RG-MH-06083 · RERA P51700054556 · Last updated on MahaRERA portal: 5 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 6 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
10 of 19Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

OM SAI AVENUE is a Residential / Group Housing project by D A CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700054556 on 31 Jan 2024. The registration is recorded completed; possession was promised by 31 Dec 2025. 9 of the 19 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameOM SAI AVENUE
  • TypeResidential / Group Housing
  • Location
    • Plot No. 464
    • CTS No 7317
    • Ambernath East
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054556
  • ReraGenie IDRG-MH-06083

Builder

  • NameD A CONSTRUCTION
  • Entity typePartnership
  • PartnerSHARAD JAYANTILAL DESAI
  • Authorised PartnerAKHIL ANIL DESAI
  • Other registrations6 more →
  • Completed6 of 7
  • Declared earlier projects7 →

Key dates

this monthRegisteredJan 2024PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jan 2024
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed52 files

Current status

47%9 of 19 units booked

Figures as on 5 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OM SAI AVENUENA8719019

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

OM SAI AVENUE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered28
Open Space22

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area562 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityAMBERNATH MUNICIPAL COUNCIL, AMBERNATH
Permissible FSI1528.14
Proposed, not sanctioned1,528 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAMBERNATH EAST

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAKHIL ANIL DESAI
EngineerPRAMOD SHANKAR KAMBLE SHANKAR KAMBLE
EngineerAKHIL ANIL DESAI
Chartered AccountantYOGESH NANDA & ASSOCIATES
Chartered AccountantR.B. SINGH & ASSOCIATES
PartnerRole in project
D A CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: FORM 2A ENGINEER 31 03 2024.pdf5 Jun 2025
Form 2A (FY 2024-2025)File: FORM 2A ENGINEER 31 03 2025.pdf5 Jun 2025
Form 1File: 1 ARCHITECT CERTIFICATE 31 03 2024.pdf2 Jun 2025
Form 2File: 6 ENGINEER CERTIFICATE 31 03 2024.pdf2 Jun 2025
Form 3File: 11 FORM 3 UPDATED AVENUE 31 03 2024.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: 16 SOLD UNSOLD QTRLY 31 03 2024.pdf2 Jun 2025
Form 1File: 2 ARCHITECT CERTIFICATE 30 06 2024.pdf2 Jun 2025
Form 2File: 7 ENGINEER CERTIFICATE 30 06 2024.pdf2 Jun 2025
Form 3File: 12 FORM 3 UPDATED AVENUE 30 06 2024.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: 17 SOLD UNSOLD QTRLY 30 06 2024.pdf2 Jun 2025
Form 1File: 3 ARCHITECT CERTIFICATE 30 09 2024.pdf2 Jun 2025
Form 2File: 8 ENGINEER CERTIFICATE 30 09 2024.pdf2 Jun 2025
Form 3File: 13 FORM 3 UPDATED AVENUE 30 09 2024.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: 18 SOLD UNSOLD QTRLY 30 09 2024.pdf2 Jun 2025
Form 1File: 4 ARCHITECT CERTIFICATE 31 12 2024.pdf2 Jun 2025
Form 2File: 9 ENGINEER CERTIFICATE 31 12 2024.pdf2 Jun 2025
Form 3File: 14 FORM 3 UPDATED AVENUE 31 12 2024.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: 19 SOLD UNSOLD QTRLY 31 12 2024.pdf2 Jun 2025
Form 1File: 5 ARCHITECT CERTIFICATE 31 03 2025.pdf2 Jun 2025
Form 2File: 10 ENGINEER CERTIFICATE 31 03 2025.pdf2 Jun 2025
Form 3File: 15 FORM 3 UPDATED AVENUE 31 03 2025.pdf2 Jun 2025
Disclosure of Sold and Booked InventoryFile: 20 SOLD UNSOLD QTRLY 31 03 2025.pdf2 Jun 2025
Form 5 (FY 2023-2024)File: FORM 5 OM SAI AVENUE DONE.pdf2 Jun 2025
Occupational CertificateFile: O C FOR OM SAI AVENUE.pdf2 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 OM SAI AVENUE.pdf10 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC VERIFICATION.pdf27 Jan 2024
Proforma of Agreement for saleFile: DRAFT AFS UPDATED.pdf8 Jan 2024
Deviation Report with respect to model copy of AgreementFile: AFL DEVIATION REPORT FINAL.pdf8 Jan 2024
Copy of the legal title reportFile: TITLE REPORT UPDATED.pdf5 Dec 2023
Details of encumbrances concerned to FinanceFile: FINANCIAL ENCUBRANCE UPDATED.pdf5 Dec 2023
Details of encumbrances concerned to LegalFile: FINANCIAL ENCUBRANCE UPDATED.pdf5 Dec 2023
Declaration about Commencement CertificateFile: CC DECLARATION UPDATED.pdf5 Dec 2023
Declaration in FORM BFile: FORM B UPDATED.pdf5 Dec 2023
CERSAI detailsFile: CERSAI DECLARATION UPDATED.pdf5 Dec 2023
Layout approvalFile: BUILDING PLAN.pdf8 Jun 2023
Building plan approvalFile: BUILDING PLAN.pdf8 Jun 2023
PAN CardFile: FIRM PAN CARD.pdf8 Jun 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES LEGAL.pdf8 Jun 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCES LEGAL.pdf8 Jun 2023
Copy of Layout Approval (in case of layout)File: BUILDING PLAN.pdf8 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf8 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: C C OM SAI AVENUE.pdf8 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf8 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf8 Jun 2023
CERSAI detailsFile: CERSAI REPORT.pdf8 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf8 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A AKHIL DESAIII.pdf8 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A SHARAD DESAI.pdf8 Jun 2023
Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf8 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER.pdf8 Jun 2023
Deviation Report with respect to Allotment letterFile: DEVIATION LETTER FOR ALLOTMENT.pdf8 Jun 2023
Other - TechnicalFile: BUILDER ASSOCIATION CERTIFICATE.pdf8 Jun 2023

