Home / Browse projects / Thane, Maharashtra / OM SAI HOME
OM SAI HOME
RG-MH-02803 · RERA P51700019911 · Last updated on MahaRERA portal: 29 May 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OM SAI HOME is a Residential / Group Housing project by M/S. INFINI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700019911 on 13 Mar 2019. The registration is recorded completed; possession was promised by 30 Jun 2024.
At a glance
Project
- NameOM SAI HOME
- TypeResidential / Group Housing
- Location
- BHIWANDI KALYAN ROAD NR SAI BABA TEMPLE
- TEMGHAR
- Bhiwandi (M Corp.)
- Bhiwandi
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700019911
- ReraGenie IDRG-MH-02803
Builder
- NameM/S. INFINI DEVELOPERS
- Entity typePartnership
- Other registrations2 more →
- Completed3 of 3
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on13 Mar 2019
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings1 building record
- Documents filed95 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| OM SAI HOME BUILDING C | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
OM SAI HOME BUILDING C: 87% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85% |
Progress on shared amenities15
As on 29 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 85% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 75% |
| Street Lighting | Yes | 95% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | Yes | 95% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 85% |
| Open Parking | Yes | 80% |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | shamim ahmed am khan |
| Engineer | SHAMIM AHMED AM KHAN |
| Chartered Accountant | NITIN B DHAVAN & CO |
| Partner | Role in project |
|---|---|
| M/S. INFINI DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Mar 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Mar 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 14 May 2024
Documents filed95
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JUNE 2023.pdf | 29 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JUNE 2023.pdf | 29 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc c building.pdf | 14 May 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf | 14 May 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOC REGISTRATION CERTIFICATE C BUILDING.pdf | 18 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a march 22.pdf | 24 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a march 23.pdf | 24 Aug 2023 |
| Certificates of CA (Form 3)File: from 3 june2023.pdf | 24 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 22-23.pdf | 24 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22.pdf | 24 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JUNE 19_5_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 sep 19_12_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: dec 19 form 1_1_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 march 20_9_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 june 20_6_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 sep 20_13_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dec 20_2_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: march 21 form 1_17_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: june 21 form 1_16_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SEPT 21_14_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 DEC 21_3_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 22_10_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 JUNE 22_7_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 SEPT 22_15_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 DEC 22_4_11zon.pdf | 13 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 MARCH 23_11_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 june 19_5_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 19_12_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 19_1_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: march 20 form 2_16_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 june 20_6_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 20_13_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 20_2_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 march 21_9_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 june 21_7_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 21_14_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 21_3_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 march 22_10_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 june 22_8_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 sep 22_15_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 22_4_11zon.pdf | 13 May 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 march 23_11_11zon.pdf | 13 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a march 20.pdf | 13 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a march 21.pdf | 13 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a march 22.pdf | 13 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a march 23_4_11zon.pdf | 13 May 2023 |
| Disclosure of sold/ booked inventoryFile: dirsclosure of sold unsold.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 JUNE 19_5_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 SEPT 19_13_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 DEC 19_1_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 MARCH 20_9_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 JUNE 20_6_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 SEPT 20_14_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 DEC 20_2_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 MARCH 21_10_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 JUNE 21_7_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 SEPT 21_15_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 DEC 21_3_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 MARCH 22_11_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 JUNE 22_8_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 SEPT 22_16_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 DEC 22_4_11zon.pdf | 13 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 MARCH 23_12_11zon.pdf | 13 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20_1_11zon.pdf | 13 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21_2_11zon.pdf | 13 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 21-22_3_11zon.pdf | 13 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 22-23_4_11zon.pdf | 13 May 2023 |
| PAN CardFile: Pan Card.pdf | 6 Jan 2022 |
| Declaration about Commencement CertificateFile: FORMAT-D.pdf | 6 Jan 2022 |
| Building plan approvalFile: HPSCANNER0278 - Sheet-1.pdf | 5 Jan 2022 |
| Building plan approvalFile: HPSCANNER0277 - Sheet-2.pdf | 5 Jan 2022 |
| Building plan approvalFile: HPSCANNER0224-Sheet-3.pdf | 5 Jan 2022 |
| Building plan approvalFile: HPSCANNER0275 - Sheet-4.pdf | 5 Jan 2022 |
| Building Plan Approval (IOD)File: HPSCANNER0278 - Sheet-1.pdf | 5 Jan 2022 |
| Building Plan Approval (IOD)File: HPSCANNER0277 - Sheet-2.pdf | 5 Jan 2022 |
| Building Plan Approval (IOD)File: HPSCANNER0224-Sheet-3.pdf | 5 Jan 2022 |
| Building Plan Approval (IOD)File: HPSCANNER0275 - Sheet-4.pdf | 5 Jan 2022 |
| OtherFile: Consent for Amendment.pdf | 5 Jan 2022 |
| Building plan approvalFile: SHEET 1 PLAN COPY.pdf | 2 Mar 2019 |
| Building plan approvalFile: SHEET 2 COMPRESSED.pdf | 2 Mar 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 95 filed documents as one ZIP, foldered, with a manifest
Keep OM SAI HOME on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TEMGHAR7,600+ in Thane
Filed coordinates, straight-line distance. 48 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: M/S. INFINI DEVELOPERS
M/S. INFINI DEVELOPERS has 3 registrations on MahaRERA, including OM SAI HOME and OM SAI HOME. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if OM SAI HOME is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OM SAI HOME?
The registered promoter entity is M/S. INFINI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OM SAI HOME?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for OM SAI HOME?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OM SAI HOME?
The professionals named in the filing: Architect: shamim ahmed am khan; Engineer: SHAMIM AHMED AM KHAN; Chartered Accountant: NITIN B DHAVAN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OM SAI HOME?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback