Home / Browse projects / Thane, Maharashtra / Olivia Bliss

Registered No litigation declared Others project

Olivia Bliss

By Jai Bhawani Orchid Infra LLP

RG-MH-49513 · RERA P51700046158 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
9 of 106Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

Olivia Bliss is a Others project by Jai Bhawani Orchid Infra LLP in Thane, Maharashtra, registered with MahaRERA as P51700046158 on 20 Jun 2022. Possession is promised by 31 Dec 2026. 97 of the 106 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameOlivia Bliss
  • TypeOthers
  • Location
    • Kalher
    • Kalher (CT)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700046158
  • ReraGenie IDRG-MH-49513

Builder

  • NameJai Bhawani Orchid Infra LLP
  • Entity typePartnership
  • PartnersPankaj Sureshkumar Mehta, Chirag Shamji Gada, Mahesh Jagan Salvi, Satish Kiranraj Punamiya, Ajitkumar M Chopda, Jignesh Gadda, Vinod Balaram Salvi
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

92%97 of 106 units booked
97.5%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Olivia Bliss B WingNA14131060106

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Olivia Bliss B Wing: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered39

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,440 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on2 Jun 2025
LandownerVillageDistrict
Ramniklal Jethalal ShahKalher (CT)Thane

Approvals and building plan

Sanctioning authorityMumbai Metropolitan Region Development Authority
Permissible FSI5936.7
Proposed, not sanctioned5,937 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalwa Branch, Creek View Apartment, 1st Floor, Bombay Pune Road,Kalwa, Thane - 400 605
Estimated costRs 22.52 cr
Cost incurredRs 21.96 cr
Work done97.52%
BuildingWingEstimatedIncurred
Olivia Bliss B WingNARs 20.59 crRs 20.59 cr
-NARs 1.93 crRs 1.37 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr. Atul Anil Gharat
ArchitectAtul Gharat
EngineerMr. Aditya Rajan Deshmukh
EngineerNitin Patil
EngineerSHRAVANI CONSULTANT
Chartered AccountantParesh Sabadra
Chartered AccountantV R S K and Co
Chartered AccountantP.N. SABADRA & Associates
PartnerRole in project
Jai Bhawani Orchid Infra LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jun 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 May 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - March 26 - Olivia Bliss .pdf2 Jul 2026
Withdrawal Update Form 1File: AR - March 26 .pdf20 May 2026
Withdrawal Update Form 2File: Updated ER March 2026.pdf20 May 2026
Withdrawal Update Form 3File: CA - March 26 Olivia -Final.pdf20 May 2026
Withdrawal Update Form 1File: AR - Dec 25 .pdf30 Apr 2026
Withdrawal Update Form 2File: ER - Dec 25 .pdf30 Apr 2026
Withdrawal Update Form 3File: CA Certificate_Olivia bliss_Dec 25 (1)-final.pdf30 Apr 2026
Form 5 (FY 2024-2025)File: Signed REA audit report.pdf12 Dec 2025
Withdrawal Update Form 1File: ARCHITECT OLIVIA SEP 2025.pdf27 Nov 2025
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE OLIVIA SEP 2025.pdf27 Nov 2025
Withdrawal Update Form 3File: CA olivia sep 2025 final.pdf27 Nov 2025
Withdrawal Update Form 1File: olivia bliss from 01.pdf4 Oct 2025
Withdrawal Update Form 2File: olivia bliss engineer certificate.pdf4 Oct 2025
Withdrawal Update Form 3File: CA June 25 final (2).pdf4 Oct 2025
Form 2A (FY 2023-2024)File: Olivia Bliss 2A_March 24.pdf5 Jun 2025
Form 2A (FY 2024-2025)File: Olivia Bliss 2A_March 25.pdf5 Jun 2025
Form 2A (FY 2022-2023)File: Olivia Bliss 2A_March 23.pdf5 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - June 24 .pdf2 Jun 2025
Form 1File: Architect certificate june.pdf2 Jun 2025
Form 2File: ER certificate jun 24.pdf2 Jun 2025
Form 3File: ca certificate Olivia june 2024.pdf2 Jun 2025
Form 1File: Architect Certificate-Sept-24.pdf30 May 2025
Form 2File: Enginner Certificate-Sept-24.pdf30 May 2025
Form 3File: CA Certificate-Sept-24 final.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure sept 24.pdf30 May 2025
Form 1File: Architect Certificate-Dec-24.pdf30 May 2025
Form 2File: Engineer Certificate-Dec-24.pdf30 May 2025
Form 3File: CA Certificate-Dec-24 final.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Olivia bliss discloser of sold -book inventory-20250305163348.pdf30 May 2025
Form 1File: Architect Certificate-March-25.pdf30 May 2025
Form 2File: Engineer Certificate-March-25.pdf30 May 2025
