Home / Browse projects / Thane, Maharashtra / OM ANANT PALACE

Registered No litigation declared Mixed project

OM ANANT PALACE

By YOGESHWAR DEVELOPERS

RG-MH-18113 · RERA P51700076615 · Last updated on MahaRERA portal: 3 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2029Possession promisedno revision filed
2 of 11Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 50%
69 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

OM ANANT PALACE is a Mixed project by YOGESHWAR DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700076615 on 18 Jun 2024. Possession is promised by 31 Mar 2029. 3 of the 72 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameOM ANANT PALACE
  • TypeMixed
  • Location
    • GAONDEVI ROAD ANANT NAGAR
    • KULGAON BADLAPUR-E
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700076615
  • ReraGenie IDRG-MH-18113

Builder

  • NameYOGESHWAR DEVELOPERS
  • Entity typePartnership
  • PartnersGANESH YASHWANT BHOSALE, JAYESH NARAYAN RAUT, SURYAKANT BHALCHANDRA TARE, RAJESH VISHNU PATIL, UMESH LAXMAN BHOSALE
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredJun 2024PromisedMar 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Jun 2024
  • Promised completion31 Mar 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

4%3 of 72 units booked
28.4%Work done, per cost certificate

Figures as on 3 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OM ANANT PALACENA77561571

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

OM ANANT PALACE23%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
NA Plot Without StructureNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 3 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed108

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots108
Open Space108

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,153 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jul 2026
LandownerVillageDistrict
JAI SHREE OMKARESHWAR SADANBadlapur (M Cl)Thane
ANANT CO-OP HSG SOC LTDBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNICIPAL COUNCIL
Permissible FSI2993.19
Proposed, not sanctioned2,993 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANDHI CHOWK BADLAPUR -E
Estimated costRs 8.01 cr
Cost incurredRs 2.28 cr
Work done28.44%
BuildingWingEstimatedIncurred
OM ANANT PALACENARs 7.60 crRs 2.28 cr
-NARs 41.62 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSWASTIK CREATION
Engineeratul kudtarlar and associates
Chartered Accountantca amrrita jagnaani
PartnerRole in project
YOGESHWAR DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2029

