 5 (FY 2024-2025)File: Sign Silver stone realty form 5 fy 24 25.pdf26 Sep 2025
Withdrawal Update Form 1File: FORM 1_APRIL 2025 TO JUNE -2025.pdf5 Aug 2025
Withdrawal Update Form 2File: FORM-2 FOR Q1 FY 2025-26 ENGINEERu0027S CERTIFICATE.pdf5 Aug 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 Sign.pdf5 Aug 2025
Form 1File: 1 ARCHITECT CERTIFICATE-FORM1_OCT TO DEC (1).pdf26 May 2025
Form 2File: 2 ENGINEER'S CERTIFICATE-FORM 2 FOR Q3(OCTOBER TO DECEMBER-2024).pdf26 May 2025
Form 3File: 3 Signed form 3-Q3 of Om Yashodhan CHS.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure of Sold and Booked Inventory Om Yashodhan CHSL.pdf26 May 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Q3 FY 2024-25.pdf26 May 2025
Form 1File: 1 Form 1 Q4 Architect Certificate om yasho-Jan-2025 TO Mar-2025.pdf26 May 2025
Form 2File: 2 Form 2 Q4 Engineers Certificate Om Yashodhan.pdf26 May 2025
Form 3File: 3 Form 3 Q4 of Om Yashodhan CHS.pdf26 May 2025
Disclosure of Sold and Booked InventoryFile: 4 Disclosure of Sold Inventory Q4.pdf26 May 2025
Self-declaration of Quarterly ProgressFile: 5 Self Declaration Q4 FY 2024-25.pdf26 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 ARCHITECT CERTIFICATE-FORM1_OCT TO DEC (1).pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Signed form 3-Q3 of Om Yashodhan CHS.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 ENGINEER'S CERTIFICATE-FORM 2 FOR Q3(OCTOBER TO DECEMBER-2024).pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Revised Form 3 - Om Yashodhan Final.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Revised Form 3 - Om Yashodhan Final.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Revised Form 3 - Om Yashodhan Final.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Revised Form 3 - Om Yashodhan Final.pdf7 Oct 2024
Proforma of Allotment letterFile: 15 REVISED ALLOTMENT LETTER FOR RERA - OM YASHODHAN_0001.pdf9 Aug 2024
Proforma of Agreement for saleFile: 14 Agreement for Sale - new.pdf9 Aug 2024
Proforma of Allotment letterFile: 15 REVISED ALLOTMENT LETTER FOR RERA - OM YASHODHAN_0001.pdf9 Aug 2024
Proforma of Agreement for saleFile: 14 Agreement for Sale - new.pdf9 Aug 2024
Proforma of Allotment letterFile: 15 REVISED ALLOTMENT LETTER FOR RERA - OM YASHODHAN_0001.pdf9 Aug 2024
Proforma of Agreement for saleFile: 14 Agreement for Sale - new.pdf9 Aug 2024
Details of encumbrances concerned to FinanceFile: 3 ENCUMBRANCES FINANCE.pdf8 Aug 2024
Deviation Report with respect to Allotment letterFile: 19 DEVIATION REPORT FOR ALLOTMENT LETTER - OM YASHODHAN.pdf8 Aug 2024
Details of encumbrances concerned to LegalFile: 3 ENCUMBRANCES FINANCE.pdf8 Aug 2024
Deviation Report with respect to model copy of AgreementFile: 18 DEVIATION REPORT OF AFS.pdf8 Aug 2024
Details of encumbrances concerned to FinanceFile: 3 ENCUMBRANCES FINANCE.pdf8 Aug 2024
Deviation Report with respect to Allotment letterFile: 19 DEVIATION REPORT FOR ALLOTMENT LETTER - OM YASHODHAN.pdf8 Aug 2024
Details of encumbrances concerned to LegalFile: 3 ENCUMBRANCES FINANCE.pdf8 Aug 2024
Deviation Report with respect to model copy of AgreementFile: 18 DEVIATION REPORT OF AFS.pdf8 Aug 2024
Details of encumbrances concerned to FinanceFile: 3 ENCUMBRANCES FINANCE.pdf8 Aug 2024
Deviation Report with respect to Allotment letterFile: 19 DEVIATION REPORT FOR ALLOTMENT LETTER - OM YASHODHAN.pdf8 Aug 2024
Details of encumbrances concerned to LegalFile: 3 ENCUMBRANCES FINANCE.pdf8 Aug 2024
