Home / Browse projects / Mumbai Suburban, Maharashtra / OM PRIYADARSHANI

Completed No litigation declared Residential / Group Housing project

OM PRIYADARSHANI

By AAKRUTI ENTERPRISES

RG-MH-06138 · RERA P51800052127 · Last updated on MahaRERA portal: 13 Oct 2025

Source: official MahaRERA filing

Red flags

  • Rs 30.00 crore secured on the land, in favour of AU SMALL FINANCE BANK LTD
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
36 of 119Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

OM PRIYADARSHANI is a Residential / Group Housing project by AAKRUTI ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052127 on 24 Jul 2023. The registration is recorded completed; possession was promised by 30 Sep 2026. 83 of the 119 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameOM PRIYADARSHANI
  • TypeResidential / Group Housing
  • Location
    • PANT NAGAR
    • GHATKOPAR EAST
    • Ghatkopar
    • Kurla
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800052127
  • ReraGenie IDRG-MH-06138

Builder

  • NameAAKRUTI ENTERPRISES
  • Entity typePartnership
  • PartnersTULSIDAS DAMJI DAMA, DINESH HARIBHAI DODIA
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2023PromisedSep 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jul 2023
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

70%83 of 119 units booked
84.6%Work done, per cost certificate

Figures as on 13 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PANTNAGAR PRIYADARSHANI CHS LTDNA17161190119

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

PANTNAGAR PRIYADARSHANI CHS LTD: 88% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 13 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered51

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area857 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAU SMALL FINANCE BANK LTD
Secured amountRs 30.00 crore
CERSAI search filedYes
Declared on3 Oct 2024
LandownerVillageDistrict
PANTNAGAR PRIYADARSHANI CHS LTDGhatkoparMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI6220.0
Proposed, not sanctioned6,220 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 16 KANAKIA ZILLION LBS ROAD KURLA MUMBAI 400070
Estimated costRs 31.72 cr
Cost incurredRs 26.83 cr
Work done84.59%
BuildingWingEstimatedIncurred
PANTNAGAR PRIYADARSHANI CHS LTDNARs 28.55 crRs 26.83 cr
-NARs 3.17 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCONSULTANTS COMBINE
EngineerPARAS CONSULTANTS
Chartered AccountantMAMTA SHETH AND ASSOCIATES
Chartered AccountantK R DHOLU AND ASSOCIATES
PartnerRole in project
AAKRUTI ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Mail Full OCC Approved of Bldg No 102 Pant Nagar Priyadarshani CHSL Maharera.pdf13 Oct 2025
Occupational CertificateFile: OC and Form 4 102.pdf29 Sep 2025
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERETIFICATE -102.pdf26 Sep 2025
Withdrawal Update Form 2File: FORM-2 ENGINEERu0027S CERTIFICATE.pdf26 Sep 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE - FINAL.pdf26 Sep 2025
Form 1File: FORM -1.pdf24 Sep 2025
Form 2File: FORM 2 REVISED.pdf24 Sep 2025
Form 3File: FORM 3 SCAN_FINAL.pdf24 Sep 2025
Disclosure of Sold and Booked InventoryFile: inventory-102.pdf24 Sep 2025
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERETIFICATE -102.pdf24 Sep 2025
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERETIFICATE -102.pdf24 Sep 2025
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERETIFICATE -102.pdf24 Sep 2025
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERETIFICATE -102.pdf24 Sep 2025
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERETIFICATE -102.pdf24 Sep 2025
Withdrawal Update Form 1File: FORM-1 ARCHITECT CERETIFICATE -102.pdf24 Sep 2025
Withdrawal Update Form 2File: FORM-2 ENGINEERu0027S CERTIFICATE.pdf24 Sep 2025
Withdrawal Update Form 2File: FORM-2 ENGINEERu0027S CERTIFICATE.pdf24 Sep 2025
Withdrawal Update Form 2File: FORM-2 ENGINEERu0027S CERTIFICATE.pdf24 Sep 2025
Withdrawal Update Form 2File: FORM-2 ENGINEERu0027S CERTIFICATE.pdf24 Sep 2025
Withdrawal Update Form 2File: FORM-2 ENGINEERu0027S CERTIFICATE.pdf24 Sep 2025
Withdrawal Update Form 2File: FORM-2 ENGINEERu0027S CERTIFICATE.pdf24 Sep 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE - FINAL.pdf24 Sep 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE - FINAL.pdf24 Sep 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE - FINAL.pdf24 Sep 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE - FINAL.pdf24 Sep 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE - FINAL.pdf24 Sep 2025
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE - FINAL.pdf24 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 AAKRUTI ENTERPRISES.pdf24 Sep 2025
Form 5 (FY 2024-2025)File: AAKRUTI ENTERPRISES ANNUAL REPORT.pdf18 Sep 2025
Commencement certificateFile: Full CC approved.pdf16 Jul 2025
Building plan approvalFile: BUILDING PLAN APPROVED LATEST_compressed.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_FINAL_31 03 2025_102.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 PARAS CONSULTANT.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: inventory-102.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE AAKRUTI ENTERPRISES 17 01 2025.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 Architect Certificate Q3 AAKRUTI.pdf17 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 Q2.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PARAS CONSULTANTS FROM-2 ENGINEER CERTIFICATE .pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: INVENTORY BLDG NO 102.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-102.pdf22 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 AAKRUTI ENTERPRISES_compressed.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 mar-24 (1).pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-MAR-24 (1).pdf20 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-102.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Apr 2024
Other - TechnicalFile: FORM 2A-102.pdf20 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Full CC approved of Bldg 102.pdf7 Mar 2024
Disclosure of sold/ booked inventoryFile: Inventory Report.pdf13 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CONSULTANTS COMBINE ANNEXURE A FROM 1 .pdf12 Jan 2024
Details of encumbrances concerned to FinanceFile: Encombrance on project 102.pdf11 Jan 2024
Details of encumbrances concerned to LegalFile: Encombrance on project 102.pdf11 Jan 2024
Proforma of Agreement for saleFile: DRAFT SALE AGREEMENT-102 -WITH AU CLAUSE.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL_compressed (2).pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1 Bldg No 102_compressed.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE_compressed.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold inventory Bldg No 102_compressed.pdf19 Oct 2023
Proforma of Agreement for saleFile: Bldg 102 Om Priyadarshani Agreement For Sale Amended.pdf29 Sep 2023
Other - LegalFile: Sale Deed_11zon.pdf19 Jul 2023
Copy of the legal title reportFile: bldg 102 marketable title report by dc _rera_.pdf6 Jul 2023
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER Litigations-Om Priyadarshani (1).pdf6 Jul 2023
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER Litigations-Om Priyadarshani (1).pdf6 Jul 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC -UPLOAD.pdf6 Jul 2023
CERSAI detailsFile: CERSAI UNDERTAKING UPLOAD.pdf6 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL REGISTRATION UPLOAD.pdf6 Jul 2023
Proforma of Agreement for saleFile: AFS Om Priyad.pdf6 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf23 Jun 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER_OM PRIYADARSHINi.pdf22 Jun 2023
Layout approvalFile: LAYOUT PLAN_compressed.pdf19 Jun 2023
Building plan approvalFile: BUILDING PLAN_compressed.pdf19 Jun 2023
PAN CardFile: AAKRUTI PANCARD.pdf19 Jun 2023
Details of encumbrances concerned to FinanceFile: No ENCUMBRANCE LETTER -Dues-Om Priyadarshani (1).pdf19 Jun 2023
Details of encumbrances concerned to LegalFile: No ENCUMBRANCE LETTER -Dues-Om Priyadarshani (1).pdf19 Jun 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN_compressed.pdf19 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_compressed.pdf19 Jun 2023
Declaration in FORM BFile: DEVELOPER FORM-B DECLARATION.pdf19 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHIV SAMARTHPlot No. 191 at Kurla Mumbai Suburban 40007549CompletedDec 2024Jun 2023

How this compares with Mumbai Suburban

70%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM PRIYADARSHANI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR EAST6,700+ in Mumbai Suburban

2 kmOM PRIYADARSHANICompleted 114Lapsed / revoked 65Other 107Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: AAKRUTI ENTERPRISES

AAKRUTI ENTERPRISES has 2 registrations on MahaRERA, including SHIV SAMARTH and OM PRIYADARSHANI. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if OM PRIYADARSHANI is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM PRIYADARSHANI?

The registered promoter entity is AAKRUTI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM PRIYADARSHANI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM PRIYADARSHANI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM PRIYADARSHANI?

The professionals named in the filing: Architect: CONSULTANTS COMBINE; Engineer: PARAS CONSULTANTS; Chartered Accountant: MAMTA SHETH AND ASSOCIATES; Chartered Accountant: K R DHOLU AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM PRIYADARSHANI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM PRIYADARSHANI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM PRIYADARSHANI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.