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: architect.pdf3 Jul 2026
Withdrawal Update Form 2File: ENG CERTIFICATE.pdf3 Jul 2026
Withdrawal Update Form 3File: form 3.pdf3 Jul 2026
Form 1File: Form 1 June 24 Yogeshwar.pdf13 Apr 2026
Form 2File: Form 2 June 24 Yogeshwar.pdf13 Apr 2026
Form 3File: Form 3 June 24 Yogeshwar Developers.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Disclosure June 24 Yogeshwar.pdf13 Apr 2026
Form 1File: Form 1 Sept 24 Yogeshwar.pdf13 Apr 2026
Form 2File: Form 2 Sept 24 Yogeshwar.pdf13 Apr 2026
Form 3File: Form 3 Sept 24 Yogeshwar Developers.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Disclosure Sept 24 Yogeshwar.pdf13 Apr 2026
Form 1File: Form 1 Dec 24 Yogeshwar_11zon.pdf13 Apr 2026
Form 2File: Form 2 Dec 24 Yogeshwar.pdf13 Apr 2026
Form 3File: Form 3 Dec 24 Yogeshwar Developers.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Disclosure Dec 24 Yogeshwar.pdf13 Apr 2026
Form 1File: Form 1 Mar 25 Yogeshwar_11zon.pdf13 Apr 2026
Form 2File: Form 2 Mar 25 Yogeshwar.pdf13 Apr 2026
Form 3File: Form 3 Mar 25 Yogeshwar Developers.pdf13 Apr 2026
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Disclosure Mar 25 Yogeshwar.pdf13 Apr 2026
Withdrawal Update Form 1File: Form 1 June 25 Yogeshwar_11zon.pdf13 Apr 2026
Withdrawal Update Form 1File: Form 1 Sept 25 Yogeshwar_11zon.pdf13 Apr 2026
Withdrawal Update Form 1File: Form 1 Dec 25 Yogeshwar_11zon.pdf13 Apr 2026
Withdrawal Update Form 2File: Form 2 June 25 Yogeshwar.pdf13 Apr 2026
Withdrawal Update Form 2File: Form 2 Sept 25 Yogeshwar.pdf13 Apr 2026
Withdrawal Update Form 2File: Form 2 Dec 25 Yogeshwar.pdf13 Apr 2026
Withdrawal Update Form 3File: Form 3 June 25 Yogeshwar Developers.pdf13 Apr 2026
Withdrawal Update Form 3File: Form 3 Sept 25 Yogeshwar Developers.pdf13 Apr 2026
Withdrawal Update Form 3File: Form 3 Dec 25 Yogeshwar Developers.pdf13 Apr 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT ERTIFICATE.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (27)_11zon (1).pdf27 Dec 2024
Details of encumbrances concerned to FinanceFile: no encumbrances.pdf24 Apr 2024
Details of encumbrances concerned to LegalFile: no encumbrances.pdf24 Apr 2024
Other - TechnicalFile: KBMC SCREENSHORT.pdf23 Apr 2024
Other - LegalFile: PARTNERSHIP DEED_11zon.pdf20 Apr 2024
Other - LegalFile: ganesh bhosale.pdf20 Apr 2024
Other - LegalFile: jayesh.pdf20 Apr 2024
Other - LegalFile: RAJESH.pdf20 Apr 2024
Other - LegalFile: suryakant tare.pdf20 Apr 2024
Other - LegalFile: umesh.pdf20 Apr 2024
Layout approvalFile: HPSCANNER1221.pdf9 Apr 2024
Building plan approval or NA orderFile: HPSCANNER1219.pdf9 Apr 2024
PAN CardFile: yogeshwar pan card.pdf9 Apr 2024
Copy of the legal title reportFile: legal title report merged_11zon.pdf9 Apr 2024
Details of encumbrances concerned to FinanceFile: ganesh bhosale declaration of no encumbrance finane new.pdf9 Apr 2024
Details of encumbrances concerned to LegalFile: ganesh bhosale declaration of no encumbrance finane new.pdf9 Apr 2024
Copy of Layout Approval (in case of layout)File: HPSCANNER1221.pdf9 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER1219.pdf9 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: KBMC PERMISSION.pdf9 Apr 2024
Declaration about Commencement CertificateFile: format d new.pdf9 Apr 2024
Declaration in FORM BFile: FORM B NEW.pdf9 Apr 2024
CERSAI detailsFile: cersai s no 18 1 4.pdf9 Apr 2024
CERSAI detailsFile: cersai report 18 1 4.pdf9 Apr 2024
CERSAI detailsFile: cersai s no 18 1 18.pdf9 Apr 2024
CERSAI detailsFile: cersai report 18 1 18.pdf9 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 12 6 24_11zon.pdf9 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: GANESH BHOSALE.pdf9 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: JAYESH RAUT.pdf9 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: RAJESH PATIL.pdf9 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SURYAKANT TARE.pdf9 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: UMESH BHOSALE.pdf9 Apr 2024
Proforma of Allotment letterFile: allotment letter.pdf9 Apr 2024
Proforma of Agreement for saleFile: AFS COPY.pdf9 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: seperate bank.pdf9 Apr 2024
Deviation Report with respect to Allotment letterFile: order no 30 2022 allotment.pdf9 Apr 2024
Deviation Report with respect to model copy of AgreementFile: rule no 10 sale draft.pdf9 Apr 2024

How this compares with Thane

4%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep OM ANANT PALACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KULGAON BADLAPUR-E7,600+ in Thane

Builder: YOGESHWAR DEVELOPERS

Yogeshwar Developers has 3 registrations on MahaRERA, including SHIVALIK SOLITAIRE and SHIVALIK SHRADDHA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if OM ANANT PALACE is delayed beyond 31 Mar 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of OM ANANT PALACE?

The registered promoter entity is YOGESHWAR DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in OM ANANT PALACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for OM ANANT PALACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at OM ANANT PALACE?

The professionals named in the filing: Architect: SWASTIK CREATION; Engineer: atul kudtarlar and associates; Chartered Accountant: ca amrrita jagnaani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in OM ANANT PALACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About OM ANANT PALACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save OM ANANT PALACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.