Deviation Report with respect to model copy of AgreementFile: 18 DEVIATION REPORT OF AFS.pdf8 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 21 FORMAT A - OM YASHODHAN CHSL.pdf25 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 22 BANK LETTER FOR ACCOUNT OPENING CONFIRMATION FOR RERA-OM YASHODHAN CHSL.pdf25 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 21 FORMAT A - OM YASHODHAN CHSL.pdf25 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 22 BANK LETTER FOR ACCOUNT OPENING CONFIRMATION FOR RERA-OM YASHODHAN CHSL.pdf25 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 21 FORMAT A - OM YASHODHAN CHSL.pdf25 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 22 BANK LETTER FOR ACCOUNT OPENING CONFIRMATION FOR RERA-OM YASHODHAN CHSL.pdf25 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: 20 DISCLOSURE LOAN.pdf24 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: 20 DISCLOSURE LOAN.pdf24 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: 20 DISCLOSURE LOAN.pdf24 Jul 2024
Declaration in FORM BFile: 8 AFFIDAVIT CUM DECLARATION - BY PROMOTER - FORM B.pdf28 Jun 2024
CERSAI detailsFile: 11 CERSAI_Search_Report_200311800552_For_Asset_Based_Search_28_06_2024_13_23_19_139.pdf28 Jun 2024
Declaration in FORM BFile: 8 AFFIDAVIT CUM DECLARATION - BY PROMOTER - FORM B.pdf28 Jun 2024
CERSAI detailsFile: 11 CERSAI_Search_Report_200311800552_For_Asset_Based_Search_28_06_2024_13_23_19_139.pdf28 Jun 2024
Declaration in FORM BFile: 8 AFFIDAVIT CUM DECLARATION - BY PROMOTER - FORM B.pdf28 Jun 2024
CERSAI detailsFile: 11 CERSAI_Search_Report_200311800552_For_Asset_Based_Search_28_06_2024_13_23_19_139.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 - Engineer Certificate.pdf12 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 - Engineer Certificate.pdf12 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 - Engineer Certificate.pdf12 Jun 2024
Building plan approvalFile: 5 Building Layout 2.pdf7 Jun 2024
Building plan approvalFile: 5 Building Layout.pdf7 Jun 2024
Layout approvalFile: 4 Plan layout.pdf7 Jun 2024
Building plan approvalFile: 5 Building Layout 2.pdf7 Jun 2024
Building plan approvalFile: 5 Building Layout.pdf7 Jun 2024
Layout approvalFile: 4 Plan layout.pdf7 Jun 2024
Building plan approvalFile: 5 Building Layout 2.pdf7 Jun 2024
Building plan approvalFile: 5 Building Layout.pdf7 Jun 2024
Layout approvalFile: 4 Plan layout.pdf7 Jun 2024
PAN CardFile: 1 SILVER STONE REALTY PAN.pdf7 Jun 2024

How this compares with Thane

22%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Om Yashodhan CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane West7,600+ in Thane

2 kmOm Yashodhan CHSLCompleted 175Lapsed / revoked 64Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: SILVER STONE REALTY

SILVER STONE REALTY has 1 registration on MahaRERA, including Om Yashodhan CHSL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Om Yashodhan CHSL is delayed beyond 5 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Om Yashodhan CHSL?

The registered promoter entity is SILVER STONE REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Om Yashodhan CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Om Yashodhan CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Om Yashodhan CHSL?

The professionals named in the filing: Architect: Vrushali Sainath Naik; Architect: MAKESPACE CONSULTANTS IND. PVT. LTD.; Engineer: Vishal Raghwani; Engineer: Brixwell Engineering; Chartered Accountant: Aniruddh Kulkarni & Associates; Chartered Accountant: Aniruddh Ramesh Kulkarni. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Om Yashodhan CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Om Yashodhan CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Om Yashodhan CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.