Home / Browse projects / Thane, Maharashtra / OM LAMBODARAM CHS

Registration lapsed No litigation declared Others project

OM LAMBODARAM CHS

By HERAMBB BUILDERS

RG-MH-06964 · RERA P51700053802 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
41 of 57Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

OM LAMBODARAM CHS is a Others project by HERAMBB BUILDERS in Thane, Maharashtra, registered with MahaRERA as P51700053802 on 1 Dec 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 15 months from the original filing. 16 of the 57 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameOM LAMBODARAM CHS
  • TypeOthers
  • Location
    • KATRAP ROAD
    • KATRAP
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700053802
  • ReraGenie IDRG-MH-06964

Builder

  • NameHERAMBB BUILDERS
  • Entity typePartnership
  • PartnersCHANDRAKANT NARAYAN PATIL, Manali Chandrakant Patil

Key dates

4 months past promisethis monthRegisteredDec 2023First promiseMar 2025Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Dec 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed84 files

Current status

28%16 of 57 units booked
78.5%Work done, per cost certificate

Figures as on 22 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OM LAMBODARAM CHSNA108302757

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

OM LAMBODARAM CHS: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed73

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots73
Closed/Covered40
Open Space33

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area646 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 May 2026
LandownerVillageDistrict
HERAMBB BUILDERSBadlapur (M Cl)Thane
OM LAMBODARAM CHSBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityPramod Patil
Permissible FSI2274.41
Proposed, not sanctioned2,274 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR KBMC OFFICE, BADLAPUR E
Estimated costRs 5.94 cr
Cost incurredRs 4.66 cr
Work done78.46%
BuildingWingEstimatedIncurred
OM LAMBODARAM CHSNARs 5.48 crRs 4.66 cr
-NARs 45.70 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAMOD PATIL
EngineerATUL KUDTARKAR
Chartered AccountantAMRRITA JAGNAANI
PartnerRole in project
HERAMBB BUILDERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09102518066Mar 2025 → Jun 2026

Reason as filed by the promoterDispute between Partners

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000429282Sukumar Pradeep DhuleMS HERAMBB BUILDERS16/02/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Blue Print 2024_compressed.pdf22 May 2026
Building plan approvalFile: Blue print 2025.pdf22 May 2026
Layout approvalFile: NEW RERA GROUND FLOOR PLAN.pdf22 May 2026
Layout approvalFile: NEW RERA 1 AND 2.pdf22 May 2026
Withdrawal Update Form 1File: Arch Cert Jul 25 to Sep 25.pdf22 May 2026
Withdrawal Update Form 1File: FORM 1.pdf22 May 2026
Withdrawal Update Form 1File: Form 1.pdf22 May 2026
Withdrawal Update Form 2File: Engg certificate Q2.pdf22 May 2026
Withdrawal Update Form 2File: Form 2 Q3_compressed.pdf22 May 2026
Withdrawal Update Form 2File: Form 2.pdf22 May 2026
Withdrawal Update Form 3File: CA certificate form 3 - July 25 to Sep 25 Final.pdf22 May 2026
Withdrawal Update Form 3File: Form 3.pdf22 May 2026
Withdrawal Update Form 3File: Form 3.pdf22 May 2026
Withdrawal Update Form 1File: Form 1.pdf21 May 2026
Withdrawal Update Form 1File: Form 1.pdf21 May 2026
Withdrawal Update Form 1File: Form 1.pdf21 May 2026
Withdrawal Update Form 1File: Form 1.pdf21 May 2026
Withdrawal Update Form 1File: Form 1.pdf21 May 2026
Withdrawal Update Form 1File: Form 1.pdf21 May 2026
Withdrawal Update Form 1File: Arch Cert Apr 25 to Jun 25.pdf21 May 2026
Withdrawal Update Form 2File: Form 2.pdf21 May 2026
Withdrawal Update Form 2File: Form 2.pdf21 May 2026
Withdrawal Update Form 2File: Form 2.pdf21 May 2026
Withdrawal Update Form 2File: form 2.pdf21 May 2026
Withdrawal Update Form 2File: form 2.pdf21 May 2026
Withdrawal Update Form 2File: Form 2.pdf21 May 2026
Withdrawal Update Form 2File: Engg Certificate Q1.pdf21 May 2026
Withdrawal Update Form 3File: Form 3.pdf21 May 2026
Withdrawal Update Form 3File: Form 3.pdf21 May 2026
Withdrawal Update Form 3File: Form 3.pdf21 May 2026
Withdrawal Update Form 3File: Form 3.pdf21 May 2026
Withdrawal Update Form 3File: Form 3.pdf21 May 2026
Withdrawal Update Form 3File: Form 3.pdf21 May 2026
Withdrawal Update Form 3File: CA certificate form 3 -Apr 25 to Jun 25.pdf21 May 2026
Form 5 (FY 2023-2024)File: Signed Form 5 23-24.pdf23 Sep 2025
Form 5 (FY 2024-2025)File: Signed form 5 24-25.pdf23 Sep 2025
Form 2A (FY 2023-2024)File: 23-24.pdf17 Sep 2025
Form 2A (FY 2024-2025)File: 24-25.pdf17 Sep 2025
Form 1File: Form 1.pdf9 Sep 2025
Form 2File: Form 2.pdf9 Sep 2025
Form 3File: Form 3.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold List.pdf9 Sep 2025
Form 1File: Form 1.pdf9 Sep 2025
Form 2File: Form 2.pdf9 Sep 2025
Form 3File: Form 3.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold list.pdf9 Sep 2025
Form 1File: Form 1.pdf9 Sep 2025
Form 2File: Form 2.pdf9 Sep 2025
Form 3File: Form 3.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold list.pdf9 Sep 2025
Form 1File: Form 1.pdf9 Sep 2025
Form 2File: form 2.pdf9 Sep 2025
Form 3File: Form 3.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold list.pdf9 Sep 2025
Form 1File: Form 1.pdf9 Sep 2025
Form 2File: form 2.pdf9 Sep 2025
Form 3File: Form 3.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold list.pdf9 Sep 2025
Form 1File: Form 1.pdf9 Sep 2025
Form 2File: Form 2.pdf9 Sep 2025
Form 3File: Form 3.pdf9 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold list.pdf9 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Letter Chandrakant Patil.pdf22 Nov 2023
Details of encumbrances concerned to FinanceFile: finance encum.pdf27 Oct 2023
Details of encumbrances concerned to FinanceFile: legal encj.pdf27 Oct 2023
Details of encumbrances concerned to LegalFile: finance encum.pdf27 Oct 2023
Details of encumbrances concerned to LegalFile: legal encj.pdf27 Oct 2023
Declaration about Commencement CertificateFile: commence ment decl.pdf27 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200284854920_For_Asset_Based_Search_27_10_2023_13_30_46_686.pdf27 Oct 2023
CERSAI detailsFile: cersai undertaking.pdf27 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: declaration rera project.pdf27 Oct 2023
Proforma of Agreement for saleFile: Rera_Draft_Om_Lambodaram_CHS_and_Herambb_Builders (2).pdf27 Oct 2023
Proforma of Allotment letterFile: Provisional_Allotment_Letter_Herambb (2).pdf27 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank acc.pdf27 Oct 2023
Deviation Report with respect to Allotment letterFile: devition agrr allot.pdf27 Oct 2023
Deviation Report with respect to model copy of AgreementFile: devition agrr allot.pdf27 Oct 2023
Layout approvalFile: Blue Print (1)_compressed (2).pdf26 Oct 2023
Building plan approvalFile: Blue Print (1)_compressed (2).pdf26 Oct 2023
PAN CardFile: Heramb PAN.pdf26 Oct 2023
Copy of the legal title reportFile: Title.pdf26 Oct 2023

How this compares with Thane

28%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 15 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM LAMBODARAM CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATRAP7,600+ in Thane

Builder: HERAMBB BUILDERS

HERAMBB BUILDERS has 1 registration on MahaRERA, including OM LAMBODARAM CHS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that OM LAMBODARAM CHS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if OM LAMBODARAM CHS is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM LAMBODARAM CHS?

The registered promoter entity is HERAMBB BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM LAMBODARAM CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against OM LAMBODARAM CHS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for OM LAMBODARAM CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM LAMBODARAM CHS?

The professionals named in the filing: Architect: PRAMOD PATIL; Engineer: ATUL KUDTARKAR; Chartered Accountant: AMRRITA JAGNAANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM LAMBODARAM CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM LAMBODARAM CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM LAMBODARAM CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.