Home / Browse projects / Thane, Maharashtra / OM ASHISH CHS

Registered No litigation declared Residential / Group Housing project

OM ASHISH CHS

By GREEN HEIGHTS INFRA

RG-MH-73306 · RERA P51700047977 · Last updated on MahaRERA portal: 6 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Staircases, 68%
25 of 33Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

OM ASHISH CHS is a Residential / Group Housing project by GREEN HEIGHTS INFRA in Thane, Maharashtra, registered with MahaRERA as P51700047977 on 2 Dec 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 8 of the 33 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameOM ASHISH CHS
  • TypeResidential / Group Housing
  • Location
    • CHURCH ROAD
    • GANESH NAGAR
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700047977
  • ReraGenie IDRG-MH-73306

Builder

  • NameGREEN HEIGHTS INFRA
  • Entity typePartnership
  • PartnersARUN KUMAR BARKHUPRASAD MOURYA, ASHOK KUMAR MADANLAL JAIN
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Dec 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed82 files

Current status

24%8 of 33 units booked
68.2%Work done, per cost certificate

Figures as on 6 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OM ASHISH CHS A WINGNA8633033

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 68%.

OM ASHISH CHS A WING: 49% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered1
Open Space11

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area656 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Feb 2026
LandownerVillageDistrict
Om Ashish Co-op Housing Society LimitedAmbarnath(M Cl)Thane

Approvals and building plan

Permissible FSI1761.4
Proposed, not sanctioned1,761 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLOOR 10 11 12 15 16 ADJ TO SAGAR HOTEL KALYAN SHIL ROAD DAVDI NAKA MIDC DOMBIVLI EAST
Estimated costRs 3.13 cr
Cost incurredRs 2.13 cr
Work done68.16%
BuildingWingEstimatedIncurred
OM ASHISH CHS A WINGNARs 3.00 crRs 2.13 cr
-NARs 12.50 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH SHELAR
EngineerWAHID GARYAL
EngineerMANISH SHELAR
Chartered AccountantBIMAL K BANKA
Chartered AccountantManish M Mehta
Chartered AccountantRANJANA GUPTA
PartnerRole in project
GREEN HEIGHTS INFRA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07022619761Dec 2025 → Dec 2026

Reason as filed by the promoterDUE TO SHORTAGE OF FUNDS WORK COULD NOT BE COMPLETED ON TIME BUT NOW WORK IS ABOUT TO COMPLETE FOR FINALISATION AND OBTAIN OC TOO SO WE NEED EXTENSION TILL 31.12.2026

