Home / Browse projects / Thane, Maharashtra / OM SAI CLASSIC
OM SAI CLASSIC
RG-MH-29692 · RERA P51700028873 · Last updated on MahaRERA portal: 6 Jun 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
OM SAI CLASSIC is a Residential / Group Housing project by D A CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700028873 on 5 Apr 2021. The registration is recorded completed; possession was promised by 30 Jun 2025. 60 of the 79 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.
At a glance
Project
- NameOM SAI CLASSIC
- TypeResidential / Group Housing
- Location
- C.T.S. NO. 9378
- SURVEY NO. 131/8/1/B
- AMBERNATH VILLAGE
- Ambarnath(M Cl)
- Ambarnath
- Thane
- 421501
- Pincode421501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700028873
- ReraGenie IDRG-MH-29692
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on5 Apr 2021
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings2 building records
- Documents filed115 files
Current status
Figures as on 6 Jun 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PLOT A | NA | 9 | 8 | 28 | 5 | 33 |
| PLOT B | NA | 11 | 8 | 35 | 11 | 46 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
PLOT A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
PLOT B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 6 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed54
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| PLOT A | 4 | 15 | 19 |
| PLOT B | 20 | 15 | 35 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AKHIL ANIL DESAI |
| Engineer | ATUL KUDTARKAR AND ASSOCIATES |
| Engineer | AKHIL ANIL DESAI |
| Chartered Accountant | YOGESH NANDA AND ASSOCIATES |
| Chartered Accountant | R.B. SINGH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| D A CONSTRUCTION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Apr 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2021-2022)File: FORM 2A CLASSIC 31 03 2022.pdf | 6 Jun 2025 |
| Form 2A (FY 2022-2023)File: FORM 2A CLASSIC 31 03 2023.pdf | 6 Jun 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A CLASSIC 31 03 2024.pdf | 6 Jun 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A CLASSIC 31 03 2025.pdf | 6 Jun 2025 |
| Occupational CertificateFile: O C OM SAI CLASSIC.pdf | 6 Jun 2025 |
| Form 1File: 1 ARCHITECT 30 06 2021.pdf | 5 Jun 2025 |
| Form 2File: 17 ENGINEER 30 06 2021.pdf | 5 Jun 2025 |
| Form 3File: 33 FORM 3 CA 30 06 2021.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 49 SOLD UNSOLD QTRLY UPDATE 30 06 2021.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 49 SOLD UNSOLD QTRLY UPDATE 30 06 2021.pdf | 5 Jun 2025 |
| Form 1File: 2 ARCHITECT 30 09 2021.pdf | 5 Jun 2025 |
| Form 2File: 18 ENGINEER 30 09 2021.pdf | 5 Jun 2025 |
| Form 3File: 34 FORM 3 CA 30 09 2021.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 50 SOLD UNSOLD QTRLY UPDATE 30 09 2021.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 50 SOLD UNSOLD QTRLY UPDATE 30 09 2021.pdf | 5 Jun 2025 |
| Form 1File: 3 ARCHITECT 31 12 2021.pdf | 5 Jun 2025 |
| Form 2File: 19 ENGINEER 31 12 2021.pdf | 5 Jun 2025 |
| Form 3File: 35 FORM 3 CA 31 12 2021.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 51 SOLD UNSOLD QTRLY UPDATE 31 12 2021.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 51 SOLD UNSOLD QTRLY UPDATE 31 12 2021.pdf | 5 Jun 2025 |
| Form 1File: 4 ARCHITECT 31 03 2022.pdf | 5 Jun 2025 |
| Form 2File: 20 ENGINEER 31 03 2022.pdf | 5 Jun 2025 |