Form 3File: CA certificate Final.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold-book inventory 31-03-25-min.pdf30 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure sept 24.pdf28 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure - June 24 .pdf10 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure - June 24 .pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: sold book inventory - converted.pdf9 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf1 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory - converted.pdf1 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan 16 Jul 2024 (2).pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Jun 22.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Sep 22.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dec 22.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Jun 23.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Sep 23.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Dec 23.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Mar 24.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 JUNE 22.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 SEP 22.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 DEC 22.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 MARCH 23.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 JUNE 23.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 SEP 23.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 DEC 23.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 MARCH 24.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Cert Final Jun 22.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Cert Final sep 22.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Cert Final Dec 22.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 CA Cert Final Mar 23.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Cert Final Jun 23.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 CA Cert Final Sep 23.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA Cert Final Dec 23.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 CA Cert Final Mar 24.pdf15 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Report.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf22 Dec 2023
Disclosure of sold/ booked inventoryFile: Jai Bhawani_merged.pdf8 Apr 2023
Other - TechnicalFile: 2A.pdf8 Apr 2023
Details of encumbrances concerned to FinanceFile: ec to finance.pdf24 Feb 2023
Details of encumbrances concerned to LegalFile: ec to finance.pdf24 Feb 2023
Disclosure of sold/ booked inventoryFile: disclosure_merged_compressed.pdf24 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: other organisation.pdf24 Feb 2023
Proforma of Agreement for saleFile: deviation afs.pdf24 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate bank.pdf24 Feb 2023
Deviation Report with respect to Allotment letterFile: deviation of allotment letter.pdf24 Feb 2023
Other - LegalFile: PLINTH CERTIFICATE.pdf21 Jan 2023
Copy of the legal title reportFile: Title Report.pdf8 Jun 2022
Declaration in FORM BFile: Developers B.pdf2 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Signed (1).pdf2 Jun 2022
Proforma of Allotment letterFile: Agreement Draft.pdf2 Jun 2022
Layout approvalFile: Building Plan 1.pdf28 May 2022

How this compares with Thane

92%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Olivia Bliss on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalher7,600+ in Thane

2 kmOlivia BlissCompleted 1Lapsed / revoked 6Other 21Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: Jai Bhawani Orchid Infra LLP

JAI BHAWANI ORCHID INFRA LLP has 4 registrations on MahaRERA, including VIVANTA S BLISS and Olivia Bliss. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Olivia Bliss is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Olivia Bliss?

The registered promoter entity is Jai Bhawani Orchid Infra LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Olivia Bliss?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Olivia Bliss?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Olivia Bliss?

The professionals named in the filing: Architect: Mr. Atul Anil Gharat; Architect: Atul Gharat; Engineer: Mr. Aditya Rajan Deshmukh; Engineer: Nitin Patil; Engineer: SHRAVANI CONSULTANT; Chartered Accountant: Paresh Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Olivia Bliss?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Olivia Bliss. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Olivia Bliss to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.