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_31122025.pdf6 Feb 2026
Withdrawal Update Form 2File: Form 2_31122025.pdf6 Feb 2026
Withdrawal Update Form 3File: FORM 3_31122025.pdf6 Feb 2026
Form 1File: Form 1_31122025.pdf4 Feb 2026
Form 2File: Form 2_31122025.pdf4 Feb 2026
Form 3File: FORM 3_31122025.pdf4 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND UNSOLD INVENTORY.pdf4 Feb 2026
Form 2A (FY 2022-2023)File: Form 2A Omashish 2023.pdf3 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A Omashish 2024.pdf3 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A Omashish 2025.pdf3 Feb 2026
Form 5 (FY 2022-2023)File: GHI_22-23.pdf21 Jan 2026
Form 5 (FY 2023-2024)File: GHI_23-24.pdf21 Jan 2026
Form 5 (FY 2024-2025)File: GHI_24-25.pdf21 Jan 2026
Form 1File: Form 1 (25-26) Q2 GHI(Om Ashish).pdf7 Jan 2026
Form 2File: Form 2 ( 25-26) Q2 GHI(Om Ashish).pdf7 Jan 2026
Form 3File: Form 3 ( 25-26) Q2 GHI(Om Ashish).pdf7 Jan 2026
Disclosure of Sold and Booked InventoryFile: Omashish chs sold unsold Declaration Q2 fy 25-26.pdf7 Jan 2026
Form 1File: 1_Form 1 (22-23) Q3 (GHI - Om Ashish).pdf4 Oct 2025
Form 2File: 1_Form 2 (22-23) Q3 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 1_FORM 3 (22-23) Q3 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 1_Sold-unsold declaration Q3 Fy 22-23.pdf4 Oct 2025
Form 1File: 2_Form 1 (22-23) Q4 (GHI - Om Ashish).pdf4 Oct 2025
Form 2File: 2_Form 2 (22-23) Q4 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 2_FORM 3 (22-23) Q4 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 2_Sold-unsold declaration Q4 Fy 22-23.pdf4 Oct 2025
Form 1File: 3_Form 1 (23-24) Q1 (GHI - Om Ashish).pdf4 Oct 2025
Form 2File: 3_Form 2 (23-24) Q1 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 3_FORM 3 (23-24) Q1 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 3_Sold-unsold declaration Q1 Fy 23-24.pdf4 Oct 2025
Form 1File: 4_Form 1 (23-24) Q2 (GHI - Om Ashish).pdf4 Oct 2025
Form 2File: 4_Form 2 (23-24) Q2 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 4_FORM 3 (23-24) Q2 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 4_Sold-unsold declaration Q2 Fy 23-24.pdf4 Oct 2025
Form 1File: 5_Form 1 (23-24) Q3 (GHI - Om Ashish).pdf4 Oct 2025
Form 2File: 5_Form 2 (23-24) Q3 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 5_FORM 3 (23-24) Q3 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 5_Sold-unsold declaration Q3 Fy 23-24.pdf4 Oct 2025
Form 1File: 6_Form 1 (23-24) Q4 (GHI - Om Ashish).pdf4 Oct 2025
Form 2File: 6_Form 2 (23-24) Q4 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 6_FORM 3 (23-24) Q4 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 6_Sold-unsold declaration Q4 Fy 23-24.pdf4 Oct 2025
Form 1File: 7_Form 1 (24-25) Q1 (GHI-Om Ashish).pdf4 Oct 2025
Form 2File: 7_Form 2 (24-25) Q1 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 7_FORM 3 (24-25) Q1 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 7_Sold-unsold declaration Q1 Fy 24-25.pdf4 Oct 2025
Form 1File: 8_Form 1 (24-25) Q2 (GHI-Om Ashish).pdf4 Oct 2025
Form 2File: 8_Form 2 (24-25) Q2 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 8_FORM 3 (24-25) Q2 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 8_Sold-unsold declaration Q2 Fy 24-25.pdf4 Oct 2025
Form 1File: 9_Form 1 (24-25) Q3 (GHI-Om Ashish).pdf4 Oct 2025
Form 2File: 9_Form 2 (24-25) Q3 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 9_FORM 3 (24-25) Q3 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 9_Sold-unsold declaration Q3 Fy 24-25.pdf4 Oct 2025
Form 1File: 10_Form 1 (24-25) Q4 (GHI-Om Ashish).pdf4 Oct 2025
Form 2File: 10_Form 2 (24-25) Q4 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 10_FORM 3 (24-25) Q4 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 10_Sold-unsold declaration Q4 Fy 24-25.pdf4 Oct 2025
Form 1File: 11_Form 1 (25-26) Q1 (GHI-Om Ashish).pdf4 Oct 2025
Form 2File: 11_Form 2 (25-26) Q 1 (GHI-Om Ashish).pdf4 Oct 2025
Form 3File: 11_FORM 3 (25-26) Q1 (GHI - Om Ashish).pdf4 Oct 2025
Disclosure of Sold and Booked InventoryFile: 11_Sold-unsold declaration Q1 Fy 25-26.pdf4 Oct 2025
Copy of the legal title reportFile: Title_Report (1).pdf18 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA form 3 (1).pdf18 Nov 2022
Declaration in FORM BFile: Form B of Developer (1).pdf9 Nov 2022
CERSAI detailsFile: CRASAI (1) (1).pdf9 Nov 2022
Proforma of Allotment letterFile: Allotment Letter (1).pdf9 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank (2).pdf9 Nov 2022
Details of encumbrances concerned to LegalFile: ec-legal (1).pdf14 Oct 2022
Deviation Report with respect to Allotment letterFile: Details of deviation of allotment letter.pdf14 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Deviation of AFS (1).pdf14 Oct 2022
Other - LegalFile: Agreement of Sale (1).pdf14 Oct 2022
Other - LegalFile: Allotment Letter (1).pdf14 Oct 2022
Building plan approvalFile: BADLAPUR CC (1)-compressed.pdf28 Apr 2022
Layout approvalFile: BALU PRINT BADLAPUR PLAN (1) (2)-compressed.pdf28 Apr 2022
PAN CardFile: PAN-converted.pdf28 Apr 2022
Copy of the legal title reportFile: TITLE CERT-compressed (1).pdf28 Apr 2022
Details of encumbrancesFile: ENCUMBERENCE.pdf28 Apr 2022
Copy of Layout Approval (in case of layout)File: BALU PRINT BADLAPUR PLAN (1) (2)-compressed.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: BADLAPUR CC (1)-compressed.pdf28 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: BADLAPUR CC (1)-compressed.pdf28 Apr 2022

How this compares with Thane

24%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM ASHISH CHS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GANESH NAGAR7,600+ in Thane

2 kmOM ASHISH CHSCompleted 175Lapsed / revoked 64Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: GREEN HEIGHTS INFRA

GREEN HEIGHTS INFRA has 2 registrations on MahaRERA, including AADINATH COMPLEX and OM ASHISH CHS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if OM ASHISH CHS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM ASHISH CHS?

The registered promoter entity is GREEN HEIGHTS INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM ASHISH CHS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM ASHISH CHS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM ASHISH CHS?

The professionals named in the filing: Architect: MANISH SHELAR; Engineer: WAHID GARYAL; Engineer: MANISH SHELAR; Chartered Accountant: BIMAL K BANKA; Chartered Accountant: Manish M Mehta; Chartered Accountant: RANJANA GUPTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM ASHISH CHS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM ASHISH CHS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM ASHISH CHS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.