Promoter's earlier projects10

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise6 delivered late
ProjectLocationFlatsStatusPromisedDelivered
OM SAI NATH APARTMENTSURVEY NO 33 HISSA NO 7P CTS NO 8967 - 8968 NEAR MAHALAXMI NAGAR VILLAGE VADAVALI AMBERNATH EAST14CompletedNov 2015Late, Dec 2015
SAI RAKSHA APARTMENTPLOT NO 5-6-7 SURVEY NO 84 CTS NO 9265 NEAR RELIANCE RESIDENCY AMBERNATH EAST17CompletedJan 2015Jan 2015
SHANI SOHAM APARTMENTCTS NO 9299-5 MORIVALI GAONTHAN AMBERNATH EAST45CompletedMay 2013Late, Jul 2013
OM SAI APARTMENTCTS NO 9008 GUT NO.61-1 B CABIN ROAD MORIVALI AMBERNATH EAST19CompletedMay 2012May 2012
KRISH APARTMENTPLOT NO 18 AND 19 GUT NO.46-3 BEHIND NAVRE NAGAR MORIVALI AMBERNATH EAST19CompletedMay 2011Late, Jul 2011
KRISH APARTMENTPLOT NO.17 GUT NO.46-3 BEHIND NAVRE NAGAR MORIVALI AMBERNATH EAST11CompletedMar 2011Late, Jun 2011
KRISH APARTMENTPLOT NO 16 GUT NO 46-3 BEHIND NAVRE NAGAR MORIVALI AMBERNATH EAST8CompletedFeb 2011Late, Jun 2011
SAI RESIDENCYGUT NO.52P NAVRE NAGAR MORIVALI AMBERNATH EAST76CompletedMar 2008Late, Jun 2008
KARISHMA APARTMENTPLOT NO 12 GUT NO 57 VILLAGE MORIVALI B CABIN ROAD AMBERNATH EAST20CompletedMar 2007Mar 2007
KARISHMA APARTMENTPLOT NO.10 GUT NO.57 VILLAGE MORIVALI B CABIN ROAD AMBERNATH EAST18CompletedMar 2007Mar 2007

How this compares with Thane

47%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM SAI AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambernath East7,600+ in Thane

2 kmOM SAI AVENUECompleted 90Lapsed / revoked 30Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 200 registered projects within 2 km.

Builder: D A CONSTRUCTION

D A CONSTRUCTION has 7 registrations on MahaRERA, including OM SAI REGENCY and OM SAI TOWERS. Its filings disclose 7 earlier MahaRERA projects: declares 3 of 7 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if OM SAI AVENUE is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM SAI AVENUE?

The registered promoter entity is D A CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM SAI AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM SAI AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM SAI AVENUE?

The professionals named in the filing: Architect: AKHIL ANIL DESAI; Engineer: PRAMOD SHANKAR KAMBLE SHANKAR KAMBLE; Engineer: AKHIL ANIL DESAI; Chartered Accountant: YOGESH NANDA & ASSOCIATES; Chartered Accountant: R.B. SINGH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM SAI AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM SAI AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM SAI AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.