| Form 3File: 36 FORM 3 CA 31 03 2022.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 52 SOLD UNSOLD QTRLY UPDATE 31 03 2022.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 52 SOLD UNSOLD QTRLY UPDATE 31 03 2022.pdf | 5 Jun 2025 |
| Form 1File: 5 ARCHITECT 30 06 2022.pdf | 5 Jun 2025 |
| Form 2File: 21 ENGINEER 30 06 2022.pdf | 5 Jun 2025 |
| Form 3File: 37 FORM 3 CA 30 06 2022.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 53 SOLD UNSOLD QTRLY UPDATE 30 06 2022.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 53 SOLD UNSOLD QTRLY UPDATE 30 06 2022.pdf | 5 Jun 2025 |
| Form 1File: 6 ARCHITECT 30 09 2022.pdf | 5 Jun 2025 |
| Form 2File: 22 ENGINEER 30 09 2022.pdf | 5 Jun 2025 |
| Form 3File: 38 FORM 3 CA 30 09 2022.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 54 SOLD UNSOLD QTRLY UPDATE 30 09 2022.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 54 SOLD UNSOLD QTRLY UPDATE 30 09 2022.pdf | 5 Jun 2025 |
| Form 1File: 7 ARCHITECT 31 12 2022.pdf | 5 Jun 2025 |
| Form 2File: 23 ENGINEER 31 12 2022.pdf | 5 Jun 2025 |
| Form 3File: 39 FORM 3 CA 31 12 2022.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 55 SOLD UNSOLD QTRLY UPDATE 31 12 2022.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 55 SOLD UNSOLD QTRLY UPDATE 31 12 2022.pdf | 5 Jun 2025 |
| Form 1File: 8 ARCHITECT 31 03 2023.pdf | 5 Jun 2025 |
| Form 2File: 24 ENGINEER 31 03 2023.pdf | 5 Jun 2025 |
| Form 3File: 40 FORM 3 CA 31 03 2023.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 56 SOLD UNSOLD QTRLY UPDATE 31 03 2023.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 56 SOLD UNSOLD QTRLY UPDATE 31 03 2023.pdf | 5 Jun 2025 |
| Form 1File: 9 ARCHITECT 30 06 2023.pdf | 5 Jun 2025 |
| Form 2File: 25 ENGINEER 30 06 2023.pdf | 5 Jun 2025 |
| Form 3File: 41 FORM 3 CA 30 06 2023.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 57 SOLD UNSOLD QTRLY UPDATE 30 06 2023.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 57 SOLD UNSOLD QTRLY UPDATE 30 06 2023.pdf | 5 Jun 2025 |
| Form 1File: 10 ARCHITECT 30 09 2023.pdf | 5 Jun 2025 |
| Form 2File: 26 ENGINEER 30 09 2023.pdf | 5 Jun 2025 |
| Form 3File: 42 FORM 3 CA 30 09 2023.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 58 SOLD UNSOLD QTRLY UPDATE 30 09 2023.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 58 SOLD UNSOLD QTRLY UPDATE 30 09 2023.pdf | 5 Jun 2025 |
| Form 1File: 11 ARCHITECT 31 12 2023.pdf | 5 Jun 2025 |
| Form 2File: 27 ENGINEER 31 12 2023.pdf | 5 Jun 2025 |
| Form 3File: 43 FORM 3 CA 31 12 2023.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 59 SOLD UNSOLD QTRLY UPDATE 31 12 2023.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 59 SOLD UNSOLD QTRLY UPDATE 31 12 2023.pdf | 5 Jun 2025 |
| Form 1File: 12 ARCHITECT 31 03 2024.pdf | 5 Jun 2025 |
| Form 2File: 28 ENGINEER 31 03 2024.pdf | 5 Jun 2025 |
| Form 3File: 44 FORM 3 CA 31 03 2024.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 60 SOLD UNSOLD QTRLY UPDATE 31 03 2024.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 60 SOLD UNSOLD QTRLY UPDATE 31 03 2024.pdf | 5 Jun 2025 |
| Form 1File: 13 ARCHITECT 30 06 2024.pdf | 5 Jun 2025 |
| Form 2File: 29 ENGINEER 30 06 2024.pdf | 5 Jun 2025 |
| Form 3File: 45 FORM 3 CA 30 06 2024.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 61 SOLD UNSOLD QTRLY UPDATE 30 06 2024.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 61 SOLD UNSOLD QTRLY UPDATE 30 06 2024.pdf | 5 Jun 2025 |
| Form 1File: 14 ARCHITECT 30 09 2024.pdf | 5 Jun 2025 |
| Form 2File: 30 ENGINEER 30 09 2024.pdf | 5 Jun 2025 |
| Form 3File: 46 FORM 3 CA 30 09 2024.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 62 SOLD UNSOLD QTRLY UPDATE 30 09 2024.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 62 SOLD UNSOLD QTRLY UPDATE 30 09 2024.pdf | 5 Jun 2025 |
| Form 1File: 15 ARCHITECT 31 12 2024.pdf | 5 Jun 2025 |
| Form 2File: 31 ENGINEER 31 12 2024.pdf | 5 Jun 2025 |
| Form 3File: 47 FORM 3 CA 31 12 2024.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: 63 SOLD UNSOLD QTRLY UPDATE 31 12 2024.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: 63 SOLD UNSOLD QTRLY UPDATE 31 12 2024.pdf | 5 Jun 2025 |
Promoter's earlier projects10
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| OM SAI NATH APARTMENT | SURVEY NO 33 HISSA NO 7P CTS NO 8967 - 8968 NEAR MAHALAXMI NAGAR VILLAGE VADAVALI AMBERNATH EAST | 14 | Completed | Nov 2015 | Late, Dec 2015 |
| SAI RAKSHA APARTMENT | PLOT NO 5-6-7 SURVEY NO 84 CTS NO 9265 NEAR RELIANCE RESIDENCY AMBERNATH EAST | 17 | Completed | Jan 2015 | Jan 2015 |
| SHANI SOHAM APARTMENT | CTS NO 9299-5 MORIVALI GAONTHAN AMBERNATH EAST | 45 | Completed | May 2013 | Late, Jul 2013 |
| OM SAI APARTMENT | CTS NO 9008 GUT NO.61-1 B CABIN ROAD MORIVALI AMBERNATH EAST | 19 | Completed | May 2012 | May 2012 |
| KRISH APARTMENT | PLOT NO 18 AND 19 GUT NO.46-3 BEHIND NAVRE NAGAR MORIVALI AMBERNATH EAST | 19 | Completed | May 2011 | Late, Jul 2011 |
| KRISH APARTMENT | PLOT NO.17 GUT NO.46-3 BEHIND NAVRE NAGAR MORIVALI AMBERNATH EAST | 11 | Completed | Mar 2011 | Late, Jun 2011 |
| KRISH APARTMENT | PLOT NO 16 GUT NO 46-3 BEHIND NAVRE NAGAR MORIVALI AMBERNATH EAST | 8 | Completed | Feb 2011 | Late, Jun 2011 |
| SAI RESIDENCY | GUT NO.52P NAVRE NAGAR MORIVALI AMBERNATH EAST | 76 | Completed | Mar 2008 | Late, Jun 2008 |
| KARISHMA APARTMENT | PLOT NO 12 GUT NO 57 VILLAGE MORIVALI B CABIN ROAD AMBERNATH EAST | 20 | Completed | Mar 2007 | Mar 2007 |
| KARISHMA APARTMENT | PLOT NO.10 GUT NO.57 VILLAGE MORIVALI B CABIN ROAD AMBERNATH EAST | 18 | Completed | Mar 2007 | Mar 2007 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 6 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
Keep OM SAI CLASSIC on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMBERNATH VILLAGE7,600+ in Thane
Filed coordinates, straight-line distance. 200 registered projects within 2 km.
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
KRUSHNA VIHAR - PHASE I
KRUSHAN DHAM BUILDERS & DEVELOPERS
VISHWAJEET MYSPACE
GULABRAO BABURAO KARANJULE PATIL
KHATRI SPARSH
KHATRI REALTY
Tulsi Galaxy
Manas Associates
WALEKAR HOMES
WALEKAR & SON'S DEVELOPERS
See every Thane project, with the district possession charts
Builder: D A CONSTRUCTION
D A CONSTRUCTION has 7 registrations on MahaRERA, including OM SAI REGENCY and OM SAI TOWERS. Its filings disclose 7 earlier MahaRERA projects: declares 3 of 7 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if OM SAI CLASSIC is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of OM SAI CLASSIC?
The registered promoter entity is D A CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in OM SAI CLASSIC?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for OM SAI CLASSIC?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at OM SAI CLASSIC?
The professionals named in the filing: Architect: AKHIL ANIL DESAI; Engineer: ATUL KUDTARKAR AND ASSOCIATES; Engineer: AKHIL ANIL DESAI; Chartered Accountant: YOGESH NANDA AND ASSOCIATES; Chartered Accountant: R.B. SINGH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in OM SAI CLASSIC?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback